This is a Statement of Work (SOW) for the procurement of a PERKO 19-inch optical drum complete assembly for the United States Coast Guard Cutter (USCGC) Spar (WLB-206). The U.S. Coast Guard requires a brand-new, OEM-specification optical drum assembly (Part Number 9501000) to replace the vessel's existing inoperable and corroded equipment, which is essential for conducting navigation aids, law enforcement, and search and rescue operations. The equipment must achieve direct drop-in compatibility with the existing configuration and meet all PERKO OEM specifications and marine manufacturing standards.
The contractor shall deliver the assembly with FOB Destination shipping terms to CGC SPAR at 1200 Minnesota Avenue, Duluth, Minnesota 55802 within 2-3 weeks after order award. The contractor must provide commercial packaging conforming to ASTM D3951 standards with sealed ports and connections to prevent corrosion during transit, and must notify the vessel's point of contact (CWO Jason Wilson) at least 48 hours prior to delivery. The contractor is responsible for all freight and handling costs, with $300.00 included in the bid for shipping to Duluth. Standard OEM manufacturer warranties covering defects in materials, design, and workmanship shall apply beginning upon final government acceptance. Any non-conforming or damaged items shall be replaced or repaired at no additional cost to the government. Receiving inspection will be performed by CGC Spar engineering personnel upon arrival, with acceptance contingent upon verification of correct part numbers, quantities, undamaged condition, and complete accompanying documentation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Procurement of PERKO 19” Optical Drum Complete Assembly
Customer: United States Coast Guard Cutter (USCGC) Spar (WLB-206)
Delivery Location: Duluth, Minnesota
Requisition / Reference: Fisheries Supply (Seattle, WA) & Donovan Marine (New Orleans, LA) Quotes
1. Scope of Work
1.1 Objective
The purpose of this contract/purchase order is to procure a PERKO 19-inch complete optical drum assembly (PN:9501000) for CGC Spar (WLB-206). All items must meet or exceed original equipment manufacturer (OEM) specifications to ensure direct drop-in compatibility, fit, form, and function with existing configuration.
1.2 General Requirements
The contractor shall supply, package, mark, and deliver brand-new (not refurbished, rebuilt, or previously used) OEM item in accordance with the specifications, delivery timelines, and technical requirements set forth in this Statement of Work.
2. Background and Vessel Information Vessel Name: CGC Spar (WLB-206) Vessel Class: 225-Foot, Seagoing Buoy Tender/ Juniper Class Homeport / Delivery Facility:
CGC SPAR (WLB-206)
1200 MINNESOTA AVE.
DULUTH, MN 55802
UNITED STATES
Point of Contact (POC): CWO JASON WILSON The shipboard optical drum assembly is inoperable/unrepairable due to heavy corrosion and in need of complete replacement to conduct essential aids to navigation, law enforcement, and search and rescue missions that may occur in a limited visibility environment.
3. Applicable Documents and Standards The contractor shall ensure that all equipment and materials provided adhere to standard marine and federal manufacturing practices:
OEM Standards: PERKO OEM equipment specifications.
Packaging & Preservation: Commercial packaging conforming to ASTM D3951 (Standard Practice for Commercial Packaging) suitable for safe freight handling, ocean/coastal environment, and storage.
4. Technical Specifications and Bill of Materials The contractor shall provide the exact items, part numbers, quantities, and configurations detailed below. No substitutions may be made without prior written authorization from the Contracting Officer (KO) or Contracting Officer’s Representative (COR).
4.1 Itemized Schedule of Supplies
| Item # |
| System Application |
| Description / Specifications |
| Part Number (P/N) |
| Qty |
| Unit Cost (USD) |
| Total Cost (USD) |
| 0001 |
| PERKO-9501000 |
| 19” DRUM COMPLETE W/ OPTICAL ASSY |
| 9501000 |
| 1 EA |
| $BIDS |
| $BIDS |
| 0002 |
| Freight / Logistics |
| Freight / Shipping & Handling |
FOB Destination delivery to vessel's home port in Duluth, MN
| N/A |
| 1 JB |
| $BIDS |
| $BIDS |
Total Estimated Price: $BIDS
5. Detailed Component Requirements
5.1 19” Drum Complete W/Optical Assy. (P/N: 9501000)
1. Complete 19-inch optical drum assembly.
2. Manufacture/Brand: Perko
3. SKU/ Part Number: PERKO-9501000
6. Delivery, Lead Times, and Freight Terms
6.1 Lead Times
The contractor shall deliver all line items in accordance with the following schedule starting from the date of order award / receipt of purchase order: 2-3 weeks ARO.
6.2 Shipping Terms & Destination
Terms: FOB Destination (Freight charges of $300.00 included as Item 0002 to vessel's home port in Duluth, MN).
Delivery / Shipping Address:
CGC SPAR (WLB-206)
1200 MINNESOTA AVE.
DULUTH, MN 55802
UNITED STATES
POC: CWO Jason Wilson Advance Shipping Notice (ASN): The contractor shall notify the vessel point of contact at least forty-eight (48) hours prior to anticipated delivery to ensure pier access and offloading support (crane/forklift).
7. Packaging, Packing, and Marking Protection: All assemblies and components shall be packaged in sturdy commercial containers or securely banded and shrink-wrapped to heavy-duty wooden pallets suitable for forklift and crane handling.
Moisture & Corrosion Control: Open piping ports, flanges, and electrical connections shall be sealed with protective caps, plugs, or desiccants to prevent dirt intrusion and corrosion during transit and temporary storage.
Marking: Exterior packages/crates must be marked with:
Requisition / Purchase Order Number Consignee: CGC SPAR, WLB 206, Attn: CWO Jason Wilson, 1200 Minnesota Ave. Duluth, MN Part Number and Item Description
8. Quality Assurance, Inspection, and Acceptance
1. Source Inspection / Factory Testing: All components shall undergo standard OEM factory quality assurance inspections.
2. Receiving Inspection: Receiving inspection will be performed by the Government (CGC Spar engineering personnel) upon physical arrival at the delivery point.
3. Acceptance Criteria: Acceptance will occur upon confirmation that:
All shipped items correspond to the ordered part numbers, descriptions, and quantities.
Goods have arrived free of shipping damage, physical defects, or contamination.
Accompanying documentation (packing slips, OEM manuals, test sheets, warranty certificates) is complete.
9. Warranty
1. The contractor shall provide standard commercial OEM manufacturer warranties covering defects in materials, design, and workmanship.
2. Warranty period shall begin upon final Government acceptance of the delivered equipment.
3. Any item discovered to be non-conforming or damaged upon delivery shall be replaced or repaired by the contractor at no additional cost to the Government.
10. Government Points of Contact
10.1 Government Technical Point of Contact
Customer / Vessel: CGC SPAR (WLB-206) Delivery Address:
CGC SPAR (WLB-206)
1200 MINNESOTA AVE.
DULUTH, MN 55802
UNITED STATES
Point of Contact: CWO Jason Wilson (Engineering Officer, CGC Spar), 210-701-9864, Jason.r.wilson@uscg.mil Alternate Point of Contact: CWO Christopher Cleveland (Asset Manager, IBCT Product Line), 410-564-6996, Christopher.p.cleveland@uscg.mil
File details come from the government source that posted it. Updated .