This document contains questions and answers regarding a solicitation to upgrade a video surveillance system at a federal office building in St. Louis, Missouri. The solicitation seeks a contractor to upgrade an existing IP video surveillance system by installing new fiber optic cables, ethernet cabling, and unified power supplies. The contractor will be responsible for assessing the building's power infrastructure and fiber connectivity and determining specifications for new cables and conduits to connect cameras and network equipment. Testing requirements and procedures for the upgraded systems are outlined. Historic building approvals and asbestos abatement may be required. Drawings are listed in appendices but field verification of measurements will be needed. The government may extend the solicitation's due date if more time is needed for responses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question No QUESTION Gov't RFQ Reference ANSWER
1)What is the existing power infrastructure?
2) Is the power supply stable?
3) Will UPS(s) be required?
4) If so, what is the power requirement?
5) How many UPS? SOW
1) The building has commercial eletrical power. 2) Yes. 3) Yes (reference both SOW, E.1.4). 4) Contractor to determine power requirements, Reference E.1.4 and F.2.6.
5) Contractor to determine power requirements, Reference E.1.4 and F.2.6.
1) Are there existing fiber optic access points?
2) Will new fiber optic cables be required?
3) If so, what type?
4) What are the lengths of the fiber optic cables from point of origin to end destination?
5) How many fiber optic runs?
6) What termination types will be required? SOW
1) Yes. 2) Yes. 3) reference Rear Gate SOW, B.2.1. 4) approx 900 feet, exact length needs to be determined by contractor per SOW C.2.5. 5) Per SOW B.2.1.8, at least 1 from rear guard shack to building but could be more dependant upon contractors quotation. 6) Small Form- Factor Plugable (SFP)
1) Will trenching be required?
2) If so, are the utility locations marked on the ground and/or properly documented?
3) Will dig permits be required?
4) Who will be required to obtain the digging permits? SOW
1) Yes. 2) No, Reference VSS Rear Guard Shack SOW C.5. 3) Contractor to determine what permits are required. SOW C.1.5 4) contractor SOW C.1.5
1) Will lead and asbestos abatement be required?
2) Have the buildings been tested for lead and asbestos?
3) If so, will the government provide the results of the testing?
4) Are there any other health hazards associated with the applicable installation and maintenance? SOW
1) Yes. 2) Yes. 3) Yes reference appendix C.7.2 ) unknown
1)Are any of the buildings listed as historic buildings?
2) If so, who will determine the locations approved for possible drilling and camera placement? SOW
1) Yes, Reference A.3 and E.5.9.
2) Apendix C.7.4 a- e & Appendix C.5.1 and C.5.2
1) Is the existing camera system analog or IP?
2) Are the cameras connected by ethernet or coax cable? SOW B.1
1) IP SOW B.1 2) Ethernet SOW B.1
1) Is Cat6 plenum indoor and outdoor cable required?
2) What type of connectors, RJ45 crimp connector or Keystone punch down jacks?
3) Are there existing cable raceways or paths to route the new ethernet through?
4) Will conduit be required?
5) If so, what type and how many feet? SOW
1) Yes, SOW E.3 2) either. RJ45 with switches or punchdowns with patch panel, however RJ45 will be necesary to connect patch panel with switches. 3) yes but new pulls will be required where they don't exist. SOW E.3.3 - E.3.4 4) yes SOW E.3.4 5) measurements to be determined by contractor per SOW C.2.5.
1) Will existing equipment need to be tested?
2) If so, what type of equipment?
3) Number of each? SOW
No
1) Will existing cameras need to be replaced?
2) If so, how many cameras need to be replaced?
3) What type and/or brand of cameras are they to be replaced with? SOW
No
Camera locations:
1) How many cameras are/will be mounted above 12' on the buildings/poles?
2) How many cameras are/will be roof top mounted?
3) How many cameras are/will require a lift? SOW
1) 0. 2) 0. 3) 0.
11 Do the buildings have drop ceilings, or are they solid ceilings between floors? SOW The buildings have both drop ceilings and solid ceilings between floors
1) Are “To Scale” drawings available for publication?
2) If not, what is the length, width, and height of the building(s). SOW
The only drawings available are listed in appendices. 2) Contractor to verify all measurements, reference SOW C.2.5
13 What are the “testing requirements” for the new or upgraded system(s)? SOW Reference SOW E.4, F.3 and F.4 for all testing requirements.
14 Is the government able to extend the solicitation’s due date?
Yes, the government is able to extend the solicitation's due date if it is determined by the government that more time is needed.
RFQ: 70RFP423QE6000003
Amendment: 0003
Sheet1