Response to Industry Questions - NBACC RFP.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- 70RFP323RE3000005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| Amendment 0002 - Revised Attachment 6 - Price Element Breakdown Spreadsheet.xlsx | XLSX spreadsheet | |
| Amendment 0001.pdf | ||
| 70RFP323RE3000005 conformed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions
| Q No. | Solicitation or Attachment | Question | Government Response |
| 1 | Attachment 1: Statement of Work | We are advised that the hourly rate for emergency PSO services shall be inclusive of all costs directly related to or incidental to providing services when ordered. We are also informed that requirements under emergency force service CLINs shall be short term in nature. Under which CLIN should these services be considered for pricing purposes? | There is no requirement for ESS under this contract. |
| 2 | Attachment 1: Statement of Work | We are directed to obtain applicable permits, titles, inspections, and registrations for the operation of vehicles, and that all costs for operation and maintenance of vehicles, including license and insurance fees, is a cost to the Contractor. However, Section 5 of Exhibit 10 indicates that no vehicles are required of the contractor. Would the Government please clarify which is accurate? | There is no vehicle requirement under this contract. |
| 3 | Exhibit 10: Contractor Provided Equipment | At Section 4 of Exhibit 10, there is a note that reads: NBACC provides radios/frequency to PSOs. No Contractor provided radios/cell phones required on post. The paragraphs below the table of equipment continue with guidance regarding equipment capability, and instruction to provide a listing of radio(s) and associated equipment used to the COR prior to standing post, as well as cellular telephone numbers. There appears to be a contradiction; please clarify. Is the NBACC providing radios for contractor use? If so, is the contractor still required to provide a list of radios and equipment to the COR? | The customer, NBACC, will provide the radios and frequencies. If deemed necessary, as a business decision, the vendor can provide the PSOs with a cell phone to allow the on-site PSOs to call the vendor contract manager and supervisors as needed. |
| 4 | Attachment 9: Proposal Submission Checklist Attachment 5: Department of Labor Wage Determination(s) Attachment 6 - Separate File: Price Element Breakdown (Suggested Format) | On page 412, at paragraph 3, we read: “The minimum wage rates and fringe benefits applicable to this contract are outlined in the attached Department of Labor (DOL) prevailing wage determination(s) and/or the predecessor contractor’s Collective Bargaining Agreement(s).” Attachment 5, Department of Labor Wage Determination(s), contains a single CBA (CBA-2023-80) that addresses Armed Security Officers, and no other labor categories/positions. Attachment 6, on the non-PSO positions tab, lists managerial, instructional, and administrative personnel, not all of which are exempt from the SCLS. There is no SCA WD referenced in the solicitation document pages. Would the Government please clarify if does one apply? And if so, request it be incorporated into the solicitation documents. | The only SCA labor category to be engaged in performance of services required by the contract is Guard II. The wage determination for this contract is CBA-2023-80. It provides the minimum wage rate and fringe benefits for all Guard II PSOs (non-supervisory) on the contract. Any non-PSO positions proposed by the offeror are not considered service employees engaged in the performance of the contract. There is no SCA WD provided for the non-PSO positions under this requirement. |
| 5 | Attachment 1: Statement of Work | In paragraph 14.4.2, we read that the Contractor shall designate an area off Government property for the PSOs to clear and clean their duty weapon, and that only the COR can approve such activity near a Federal facility. Do we correctly interpret this to mean a Contractor-provided facility needs to be included in our proposal for weapon cleaning and clearing? Is there an armory available in which this can be accomplished? How is this requirement being handled by the incumbent? | The customer, NBACC, provides a space at the facility for weapons to be cleared and stored which includes a safe and clearing barrel. The supervisors on-site issue these weapons from this room during each shift. Authorized contractor individuals are allowed to remove the weapons in bulk for maitenance or weapon qualifications. |
| 6 | Attachment 5 - Wage Determination | Has the CBA allowed for an increase in holidays to include Juneteenth via MOU? | Yes, the MOU will be provided as amendment 0001 to the solicitation. |
| 7 | Attachment 1 - Statemet of Work | Is the Post Tracking System (PTS) currently in use at all buildings? If not, when does the Government anticipate the new Post Tracking System (PTS) will become active on this contract? | PTS is currently active under this contract. |
| 8 | Attachment 2 - SOW Exhibits | What is the required weapons platform to be used on the new contract? | The weapon for the new contract is 9mm. |
| 9 | Attachment 2 - SOW Exhibits | What is the current weapons platform used by the incumbent Guards at each building? | The weapon for the current contract is 9mm. |
| 10 | Attachment 2 - SOW Exhibits | Are shotguns required at any facilities? | No, there is no requirement for shotguns. |
| 11 | Attachment 1 - Statement of Work | The current CBA allows for Guard Mount. At the current sites, is there allowed weapons and ammo storage space, and where is this located in relationship to the post(s) location? | There is space at the facility provided by the agency, NBACC, for weapons and ammo storage. It is located adjacent to Lobby area. |
| 12 | Attachment 1 - Statement of Work | Are firearms required to be stored on site or are PSOs required to take weapons home after shift? | All weapons are required to be stored on-site. Authorized contractor individuals are allowed to remove the weapons in bulk for maintenance or weapon qualifications. |
| 13 | Attachment 2a - Post Exhibit | Is the level of effort reflected in the RFP the same level of effort that is currently being performed by the incumbent guard force? | No, please review the post exhibit. Posts 10-15 are new posts being added to the contract at performance start, which is currently planned for 10/01/2023. |
| 14 | Attachment 2a - Post Exhibit | Are there any staffing issues on the current contract? | Information pertaining to current staffing strategies utilized by the predecessor vendor is not releasable or necessary for offerors to submit a proposal under this solicitation. |
| 15 | Attachment 1 - Statement of Work | Are current contractor employees fully qualified in terms of training completion? | Yes |
| 16 | Attachment 1 - Statement of Work | Is there an NWDTP certified Instructor on the contract? | Yes |
| 17 | Attachment 1 - Statement of Work | Are the current PSOs and Supervisors trained to the NWDTP standards in the solicitation? | Yes |
| 18 | Attachment 1 - Statement of Work | Is an on-site Contract Manager required for this contract? Will office space be provided? | There is space available at the facility for the site supervisors. There is no dedicated office at the facilty for the Contract/ Program Manager. This is no contract requirement for an on-site Contract Manager (CM). All corporate and training staff must request access to visit the site and pre-coordiate this with COR and agency before being allowed into the facility. |
| 19 | Attachment 1 - Statement of Work | Does the incumbent have a Program Management Office onsite? | There is space available at the facility for the site supervisors. There is no dedicated office at the facilty for the Contract/ Program Manager. All corporate personnel and training staff must request access to visit the site and pre-coordiate this with COR and agency before being allowed into the facility. |
| 20 | Attachment 1 - Statement of Work | With vehicle screening required at the access control posts, will the vehicle screening equipment provided by the government? | Vehicle screening equipment will be provided by the customer, NBACC. |
| 21 | Attachment 2a - Post Exhibit | Will the addition of the SCIF in currently proposed for OY2 and beyond have any additional corresponding supervisor hours, or will it utilize existing management? | No additional supervision is currently planned for the new SCIF Annex when it is added to the contract. |
| 22 | Attachment 2 - SOW Exhibits | Will the government provide a completed PSO certification list pursuant to this solicitation (Attachment 2)? | No, it will be provided to the successful vendor during transition. |
| 23 | General | Would the government provide the number of TAS and ESS hours performed in each of the last 3 years? | There has been no TAS or ESS performed in the last 3 years. Further, ESS is not a requirement under this contract. |
| 24 | Attachment 2a - Post Exhibit | Given the beginning start date of two new posts (10-15 and Annex), and the level of clearance needed (Secret, Top Secret SCI), will the government allow for any leniency in staffing due to prolonged clearance approval from the government? | The Government expects the vendor to be 100% staffed by the performance start date. Any potential clearance delays caused by the Government would be discussed at that time during transition. |
| 25 | Solicitation Provision, C. 1. Staffing Plan | Regarding Solicitation Provision, C. 1. Staffing Plan: Will the government disclose the amount of requested TS-SCI cleared individuals that will be sufficient to stand post, assuming this is above the post requirements? | It is responsibility of the vendor to review the post exhibit and provide their own estimates and plan for staffing this requirement. |
| 26 | General | Would the government confirm the last Contract Award amount and/or provide the contract number? | The current contract number is 70RFP319DE3000004 and the current dollar value is $19,467,190.42. |
| 27 | Attachment 2a - Post Exhibit | Post Exhibit Row 9, Post 8 indicates that this post is staffed Monday through Friday, and on Selected Holidays. Which holidays is this post staffed? | For this post, the vendor will be required to provide coverage Monday Friday as well as all federal holidays during each performance period. |
| 28 | Attachment 5 - Wage Determination | SCA adjustment question – The existing CBA expires on 9/30/2023 with no raise for 10/1/2023. The last raise was $31.80 given on 10/1/2022. If a Company decided to bid the 10/1/2023-9/30/2024 period at a rate of $33.80 giving the PSO’s a $2.00 increase. Then negotiates a new CBA accordingly with an additional $2.00 increase on 10/1/2024. Would the SCA adjustment allowed on the 10/1/2024-9/30/2025 period be for the entire increase of $31.80 to $35.80 ($4.00) or only for the $2.00 increase or change in rate on 10/1/2024? This will affect how you price out the option years. | The vendor would only be entitled to a $2.00 increase in this scenario as per the Service Contract Act (SCA), the adjustment is based on the wage increase stated in the CBA that is above what the PSO is currently being paid, which is verified by payroll records submitted as part of the SCA wage adjustment request. For additional information, please refer to to FAR 52.222-43(d)(1) |
| 29 | Attachment 1 - Statement of Work | Will the Government provide office space for the Contract Manager? If yes, will the CM have to be cleared to work onsite and at what level? | There is space available at the facility for the site supervisors. There is no dedicated office at the facilty for the Contract/ Program Manager. All corporate and training staff must request access to visit the site and pre-coordiate this with COR and agency before being allowed into the facility. |
| 30 | Attachment 2a - Post Exhibit | The post exhibit has two “relief officers” listed. It also lists all post as requiring “relief on post”. Are these officers that will assist in giving breaks or do they have another function? | The officers will provide relief as needed to PSOs on post as well perform patrol and response duties when not providing relief. |
| 31 | Attachment 1 - Statement of Work | Is there a requirement to keep the weapons stored on site? | Yes, all weapons must be stored on-site. Authorized contractor individuals are allowed to remove the weapons in bulk for maintenance or weapon qualifications. |
| 32 | Attachment 1 - Statement of Work | Can an interim Secret clearance be used to staff the Secret posts? | No, interim clearance cannot be used to staff Secret posts. |
| 33 | Contract Terms and Conditions | Considering the economic uncertainty and inflation present in the labor market and material supply chain today there is serious doubt concerning price stability during the extended period of contract performance. The uncertainty is industry-wide and outside the contractor's control. The solicitation pricing instructions require the contractor to include both labor and associated material and other costs into one firm fixed labor rate, which increases the economic risk to the contractor even further. The market variables for labor and materials are too unstable to permit a reasonable division of risk between the Government and the contractor. Under the current economic circumstances, would the Contracting Officer consider including the clause at FAR 52.216-4, Economic Price Adjustment-Labor and Material, or the clause at FAR 52.216-5, Price Redetermination-Prospective, or an agency-prescribed clause as authorized in paragraph (a)(2) of FAR 16.203-4? | No, the government will not include these clauses into the solicitation. |
| 34 | Contract Terms and Conditions | If the government is unwilling to include FAR 52.216-4 or -5 in the contract, would the Contracting Officer consider separating the direct labor rate from materials and other ODCs and including the materials and other ODCs on a separate cost-reimbursement CLIN? | No, the government will not change the pricing structure of the contract. |
| 35 | Attachment 2a - Post Exhibit | Can the Government confirm that Post numbers 10 through 15 are the only changes in the level of effort on this contract? | Yes, along with the SCIF Annex post that is planned to start performance during Option Period 2. |
| 36 | Attachment 1 - Statement of Work | Can the Government confirm on average, historically, how much TAS they used annually over the past contract term of five years? | Over the past 5 years, there has been zero (0) TAS performed at this location |
| 37 | Attachment 2 - SOW Exhibits | Exhibit 10, item 4. Communications Equipment Requirement it states “ The Contractor shall provide, maintain, and supplement, as may be necessary at the site identified above, the following number(s) of radios/cellular phones and described associated equipment/ to equip each security officer on post a method to communicate with FPS”, the note above states “ NOTE: NBACC provides radios/frequency to PSOs. No Contractor provided Radios/ Cell Phones Required on Post.” In Exhibit 11A Government-Provided Supplementary Equipment it states, NABCC shall furnish Radios/chargers/carry case and Government Radio Frequency, and “The Government shall furnish the following supplemental equipment items for each security officer, post, or location as indicated to all productive and supervisor security officers performing on the Contract. It is the Contractor's responsibility to report maintenance issues and any damage regarding the associated equipment immediately to the COR.” Based on both Exhibit 10 and 11a can the government confirm that all required communication equipment will be provided by the Government as well as any supplementary equipment throughout the life of the contract? | The customer, NBACC, will provide the required radios and frequencies for this contract. If deemed necessary, as a business decision, the vendor can provide the PSOs with a cell phone to allow the on-site PSOs to call the vendor contract manager and supervisors as needed. |
| 38 | Solicitation Provision - Relevant Past Performance | Many government points of contact will not provide a response if a CPARS is available. Will the government accept the most recent CPARS in lieu of providing a past performance questionnaire? | Yes |
| 39 | Solicitation Provisions | Can the headers, footers, and title page be exempt from the 11 point font restriction? | The requirement is for 11 point font. If a vendor goes below that font, the Government is not responsible if the font is not legible. |
| 40 | Solicitations Provisions | Can tables, figures, and graphs included in the proposal be in a 10 point font size? | The requirement is for 11 point font. If a vendor goes below that font, the Government is not responsible if the font is not legible. |
| 41 | Attachment 1 - Statement of Work | SOW 6.7.3.1.1.1: Is there a required (or suggested) quantity of contractor employees who must be certified as the NWDTP Instructor? | It is the responsibility of the vendor to review the solicitation to ensure they provide enough NWDTP Instructors to meet the training requirement. |
| 42 | Attachment 1 - Statement of Work | Does the government know how many of the incumbent’s current guard force are certified as NWDTP Instructors? | Information pertaining to current staffing strategies utilized by the predecessor vendor is not releasable or necessary for offerors to submit a proposal under this solicitation. |
| 43 | Attachment 1 - Statement of Work | Is the incumbent employee’s NWDTP Instructor certification “transferrable” if hired by a new contractor? Or, would they have to completely re-certify? | Yes, the incumbent certified NWDTP Instructor’s certification is transferrable from contract to contract as long as the NWDTP instructor maintain his or her annual re-certification in accordance with the SOW. |
| 44 | Attachment 1 - Statement of work | Will each offeror be required to have Top Secret facility clearance at time of proposal submission | Yes |