TE-23 Preventative Maintenance.pdf
PDF 70 KB Posted
- Attached to
- Full Food Service for FLETC, Glynco, GA.
- Solicitation number
- 70LGLY27RGLB00002
About this file
This document is a Performance Work Statement (PWS) maintenance responsibility matrix that delineates contractor and government obligations for facility operations and equipment maintenance at a dining facility and associated buildings.
The Contractor is responsible for preventive maintenance and repair of twenty-five equipment and system categories, including air handling units (AHU), fan coil units (FCU), ductwork, exhaust hoods, filters, belts, kitchen equipment (dishwashers, ovens, ice machines, steam kettles, walk-in coolers, pulpers), condensate tanks and pumps, handicap access mechanisms, stairs, roof exhaust fans, portable GFP coolers, and pumps and motors. Maintenance must comply with approved preventive maintenance schedules, manufacturer recommendations, and applicable codes. High-risk items under contractor responsibility include AHUs, roof AHUs, FCUs, dishwashers, ductwork, exhaust hoods, roof exhaust fans, handicap access, and fan coil units. Medium-risk contractor responsibilities include condensate tanks, filters and belts for exhaust hoods and HVAC units, ice machines, ovens, portable coolers, pulpers, pumps and motors, stairs, steam kettles, and walk-in coolers. Low-risk contractor items include ice cream machines, freezers, mechanical rooms, and mini-splits. The Government retains responsibility for fire alarm systems, capital improvements, and certain preventative maintenance at Building 260. The Contractor must furnish all materials, parts, components, and equipment necessary to maintain systems in safe, efficient, and reliable operating condition, matching the type, grade, quality, and size of original equipment. Monthly and weekly inspection reports with documentation requirements are mandated for specified equipment categories.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
System/Equipment Type of Maintenance Responsible Comments Risk Level
Air Handlers Units (AHU) Ref. PWS 5.4 Contractor Contractor responsible for repair and maintaining for operational requirements (Belts, filters and cleaning).
High
Condensate Tank/Pumps Ref. PWS 5.5 Contractor Contractor is responsible for the repair for keeping condensate Tank/Pumps operational.
Medium
Dishwasher Ref. PWS 5.6 Contractor Contractor is responsible for all kitchen equipment. High
Ductwork Ref. PWS 5.7 Contractor Contractor is responsible for the repair for keeping ductwork operational.
High
Exhaust Hood Maintenance and Repair or Replace
Ref. PWS 5.8 Contractor Contractor is responsible for repair for keeping exhust hood operational.
High
Fan Coil Units (FCU) Ref. PWS 5.9 Contractor Contractor responsible for repair and maintaining for operational requirements (Belts, filters and cleaning).
High
Filters/Belts - Exhaust Hoods Ref. PWS 5.10 Contractor
Contractor is responsible for conducting preventative maintenance service and keeping equipment operational. The Contractor shall ensure all kitchen and serving line hoods, filters and filter grids are clean, dry, and grease free at all times.
Absorption units on the roof shall have absorption media changed at each cleaning.
Medium
Filters/Belts - HVAC Units Ref. PWS 5.11 Contractor
The Contractor shall inspect, operate, maintain and repair all the mechanical systems and associated equipment/components within the facilities, and structure in a safe, efficient, reliable operating condition. All parts, material, components and equipment necessary to maintain these systems, and associated equipment in a safe, efficient, and reliable operating condition shall be furnished by the Contractor and shall be of the same type, grade, quality and size as the original equipment. The parts, materials and components are items such as filters, belts and other associated parts.
Medium
Handicap Access Ref. PWS 5.12 Contractor
Contractor shall be responsible for any repair or replacement needed and any new installation unless the entire door unit is being replaced. If entire door unit is being replaced, the Government is responsible to replace the Handicapped Access mechanism.
High
Ice Cream Machine/ Freezer Ref. PWS 5.13 Contractor Contractor is responsible for all kitchen equipment. Low
Ice Machines Ref. PWS 5.14 Contractor Contractor performs preventive maintainance, repairs and replaces
Medium
Mechanical Rooms Ref. PWS 5.15 Contractor Contractor is responsible for ensuring that rooms are clean and repair of associated equipment is completed in mechanical rooms.
Low
Mini-Splits - North & Southside - One each
Ref. PWS 5.16 Contractor Contractor is responsible for the repair for keeping Mini-Splits operational.
Low
Ovens Ref. PWS 5.17 Contractor Contractor is responsible for all kitchen equipment. Medium
Portable GFP Coolers Ref. PWS 5.18 Contractor
The Contractor shall maintain the equipment in accordance to specifications provided by the manufacturer. The Contractor shall perform monthly inspections of the Portable Coolers, and shall prepare and maintain a monthly Inspection Report. This report shall be submitted to the COR monthly with the invoice and be made available to the CO/COR upon
Medium
Pulpers (North & South Sides) Ref. PWS 5.19 Contractor
Contractor is responsible for all kitchen equipment.
The Contractor shall maintain the equipment in accordance to specifications provided by the manufacturer. The Contractor shall perform weekly inspections of the Pulpers, and shall prepare and maintain a weekly Inspection Report. This report shall be submitted to the COR monthly with the invoice and be made available to the CO/COR upon request.
Medium
Pumps & Motors (See Mechanical Room Lists)
Ref. PWS 5.20 Contractor Contractor is responsible for the repair for keeping all pumps & motors operational.
Medium
Roof Air Handlers Units (AHU) Ref. PWS 5.21 Contractor Contractor responsible for repair and maintaining for operational requirements (Belts, filters and cleaning).
High
Roof Exhaust Fans Ref. PWS 5.22 Contractor
Contractor is responsible for repair for keeping exhust hood operational. Contractor is responsible for repair to keep exhaust fans operational and shall inspect quarterly and clean as required to remove dirt and grime, wasps and other insect nests, and cobwebs and/or any other debris. Government is responsible for capital improvements
High
Stairs Ref. PWS 5.23 Contractor
Contractor is responsible for maintaining and completing preventative maintenance of stairs.
Government is responsible for all preventative maintenance at building 260.
Medium
Steam Kettles Ref. PWS 5.24 Contractor Contractor is responsible for all kitchen equipment. Medium
Walk-In Cooler Ref. PWS 5.25 Contractor
The Contractor shall provide all materials, parts, and equipment for the operation, maintenance and repair/replacement of the walk-in coolers the Dining Hall, Building 75 and Bldg. 260.
Medium
Fire Alarm Ref. PWS 5.26 Government Government is responsible for calls, replacement, or new installment.
High
The Contractor must conduct preventive maintenance in accordance with the approved Preventive Maintenance Schedule, manufacturer recommendations, applicable codes, and this PWS.
Sheet1
File details come from the government source that posted it. Updated .