About this file

This document contains questions and responses regarding a solicitation for telecommunications cable system support for the Federal Law Enforcement Training Center's training delivery points. The solicitation seeks a contractor to provide primarily singlemode fiber with some multimode fiber for internal use, as well as PE89 copper cable. There is no incumbent or preferred manufacturer specified. Floor plans and drawings of existing infrastructure will be provided. Pricing is for a firm fixed price blanket purchase agreement with an initial one-year term and two optional one-year extensions. Line items are intended for evaluation and subsequent work will be ordered and invoiced using undefined labor and material line items. Questions regarding material lead times, site-specific pricing sheets, and treatment of non-priced items are addressed. The estimated value was not provided.

View the file

Other files

File Type Posted
70LGLY23QSSB00085 Amendment 1.pdf PDF
Telecommunications Cable System Support Contract_Attachment 1.xlsx XLSX spreadsheet
70LGLY23QSSB00085.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Responses to Questions

Is there an incumbent? And if so who? A. No

Is there a preferred manufacturer for the requested cable and fiber? And if so who?

No Brand name Preference.

Is there a preferred manufacturer for the equipment other than the items that state one presently? And if so who?

No Brand name Preference

In regards to the fiber, Is this requirement for singlemode, multimode or for both?

Primarily Singlemode with some multimode for internal use

In regards to the OSP copper cable, is there a preferred gauge and any requirements for either PE39 or PE 89?

Generally, PE 89

What is the estimated value of this contract?

This will be a BPA, BPA calls will be issued when a requirement arises. Travel will vary depending on where the requirement is located.

Training Delivery Points (TDPs) located at Glynco, GA, Charleston, SC, Cheltenham, MD and Artesia, NM. How much travel will be required? Especially to Cheltenham, MD and Artesia, NM?

We a looking for a vendor who has a presence in these locations or can find a subcontractor at each location who can meet our requirements.

Is the Government able to provide the floorplan for each level showing drops, telco rooms, etc. and/or the OSP plans showing any OSP installation construction drawings.

Yes, we will provide floor plans and drawings .

Can the Government please provide clarification on the below three items stated in the BOM:

Provide FO Patch Cable (per foot) – simplex or duplex or both?

Primarily duplex

Provide FO Connectors – Need to know type – Splice on, Mechanical, Pig Tail packs etc.

Both splice and pigtail

Provide FO Patch Panel – Loaded or Unloaded? If loaded, what fiber type?

Either

Is a General Contractor License or Low Voltage Permit required?

No, not required but preferred.

In block 20, the Period of Performance is shown as 9/20/2023-9/19/2026. Can the Government please confirm that this BPA has a duration of 5 years?

It will be one year with two more optional years.

Can the Government clarify the intent of the line item pricing? Is it for evaluation purposes only? Or will these rates be utilized for base year performance? If utilized for performance, will these rates be subject to annual escalation increases?

Task and Material List is intended to be utilized for performance as a fixed item pricing for the length of the contract.

Will the Government consider providing baseline parameters for line items so that Contractors price the same performance. For example, “all line items should be priced as if conditions were drop-ceiling with no obstruction.”

The information that Contractors are expected to provide for proposals are based on the Task and Materials Task Descriptions.

For items requesting pricing by the foot, can the unit be changed to 100 feet to better reflect project conditions?

FLETC’s intent is to only be charged for materials used “Per-Foot”. If the Contractor would like to submit proposal per 100 feet and then round off to the nearest foot at the time of the job for the purpose of invoicing, this is excitable.

Can the Government clarify how materials and labor for items not listed on the Price Sheet will be addressed. For example, core drill, building entrance, fire sleeve, OSP obstructed existing conduit, cable racking in IT closets, wire managers, etc.?

When FLETC request a task order quote for a job that requires unlisted task and materials, items 9.4-Undefined Labor Requirements (requires comments) and U.1-Undefined Material Requirements (requires comments) will be used by the Contractor to record and invoice FLETC. These line items are not expected to be cost proposed until needed at time of task order request.

Due to variance in performance variables for each of the FLETC campuses, would the Government consider issuing a pricing sheet for each site?

No

How will issues with material lead-times be addressed? Due to current market conditions, lead-times may delay mobilizations after award. Contractor seeks confirmation Government will work with contractor on case-by-case basis regarding these manners.

FLETC will provide task order due dates which we will look for the Contractor to provide feedback on the ability to meet. FLETC will work with contractor on case-by-case basis on supply chain issues.

Can the Government provide an estimated value for the BPA? Or estimated values for each facility?

No