70LGLY23QGLB00122 Questions.pdf

PDF 343 KB Posted

Attached to
Shipping Containers (Used), Delivery & Placement
Solicitation number
70LGLY23QGLB00122
Issued by

About this file

This document contains questions and answers related to federal contract solicitation number 70LGLY23QGLB00122 for the delivery and placement of used shipping containers. The solicitation is being conducted by the Department of Homeland Security Federal Law Enforcement Training Center. The questions and answers provide clarification that the contractor will not be responsible for any necessary site work, installation of conduits, HVAC units, or insulation of container bottoms. One container requires sprayed closed cell R14 insulation on the sides and top. Placement of the containers will be directed onsite by the Contracting Officer's Representative.

View the file

Other files

File Type Posted
Sol_70LGLY23QGLB00122.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

70LGLY23QGLB00122 Questions & Answers

1. Do you want all containers secured to the ground?

A: No. Only the double stacked containers if required by manufacture.

2. What surface will they be set on?

A: Dirt/Grass

3. Can the end user confirm the area where the containers are to be set is compacted and level and does not require any site work.

A: Any necessary site work will be performed in house by the government.

4. If the containers are to be set in vegeta�ve cleared area is the contractor responsible for the compac�on and placement of aggregate to provide a stable level base course for the containers to placed on?

A: No.

5. Will we have to install conduit for electrician or solar?

A: No.

6. Due to the Quan�ty of containers, will we be able to leave the equipment on site?

A: Yes

7. Will we need to install any HVAC unit in the container?

A. No.

8. There is one container that needs to be insulated, we would like to know what type of R-factor insula�on the government would like us to install. Rigid foam glued to sides and ceiling and then install 3/4 plywood over insula�on to walk on?

A. Sprayed, Closed Cell R14 (approximately 2 inches thick), floor does not require insula�on.

9. Does the container with foam need to be completely insulated (all 4 sides) including the botom or just sides and top?

A. Just sides and top.

10. The layout will be something similar to the picture below. Placement will be directed by the Contracting Officer’s Representative onsite:

(end)