Amendment_1_-_Att_26_-_RFI_Responses_Dated_20171201.docx

DOCX document 47 MB Posted

Attached to
Relocate Modular Building 760 at the Federal Law Enforcement Training Center, Glynco, GA
Solicitation number
70LGLY18QSSB00010
Issued by

About this file

Amendment 1 -Att 26, Request for Information Responses, dated 01 Dec 2017

View the file

Other files

File Type Posted
Amendment_1_-_SF_30.pdf PDF
Amendment_1_-_Att_01_-__FY18_20171201.pdf PDF
Att 23 Financial Questionnaire.pdf PDF
Att 20 SF1444-13a.pdf PDF
Att 15 85P.pdf PDF
Att 17 Security Training List.pdf PDF
Att 03 SF25A-14a.pdf PDF
Att 22 SFLLL.pdf PDF
Att 07 FMD_70.pdf PDF
Att 14 OF306-11.pdf PDF
Att 12 OSPR-17 Badge Application.pdf PDF
Att 16 Security Handout.pdf PDF
Att 11 Non-Disclosure Agreement.pdf PDF
Exhibit B - FTC-OSPR-17Z Day Pass Application.pdf PDF
Exhibit A - Proposal breakdown.xls XLS spreadsheet
Att 12 OSPR-17A Badge Application Addendum.pdf PDF
Att 09 WH 347.pdf PDF
Att 18 DBA GA172.pdf PDF
70LGLY18QSSB00010 20111107.pdf PDF
Att 21 SF_24-98.pdf PDF
Att 06 Format FIN INST ILC CONFIRM.pdf PDF
Att 13 I-9.pdf PDF
Att 05 Format ILC.pdf PDF
Att 10 FMD_42.pdf PDF
Att 02 SF25-14.pdf PDF
Att 08 WH-347 Instruction.pdf PDF
Att 01 - FY18 20171108.pdf PDF
Att 19 SF1413-13b.pdf PDF
Att 24 DHS-Form-700-3_1.pdf PDF
Att 25 DOL POSTER.pdf PDF
Att 04 SF28-03a.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSFLGL-17-Q-00302

Relocate Trailer 760 Request for Information

1
Question
Will FLETC provide topo survey information (to include elevation) applicable to the new site for Modular Building 760? Or will Contractor be required to have his own topo survey conducted after project award?
Response
FLETC will not provide a topographical survey for the new site for Modular 760. The contractor will be responsible for any topographical survey.
2
Question
Please provide additional details and, or installation requirements for new aluminum entrance decks and steps, to include anchorage to building. Also provide any specific material finishing requirements for aluminum.
Response
Pre-fab steps should installed according to manufacturer’s instructions
3
Question
Prior to requesting dig permit, site needs to be investigated for any existing buried and, or abandoned utility lines. Are there any utility drawings for this site? Will FLETC officials perform this site investigation and provide flagging and, or marking? Or will Contractor be required to investigate site for any underground utilities after project award?
Response
There are no utility drawings for this area. The contractor shall verify the location of all utilities prior to any excavation.
4
Question
Existing Modular Building 760 has damaged walls and ceiling. Will Contractor be required to make repairs to the damaged walls and ceiling? If refinishing is required, please provide requirements in Statement of Work.
Response
No, the contractor is not required to repair any existing damage to the walls or ceilings of Trailer 760. The contractor is only responsible for repairing damage caused as a result of the move.
5
Question
There are existing hedge bushes planted adjacent to parking lot in front of site where Modular Building 760 is to be relocated. These plants will be damaged during clearing and grubbing operations, as well as during the relocating of buildings sections on site, if left in place. Will FLETC remove these plants prior to any work under this Contract? Or will the Contractor be required to remove plants after contract award? Will Contractor be required to restore plant bed and, or replant hedge bushes under this Contract?
Response
FLETC will not remove any shrubbery. The contractor shall cut back the shrubs as needed to clear the site and make way for the trailer relocation. The Contractor is not required to replant.
6
Question
There is also an irrigation system in plant bed that will need to be removed. Will FLETC remove the irrigation system prior to start of site work for this Contract? Or will the Contractor be required to remove and replace the system under the scope of this Contract?
Response
The contractor shall remove above ground irrigation that would be damaged by site clearing, cap water line, and abandon underground pipe in place. The SOW in Attachment 1 has been updated to reflect this.Comment by Bentley, LaSheena T: SOW # 3
7
Question
Statement of Work requires sewer line from Modular Building 760 to tie-in to existing clean-out located behind Building 682. Because this line has to be sloped for gravity flow, approximately 85% of the sewer line routed from relocated Building 760 to clean-out will be above ground. In addition, there will be limited to no access to the area on the backside of sewer line. Please advise whether screening will be required to hide this aboveground sewer line from view. If screening will be required under this Contract, please advise whether screening will be natural shrubs or bushes. Or will screening consist of some type of wall? Please revise Statement of Work for this project.
Response
Attachment 1 has been updated to include a Sanitary Sewer Plan, in which the sewer line is run underground to the existing sanitary sewer clean out. The sewer line is required to be below ground, thus no screening is required.
8
Question
Request deleting requirement for sewer line tie-in to existing cleanout. Suggest using alternate solution for waste water collection. Recommend locating 500 gal (min.) waste water collection tank behind Building 760. Tank would be located inside a spill containment area for compliance with Environmental safety. This system will require weekly or bi-weekly removal of waste from tank. Actual tank size will be based on facility usage (no. of personnel in facility on continuous basis). Please advise on the use of this alternate system.
Response
The SOW will not be revised to allow for the proposed alternative system. Attachment 1 has been updated to include a Sanitary Sewer Plan, in which the sewer line is run underground to the existing sanitary sewer clean out.
9
Question
Please confirm whether communication and data lines/ equipment currently located in Modular Building 760 will be removed by FLETC. Also, will this work be done prior to the start of this Contract?
Response
The IT will be disconnected and equipment removed by FLETC before work starts.
10
Question
Please confirm that all movable furnishings located in Modular Building 760 will be removed by FLETC. Also please confirm that this work will be done prior to the start of this Contract.
Response
Movable furnishings located in Modular Building 760 will be removed by FLETC prior to the start of this Contract.
11
Question
For the skirting on the modular unit, are both metal and vinyl acceptable?
Response
Both metal and vinyl acceptable for the skirting.
12
Question
In the interior of the trailer, there is vinyl flooring that must be separated in order to relocate the trailer. With that separation, it is unlikely that the new flooring to reconnect the unit will be an exact match. Is it acceptable to match the color as closely as possible, or is there a spec for the replacement flooring type?
Response
It is acceptable to match the color as closely as possible.
13
Question
Will FLETC be reusing the existing exit signage?
Response
Yes, FLETC will be reusing the existing exit signage.
14
Question
The scope calls for removing a chemical mixing machine from Building 31 and installing it in Trailer 760. Where will it be installed in the trailer? In addition, are there a photos or a description of the machine that can be provided?
Response
Installation of the mixing machine is no longer required. The contractor will install a water supply line in the restroom and a spill container. The SOW in Attachment 1 has been updated to reflect this change.
15
Question
At the new location, the sewer line for trailer 760 will flow to a sanitary utility hole which is located on a higher elevation than the trailer. Will the contractor be allowed to install a sump pump on the sewer line?
Response
The SOW does not call for the use of a sump-pump. The proposal should not include the cost of a sump-pump. Attachment 1 has been updated to include a Sanitary Sewer Plan, in which the sewer line is run underground to the existing sanitary sewer clean out.

image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image1.jpeg image2.jpeg image3.jpeg image4.jpeg