70LGLY18QGLB00088_Amd_0002.pdf

PDF 93 KB Posted

Attached to
Portable Water Inflated Flood Barriers
Solicitation number
70LGLY18QGLB00088
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
70LGLY18QGLB00088_Amd_0001.pdf PDF
70LGLY18QGLB00088.pdf PDF
70LGLY18QGLB00088.pdf PDF
Drawing_1.pdf PDF
Drawing_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

70LGLY18QGLB00088

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

GLYNCO GA 31524

ATTN:TRACY GREEN

FLETC GL

PRO BLDG 93

1131 CHAPEL CROSSING RD

FEDERAL LAW ENFORCEMENT TRNG CTR

DEPARTMENT OF HOMELAND SECURITY

GLYNCO GA 31524

ATTN: TRACY GREEN

FLETC GL

BLDG: 93 PRO

1131 CHAPEL CROSSING RD

FEDERAL LAW ENFORCEMENT TRNG CTR

DEPARTMENT OF HOMELAND SECURITY

07/20/20180002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/13/2018

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE CONTINUATION SHEET FOR AMENDMENT INFORMATION

The purpose of this amendment is to respond to contractor inquiries and provided a Question

(Q) and Answer (A) format:

1. Q: When connecting WIPP units you overlap one on top of another at a rate of 8ft. I need to know if your measurements take that into consideration. If not, you may need additional footage WIPP needs to be installed at least 4ft away from a building so it doesn’t press into the building when the flood comes, which could cause structural damage – thus the measurements should be taken at that point instead of next to a building.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Tracy Green

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

70LGLY18QGLB00088/0002

A: Regarding the below questions, I have reviewed the drawings and SOW and have determined the measurements and footages are correct, and the placement of the inflatable barriers does reflect overlapping as required, and does provide a minimum of 4’ of clearance away from the buildings.

As indicated in the SOW, the below quantities correspond with the customized lengths depicted on the drawings.

The following customized lengths of Single Unit, Portable, Water-Inflated Flood Barriers shall be purchased.

* 20 each of 100’ sections = 2,000 LF Total

* 12 each of 90’ sections = 1,080 LF Total

* 7 each of 80’ sections = 560 LF Total

* 4 each of 70’ sections = 280 LF Total

* 2 each of 60’ sections = 120 LF Total

* 6 each of 40’ sections = 240 LF Total

* 6 each of 30’ sections = 180 LF Total

* 4 each of 20’ sections = 80 LF Total

A total of 4,540 LF.

2. Q: Since our product is different, may I ask what is the real flood risk? Will the location flood at 3’ or 4’?

Water inflated barriers typically need to be higher than the actual risk to account for the force of the water.

With our system, we may not need to quote 5’ high thanks to our special design. The pressure of the water forces the toe downward which anchors the unit to the ground.

A: All vendors provide quote on the 5’ requirement because the flooding could exceed 3’ or 4’.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it.