70FBR918R00000001_000001_Solicitation_Amendment.pdf

PDF 348 KB Posted

Attached to
Hauling, Install, Maint/Deactivate MHUs Federal contract opportunity
Solicitation number
70FBR918R00000001
Issued by
Federal Emergency Management Agency Headquarters Office of the Chief Procurement Officer

About this file

Amendment 00001 - Question & Answers

View the file

Other files for this federal contract opportunity

Other files attached to Hauling, Install, Maint/Deactivate MHUs, newest first.
File Type Posted
FEMA_DR-4344_CA_County_(Highlighted-Colored)_Map.pdf PDF
Solicitation_70FBR918R00000001_Final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

70FBR918R00000001

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

11/17/2017

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

11/16/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of amendment 000001 is to issue the Government's response to questions received by the deadline outlined the solicitation.

All other terms and conditions remain unchanged.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

000001

To All Offerors/Bidders

Department of Homeland Security Federal Emergency Management Agency Mission Support Bureau Office of the Chief Procurement Officer Acquisiton Operations Division

DHS-FEMA-MSB-OCPO-AOD

Region IX DR-4344-CA 10000 Goathe Road Sacremento, CA 95827

Sherwin Turner

Questions Answers

1 Is the terrain mountainous, hilly, or flat for the majority of the homes?

It depends on the area. For planning purposes consider most of them hilly.

There are winding and steep roads in the rural areas.

2 What type of soil condition exist at the sites?

The soil is typical for northern California, except that the top layer has suffered fire damage. Specific information can be found at:

https://websoilsurvey.nrcs.usda.gov/app/

3 Are rock anchors required for the majority of the sets?

Will be site dependent and per local code

4 Do we tie in to existing plumbing lines or put in septic systems?

Where plumbing lines exist, the contractor is expected to use those. The lack of septic/plumbing at the site will be found during the site inspection.

If it is lacking, the contractor will note, mark the site as “soft infeasible,” and send back to FEMA for determination.

5 Is FEMA accepting quotes from companies outside of the Disaster Area?

Yes. However, Local Area Preference will be given in accordance with the Stafford Act requirements.

6 Do companies in the disaster area get a pricing preference similar to Hubzone pricing on unrestricted solicitations?

A Local Area Preference will be given to Local firms in accordance with the Robert T. Stafford Act.

7 Where are the attachments to the solicitation posted?

Attachment 1 – Statement of Work

Attachment 2 – Past Performance Questionnaire

Attachment(s) 3 – Wage Determinations

Attachment 4 – Proposal Submission Requirements

/ Evaluation Criteria

Attachment 5 – Pricing Template

All of the attachments were posted at www.FBO.gov As stated in the posting, the attachments are posted within the PDF Solicitation.

8 What does "local preference" mean? Does that mean maybe a percentage allowance on price? (Since this is LPTA)

See clause attachments or FAR 26.202-2. More than likely it will include a price preference for firms within the Local Declared Counties of DR-4344.

9 Is local preference a REQUIREMENT for award? See above items 7 & 8.

http://www.fbo.gov/

10 In regards to "local preference", does it count if one of our subcontractors has been doing business for years in one of the designated counties? Or does the

OFFEROR have to show local presence.

Any subsequent Awardee would need to have a Local Presence in accordance with FAR 52.226-3b, c, d. Review the Solicitation attachments.

11 If a subcontractors local presence counts, does that sub have to be registered in SAM?

See above item 10. Also review the attachment FAR 52.226-5.

12 In regards to "local preference", AND it is the

OFFEROR who has to show it, does it count if we have only for the purposes of this contract located our office in one of the counties, or did that office have to be in existence prior to the solicitation of this proposal?

Refer to FAR 52-226-3c – in the attachment.

13 Attachment 2 – Past Performance Questionnaire due by 11:00am PST today, we may have an issue with that since we don't have the PPQ Attachment

The PPQ is attached within the Solicitation. See above item 7.

14 Due Date Friday Nov 17 5:00pm PST is VERY SHORT

NOTICE on turnaround.

We understand that time is of the essence here but would respectfully ask that the deadline for both be extended until MONDAY Nov 20 9:00am PST so that we could have the weekend to gather up all the requested information and submit a quality proposal.

The FEMA Program Requirements Office has not authorized an extension.

15 Can FEMA provide a breakdown for the 150 units to be installed?

a. Private Site

b. Parks

For now, we anticipate 50/50, but will have a preference for commercial sites as they come available.

16 Does FEMA plan on making multiple awards?

Please read the Solicitation. This will be a Single Award!

17 Can FEMA provide a breakdown as to how many units are expected to be installed in each area listed? This will have impact on figuring transportation cost & crews required to perform.

We don’t have specific data available. We anticipate most of the units to be installed in Yuba, Medicino, and Lake counties. We do not expect any for Sonoma or Napa.

a. A

b. B

c. C

d. D

e. H

f. J

g. K

h. AA

18 Can FEMA provide how many units are located at each of the staging yards listed?

a. McClellan

b. Vallejo

McClellan has the majority (over 90), the rest are at Vallejo (approx.. 15)

19 Has FEMA performed the SIR’s? Will those completed SIR’s be issued with the install work orders?

FEMA has completed a handful. They will be provided to the vendor along with the install WOs.

20 It is our understanding the State was going to issue an executive order concerning the installs for temporary MHU’s in an effort to standardize the process.

a. Has that been issued?

b. If so, can that process be provided?

The vendor is expected to obtain, be familiar with, and obtain these standards and abide by them.

21 If there is no standard process,

a. Will insulted skirting be required on each unit?

b. Will pads be required to ensure proper drainage on each unit?

Yes. Please read the SOW.

22 1) Can the time to submit PPQ’s be extended to match the time the proposal is due?

The time to submit PPQ’s is extended to match the time the Proposals are due.

23 Was it your intent to include all of the counties set forth in DR-4344? I see that Orange County is included although not in the original Sources Sought notice.

No, Orange County is not included. Just the seven counties identified in the

SOW.

24 Also, is this an all or none bid? It would appear that you are only going to award to one LPTA contractor who can provide coverage to all areas.

All. Single Award. See above item #16.

25 Do you anticipate hauling any MHU's to Orange County? If so will there be a CLIN for additional mileage?

No

26 Will the skirting be insulated or non- insulated?

Insulated. This is spelled out in the SOW.

27 Will there be a staging yard in Orange county?

No