Concrete_Pad_and_Walk_Way_Extension_Statement_of_Objectives.pdf

PDF 775 KB Posted

Attached to
Concrete Pad and Walk Way Extension
Solicitation number
70FBR619R00000017
Issued by

About this file

SOO

View the file

Other files

File Type Posted
70FBR619R00000017_P0001.pdf PDF
End_of__current_walk_path.jpeg JPEG file
70FBR619R00000017.pdf PDF
Gravel_pad_photo.jpeg JPEG file
Wage_Determination_TX20190243.pdf PDF
Gravel_pad_and_walk_way_photo.jpeg JPEG file
Walk_path_and_pad_photo.jpg JPG image
Hand_drawing_Concrete_Pad_and_walkway_Extension.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Objectives

Concrete Pad and Walk Way Extension

PURPOSE

The purpose of the concrete extension project is to provide a stable and safe walking path for pedestrians who must walk between the Federal Regional Center (FRC) building and the Russell Newman Building (RNB).

SCOPE

The scope of work for this order includes surveying the site to ensure it is safe for construction, destruction of existing concrete areas (if applicable) to level the surface, removal and disposition of gravel and of all debris waste, and construction of walkway to extend from where the newer walkway ends to the road and removing all the gravel in that bottom area and pouring concrete.

Any alterations/modifications to existing structures and real property to accommodate the construction crew and equipment must be made whole again.

BACKGROUND

The Federal Regional Center (FRC) is the Headquarters office building for Region 6. This is a complex that houses multiple buildings, offices and parking areas. To the south side of the complex, there is a connecting pathway between the FRC building and the Russell Newman Building, which houses mainly Recovery, Grants and Mitigation personnel.

PROJECT DESCRIPTION and OVERARCHING OBJECTIVES The project will have several functional components Site Survey The purpose of the site survey is to measure and survey the site to determine if there are water, gas or electric pipes in or around the area.

Design Review The purpose of the review is to validate constructability of the conceptual design and ensure it will meet FEMA’s needs, will comply with local, state and ADA building and paving regulations. If permits are necessary, the contractor shall be responsible for obtaining the permits and scheduling inspection visits.

Site Preparation/Demolition/Digging/Gravel Removal In this phase, the contractor should extend the walkway alongside the asphalt Trailer pad until it reaches the gravel area, the gravel area between the end of the asphalt trailer pad and the concrete driveway walkway must be demolished/removed and all debris disposed of, in accordance with local and state laws and regulations. The Contractor shall prepare the area, including completing any digging up of dirt, gravel, and/or other material necessary to ensure the soon-to-be-built extended path is continuous and leveled against the existing path.

Solicitation: 70FBR619R00000017

If applicable, the gravel covering the area between the end of trailer parking and the road should be removed and the site prepared for concrete.

Paving Extension Portion of Walk Path In this phase, the extension to the pedestrian walkway will be built - e.g. concrete flatwork, compacting and finish (broom finish), to allow proper drainage to storm drains. Additional site preparation(s)/modification(s) may be necessary along the adjacent soils to ensure appropriate drainage, stability of soils and retainage of new work. All construction must comply with local, state and ADA building and paving regulations. Approximate area = 828 square feet.

Paving from Trailer Parking to Road If applicable, in this phase the area that extends from the trailer parking to the road will be built -e.g. concrete flatwork, compacting and finish (broom finish), to allow proper drainage to storm drains. Additional site preparation(s)/modification(s) may be necessary along the adjacent soils to ensure appropriate drainage, stability of soils and retainage of new work. All construction must comply with local, state and ADA building and paving regulations. Approximate area = 1750 square feet.

Construction Waste Disposal All demolition/waste materials because of these projects are the sole responsibility/ownership of the selected contractor and must be removed from the job site upon completion. Final site conditions shall be left in as good or better condition as when work commenced. The preferred method is to divert from landfill and recycle/reuse. Least preferred option is to dispose of in a landfill. If disposition in landfill, the Contractor is required to report how much debris (lbs.) and where it was disposed of, for environmental reporting.

Inspection The selected contractor is responsible for obtaining all necessary permits and inspections required by local, state or federal offices. Upon project completion, the FEMA COR is responsible to certify completion of project.

CONSTRAINTS

Time constraints and unforeseen weather delays. Most likely, we will obtain funding for this project towards the end of the Fiscal Year and it will be necessary to complete the project quick.

As this may coincide with hurricane season and any activation of our Regional Response Coordination Center will increase, foot traffic may complicate the project.

Budget constraints. We are restricted by the amount of funds available and not necessarily the amount of funds required.

DELIVERABLE SCHEDULE

The government expects that a following deliverable schedule (or better) will be followed in delivering this SOO. The cumulative days mentioned below are business days, not calendar days. Any suggested revision to the below schedule must be submitted in writing and approved by FEMA prior to award of contract.

Task Deliverables Expected Completion Site Survey Report of site conditions and preparation of Construction Documents and Specifications

10 days from date of award

Design review City/County permits, if necessary COR signs to approve design

10 days from site survey (contingent on City/County comment and/or response period)

Site preparation/ demolition/ digging

C&D material/debris sent to landfill C&D material/debris recycled/diverted from landfill

10 days from construction design approval

Paving extension of walkway approximately 828 SF

Inspection report – pass 15 days from demolition

If approved, paving of area adjacent between trailer parking and road, approximately 1750 SF

Inspection report – pass 15 days from demolition

Construction waste removal C&D material/debris sent to landfill C&D material/debris recycled/diverted from landfill

5 days from paving completion

FEMA Final inspection Inspection report – pass 5 days from completion

PERIOD OF PERORMANCE

The period of performance for this task order will be 70 days from date of award for one (1) base period. There are no options periods associated with this task order. Contractor is not responsible for delays due to natural or man-made hazards.

PLACE OF PERORMANCE

The place of performance for this order is:

FEMA Region 6 800 N. Loop 288 Denton, TX 76209

GOVERNMENT FURNISHED EUIPMENT (GFE)/GOVERNMENT FURNISHED

INFORMATION

There is no GFE associated with this task order.

The Government will allow Contractor staff to park on site at the facility during the period of performance for the order.

CONTRACTOR STAFFING PLAN AND KEY PERSONNEL

The Contractor shall provide a list of contractors authorized to perform work no later than five

(5) business days prior to commencing work.

Personnel must be able to pass the security adjudication and cleared to enter the facility. There are no exceptions.

Delays due to personnel not able to pass a favorable background are the responsibility of the contractor.

Concrete Pad and Walk Way Extension
Concrete Pad and Walk Way Extension
PURPOSE
PURPOSE
SCOPE
SCOPE
BACKGROUND
BACKGROUND
PROJECT DESCRIPTION and OVERARCHING OBJECTIVES
PROJECT DESCRIPTION and OVERARCHING OBJECTIVES
Site Survey
Site Survey
Design Review
Design Review
Site Preparation/Demolition/Digging/Gravel Removal
Site Preparation/Demolition/Digging/Gravel Removal
Paving Extension Portion of Walk Path
Paving Extension Portion of Walk Path
Paving from Trailer Parking to Road
Paving from Trailer Parking to Road
Construction Waste Disposal
Construction Waste Disposal
Inspection
Inspection
CONSTRAINTS
CONSTRAINTS
DELIVERABLE SCHEDULE
DELIVERABLE SCHEDULE
PERIOD OF PERORMANCE
PERIOD OF PERORMANCE
PLACE OF PERORMANCE
PLACE OF PERORMANCE
GOVERNMENT FURNISHED EUIPMENT (GFE)/GOVERNMENT FURNISHED INFORMATION
GOVERNMENT FURNISHED EUIPMENT (GFE)/GOVERNMENT FURNISHED INFORMATION
CONTRACTOR STAFFING PLAN AND KEY PERSONNEL
CONTRACTOR STAFFING PLAN AND KEY PERSONNEL
CONTRACTOR STAFFING PLAN AND KEY PERSONNEL