Driveway_Resurface_Construction_SOO_final.pdf

PDF 51 KB Posted

Attached to
Driveway Resurface Project
Solicitation number
70FBR618R00000003
Issued by

About this file

Statement Of Objectives

View the file

Other files

File Type Posted
70FBR618R00000003.pdf PDF
Driveway_Resurface_Construction_Map.pptx PPTX presentation
Wage_Determination_TX293.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Objectives Driveway Resurface Construction

PURPOSE

The purpose for the driveway resurface construction project is to provide an even concrete driveway at the building entrance, exit, circle drive under the front awning and the security gate. The existing gate tracks will need to be removed and reinstalled with new gate tracks equivalent to or better than the existing gate tracks. The gate tracks must be suitable to maintain operability of the existing security gates.

The security gate track shall not lose its integrity and intended purpose.

MISSION

The Statement of Objectives for this order includes surveying the site to ensure it is safe for construction, removing and installing new security gate track system, disposition of all debris waste, and construction of new driveway using concrete and curbs as needed based on TXDOT standards for the driveway resurface project. The predefined area is measured at 7500 sf. The contractor is responsible for forming, chairing, and dowel using appropriate rebar size, on appropriate centers, pour of concrete thick enough and use appropriate PSI to avoid degrading of the surface, broom finish, and stripe all new curbs in the designated construction area. Any alterations/modifications to existing structures and real property to accommodate the construction crew and equipment must be made whole again.

PERIOD OF PERORMANCE

The period of performance for this task order will be 90-120 days from date of award for one (1) base period. There are no options periods associated with this task order. Contractor is not responsible for delays due to natural or man-made hazards.

PLACE OF PERFORMANCE

The place of performance is: FEMA Region 6, 800 N. Loop 288, Denton, Texas 76209

BACKGROUND

The Federal Regional Center (FRC) is the Headquarters office building for Region 6. This is a complex that houses multiple buildings, offices and parking areas. The current entrance circle driveway was asphalted five (5) years ago and it is showing signs of wear and tear. Throughout the years, we have performed some repairs around the area which required breaking through the concrete and resurfacing. The constant patching over the asphalt created an uneven surface which is affecting both vehicle and on-foot traffic. The entrance and exit gates will need new tracks installed once the concrete work is completed.

PROJECT OBJECTIVES

The project will have several three phases to include demolish and repair of entry side, demolish and repair of exit side, demolish and repair of awning/drive areas. The government will need a design plan with the driveway resurface project.

Site Survey The purpose of the site survey is to measure and survey the site to determine if there are water, gas, communication lines, or electric pipes in or around the area.

Design Review The purpose of the review is to validate constructability of the conceptual design and ensure it will meet FEMA’s needs, will comply with local, state and ADA building and paving regulations.

Demolition-Paving Entry/Exit Driveway New Concrete In this phase, the entry and exit driveways will be built – e.g. concrete pouring, compacting and finish. Sub-base, base and roadbed cross-section to be appropriately designed in accordance local, state and/or Federal regulations/guidelines, International Building Code (IBC), to withstand the load of 3 or more axle vehicles (i.e. delivery and utility vehicles, Emergency Vehicles, heavy loaded equipment, etc.). The driveway shall include curb painting along with pedestrian crossing areas on the Northwest/Southwest sections of the driveway.

Security Gate Tracks

The scope of this phase requires the contractor to provide all labor and materials to repair/replace the security track system to properly function at the west main entry/exit driveway once the driveway concrete project is complete. The new tracks must be interoperable and compatible with the current electronic access system and should be of same or better quality as that of the existing system.

Construction Waste Disposal All demolition/waste materials as a result of these projects are the sole responsibility/ownership of the selected contractor and must be removed from the job site upon completion. Final site conditions shall be left in as good or better condition as when work commences. All construction waste material/debris will be disposed of. The preferred method is to divert from landfill and recycle/reuse. Least preferred option is to dispose of in a landfill.

Inspection The selected contractor is responsible for obtaining any and all necessary permits and inspections required by local, state or federal offices. Upon project completion, the FEMA COR is responsible to approve completion of project.

CONSTRAINTS

Time constraints and unforeseen weather delays. As this may coincide with hurricane season and any activation of our Regional Response Coordination Center will increase, foot traffic may complicate the project. There are budget constraints. We are restricted by the amount of funds available and not necessarily the amount of funds required.

SAFETY

This section is applicable to all work covered by this contract.

QUALITY ASSURANCE

1. Safety Meeting: Representatives of the Contractor shall meet with the Contracting Officer and representative(s) prior to the start of work under this contract for the purpose of reviewing the Contractor's safety and health programs and discussing implementation of all safety and health provisions pertinent to the work to be performed under the contract. The Contractor shall be prepared to discuss in detail the measures he/she intends to take in order to control any unsafe or unhealthy conditions associated with the work to be performed under the contract. If directed by the Contracting Officer, this meeting may be held in conjunction with other meetings which are scheduled to take place prior to start work under this contract. The level of detail for the safety meeting is dependent upon the nature of the work. The Contractor's principal on-site representative(s), the general superintendent and his/her safety representative(s) shall attend this meeting.

2. Contractor Responsibility: The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his/her part or that of his/her employees or subcontractors, which results in illness, injury, or death.

SAFETY SUBMITTALS

1. Accident Reporting: A copy of each accident report, which the Contractor or subcontractors submit to their insurance carriers, shall be forwarded through the Construction Engineer to the Contracting Officer Representative as soon as possible, but in no event later than seven (7) calendar days after the day the accident occurred.

2. Site Safety Plan: Contractor to provide and submitted based on the delivery schedule.

3. Certifications: The Contractor shall provide any and all certifications or licenses of each employee related to job being performed.

4. Other Submittals: If agreed to in writing at the safety meeting, other submittals shall be required. One such submittal which may be included is a plan of action for handling hazardous materials, which shall contain the following:

A. Number, type, and experience of employees to be used for the work.

B. Description of how applicable safety and health regulations and standards are to be met.

C. Type of protective equipment and work procedures to be used.

D. Emergency procedures for accidental spills or exposures.

E. Interfacing and control of subcontractors, if any.

F. Identifications of any required analyses, test demonstrations, and validation requirements.

G. Method of certification for compliance.

STOP WORK ORDERS

1. When the Contractor or his/her subcontractors are notified by the Contracting Officer's representative(s) of any non-compliance with the provisions of the contract and the action(s) to be taken, the Contractor shall immediately, if so directed, or within 48 hours after receipt of a notice of violation correct the unsafe or unhealthy condition. If the Contractor fails to comply promptly, all or any part of the work being performed may be stopped by the Contracting Officer or his/her representative(s) with a "Stop Work Order".

When, in the opinion of the Contracting Officer or his/her representative(s), satisfactory corrective action has been taken to correct the unsafe and unhealthy condition, a start order will be given immediately. The Contractor shall not be allowed any extension of time or compensation for damages by reason of or in connection with such work stoppage.

PROTECTION

1. The Contractor shall take all necessary precautions to prevent injury to the public, building occupants, or damage to property of others. For the purpose of this contract, the public or building occupants shall include all persons not employed by the Contractor or a subcontractor working under his/her direction.

2. Storing, positioning or use of equipment, tools, materials, scraps, and trash in a manner likely to present a hazard to the public or building occupants by its accidental shifting, ignition, or other hazardous qualities is prohibited.

3. Work shall not be performed in any area occupied by the public or Federal employees unless specifically permitted by the contract or the COR and unless adequate steps are taken for the protection of the public or Federal employees.

4. Wherever practicable, the work area shall be fenced, barricaded, or otherwise blocked off from the public or building occupants to prevent unauthorized entry into the work area.

5. Alternate Precautions: When the nature of the work prevents isolation of the work area and the public or building occupants may be in or pass through, under or over the work area, alternate precautions such as the posting of signs, the use of signal persons, the erection of barricades or similar protection around particularly hazardous operations shall be used as appropriate.

6. Public Thoroughfare: When work is to be performed over a public thoroughfare such as a sidewalk, lobby, or corridor, the thoroughfare shall be closed, if possible, or other precautions taken such as the installation of screens or barricades. When the exposure to heaving falling objects exists, as during the erection of building walls or during demolition, special protection of the type detailed in 29 CFR 1910/1926 shall be provided.

7. Fences and barricades shall be removed upon completion of the project, in accordance with local ordinance and to the satisfaction of the Contracting Officer or his/her representative(s).

SECURITY GENERAL REQUIREMENTS

This section includes all items related to security clearances, security badge passes, security guards and escorts.

SECURITY SUBMITTALS

1. Clearance: Provide Contracting Officer information of all staffers that will need to access to the site to include First/Last name, Birthdate, and last four of SSN detailed below for each individual accessing federal facilities.

2. Schedules: Normal Working Hours or Other Than Normal Working

Hours shall be determined by the Ordering Official Contracting Officer on each delivery order. The Contractor shall furnish a work schedule to the GSA, PBS District Manager or his/her designee, if requested.

SECURITY REQUIREMENTS AND REGULATIONS

1. Clearance checks will be performed by the Government.

2. Permission to enter the site is revocable at any time during the project by the Regional Security Officer.

3. Contractors are not to direct sales representatives, individuals seeking employment or others to the project site.

4. Temporary Security Badges serve to authorize the individual issued the badge access to the federal property with an escort.

5. Temporary Security Badges shall be clearly visible at all times when on the work site.

6. Do not enter the building without security badges.

7. Should clearance be revoked for any reason, the security badge shall be returned to the Regional Security Officer immediately.

8. Temporary badges will not be issued by the Regional Office

Contracting Officer.

Statement of Objectives
Driveway Resurface Construction
MISSION
PERIOD OF PERORMANCE
PLACE OF PERFORMANCE
BACKGROUND
PROJECT OBJECTIVES
Site Survey
Design Review
Demolition-Paving Entry/Exit Driveway New Concrete
Construction Waste Disposal
Inspection
CONSTRAINTS