FEDERAL EMERGENCY MANAGEMENT AGENCY
Statement of Work
11/18/2019
Interior Painting at Branch IV Office in Ponce, PR
The Federal Emergency Management Agency (FEMA) is in need to paint the walls at the Branch IV office in Ponce. The Branch IV address is 2040 Ave. Rafael Cordero Santiago Ponce, PR 00716. Only the interior walls of the building shall be painted. Exterior walls are not part of the scope.
The following requirements need to be fulfilled for the painting job to be accomplished successfully, within the Agency’s standards:
• The Branch IV office interior walls are to be painted to their full height and length (not including beyond the false ceiling or office ceiling).
o All four (4) big walls that surround the entire office area must be painted. These walls are approximately fourteen (14) feet high each. The total length of all four walls is approximately six hundred and twenty (620) feet together.
• The Branch IV storage area interior walls are to be painted to their full height and length.
o All six (6) walls that surround the entire storage/warehouse area must be painted. All six
(6) walls have an approximate height of twenty-two (22) feet each. The total length of all six (6) walls is approximately three hundred and three (303) feet together.
• A first hand of Primer Sealer by Sherwin Williams PVA B 28 W08000 for all interior walls.
• A second hand (single application) of Pro Mar 400 Flat of SW shall be applied after the primer for all interior walls.
• Before any type of paint is done, contractor must scrape the paint off all walls.
• All painting and/or scrape jobs shall be performed on, and only on, on a single weekend (Friday, Saturday and Sunday). Contractor shall start on Friday after 4pm and finish no later than Sunday at midnight. By no means, contractor shall perform the job outside of the established schedule.
• FEMA Security and/or FEMA Log shall be on hand to oversee the work.
• All contractors shall be identified as contractor employees.
70FBR220R00000003 Attachment 01