Rasied flooring RFI (003).docx

DOCX document 16 KB Posted

Attached to
RFI-RAISED FLOORING-MARKET RESEARCH
Solicitation number
70FBR027I00000001
Issued by

About this file

This is a Request for Information (RFI) issued by the Federal Emergency Management Agency (FEMA), Region 10, located in Bothell, Washington, for market research and preliminary pricing related to design services for a proposed 3-inch raised flooring system in the Regional Response Coordination Center (RRCC) at the Federal Regional Center (130 228th St SW, Bothell, WA 98021). The applicable NAICS code is 236220 - Commercial and Institutional Building Construction. This RFI is for informational and market research purposes only and does not constitute a binding commitment, guarantee of future contract issuance, or authorization to begin work.

Respondents must provide estimated labor categories with hourly rates and total hours required for the assessment and design effort, total cost for design and CAD drawing services, assumptions and exclusions, recommended design deliverables with anticipated government review cycles, and an estimated schedule for completion. The design effort must include an onsite assessment of existing floor conditions and electrical/data requirements; review of proposed space layout; development of preliminary raised-flooring design concepts supporting electrical and data-cable routing and furniture placement; CAD drawings showing raised-floor footprint, access points, power and data distribution, and furniture coordination; identification of anticipated components and ancillary items; coordination considerations with existing building conditions and infrastructure; consideration of life-safety, accessibility, egress, and operational requirements; and a preliminary planning-level budget estimate for the raised flooring system, components, delivery, installation, and coordination. Interested offerors must maintain active registration in the System for Award Management (SAM) and are solely responsible for all expenses associated with responding. The government will not provide reimbursement for information submitted and respondents will not be notified of review results.

View the file

Other files

File Type Posted
RRCC Elevated Floor Project 11132026 (003).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hello [Vendor/Project Manager Name], FEMA Region 10, located in Bothell, Washington, is seeking information and a preliminary estimate for design services related to a proposed 3-inch raised flooring system in the Regional Response Coordination Center (RRCC) at the Federal Regional Center.

The proposed raised flooring system is intended to improve electrical and data-cable distribution, support a more flexible furniture layout, and accommodate increased seating within the RRCC. The design effort will support a broader redesign and optimization of the space.

Please review the attached R10 RRCC Areas for Redesign and Optimization floor plan and provide an estimated level of effort, schedule, and cost to assess the space and develop design and CAD drawing deliverables for a 3-inch raised flooring system.

At a minimum, the estimate should include:

· An onsite assessment of the proposed RRCC raised-floor area, including existing floor conditions, access constraints, existing furniture configuration, and visible electrical and data requirements. Please let us know if an onsite assessment is not possible.

· Review of the proposed space layout and identification of areas appropriate for a 3-inch raised flooring system.

· Development of preliminary raised-flooring design concepts that support electrical and data-cable routing, furniture placement, circulation, and increased seating requirements.

· CAD drawings showing the proposed raised-floor footprint, access points, floor transitions, power and data distribution assumptions, and coordination with the proposed furniture layout.

· Identification of anticipated components and ancillary items, such as raised-floor panels, pedestals, ramps or transitions, access panels, cable-management components, and finish materials.

· Coordination considerations for the existing building conditions, furniture systems, electrical and communications infrastructure, and any required interfaces with other trades.

· Consideration of applicable life-safety, accessibility, egress, circulation, and operational requirements.

· A final recommended raised-flooring layout and supporting design/specification information.

· A preliminary planning-level budget estimate for the raised flooring system, related components, delivery, installation, and associated coordination requirements. The budget should identify quantities, key assumptions, and exclusions.

Please include the following in your response:

1. Estimated labor categories, hourly rates, and total labor hours required for the assessment, design, and CAD drawing effort.

2. Estimated total cost for the design and CAD drawing services.

3. Assumptions, exclusions, information needed from FEMA Region 10, and site-access requirements needed to develop the estimate.

4. Recommended design deliverables and the anticipated number of Government review/revision cycles.

5. Estimated schedule and timeline for completing the assessment, preliminary concepts, CAD drawings, and planning-level budget estimate.

This request is for planning and budget-estimation purposes only. It does not constitute a request for quotation, an order, or authorization to begin work.

File details come from the government source that posted it. Updated .