PWS RX FRC Urinal Drainage Pipe.pdf
PDF 102 KB Posted
- Solicitation number
- 70FBR026Q00000008
- Issued by
-
Federal Emergency Management Agency
About this file
This Performance Work Statement (PWS) details a plumbing repair project for the Federal Emergency Management Agency (FEMA) Region 10 Federal Regional Center in Bothell, Washington. The project requires replacing copper waste lines in the upper restroom with ABS or equivalent code-compliant piping due to multiple identified leaks causing water intrusion into the pipe chase. The contractor must provide all labor, parts, and materials to replace drain lines overhead flowing into the main lower sewage lines, ensure full operational functionality, and comply with security and safety requirements.
Key project specifications include working hours from 6:00 AM to 6:00 PM Monday through Friday, excluding federal holidays, and strict site security measures such as 100% identification checks and potential random searches of toolboxes and equipment. Contractors must provide their own tools and personal protective equipment, coordinate work with the FEMA Region 10 Facility Manager, submit worker names for security vetting in advance, and provide at least 1-day notice before arriving on-site. The project is scheduled for completion by December 8th, 2025, with the specific period of performance to be stated in the contract.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL EMERGENCY MANAGEMENT AGENCY
R10 FRC SEWAGE LINE REPAIRS
REGION 10
PERFORMANCE WORK STATEMENT
December 8th, 2025
A. PROJECT TITLE
Federal Emergency Management Agency (FEMA) Region 10 Federal Regional Center (FRC) Urinal Draining Pipe Repair.
B. BACKGROUND
FEMA requires the replacement of the upper restroom waste lines, which are currently constructed of copper. Multiple leaks have been identified throughout these lines, resulting in water intrusion into the pipe chase. To address this issue and ensure compliance with current plumbing codes, all copper waste lines in the affected area must be replaced with ABS or equivalent code-compliant piping.
C. OBJECTIVE
The Contractor shall provide FEMA - Region 10 with all labor, parts and materials to perform work related repair by replacement of the waste drainage for the upper floor restrooms. Before coming on-site, contact will ensure to pass along the names of the workers to be on site performing work to ensure they are vetted by security.
D. REQUIREMENTS
Contractor to provide plumbing services to include:
1. Replace all copper drain lines abs or other new and approved pipes overhead flowing into the main lower sewage lines.
2. The contractor shall identify and describe any subcontractor support required to complete the scope of work, and the contractors ability to subcontract.
3. Ensure all plumbing touched and effected by this repair is fully operational.
E. DELIVERABLE AND DELIVERY SCHEDULE
All work completed will be reviewed and accepted by the government upon completion. You must call and give a minimum 1-day notice before coming on-site or you will not be allowed to enter the facility.
F. GOVERNMENT-FURNISHED EQUIPMENT AND INFORMATION
Any work or action indicated to be accomplished by the contractor, including the furnishing of materials therefore unless otherwise specified, shall be at the contractor’s expense. All plumbing fixtures will be complete, usable, and to current plumbing codes when repairs are completed.
G. PLACE OF PERFORMANCE
The Contractor shall perform work at the following FEMA Region 10 location:
FEMA Federal Regional Center (FRC) Region 10 130 228th ST SW Bothell, WA 98021
H. PERIOD OF PERFORMANCE
The period of performance to be as stated on contract.
I. SITE SECURITY REQUIREMENTS
Security requirement of this facility grounds include but are not limited to a 100% identification check. All toolboxes, machinery, etc. are subject to random search, and shall not be left unattended in public areas, except by prior approval of the FEMA Region 10 Facility Manager or designee. Such containers and toolboxes shall be locked and secured when unattended and shall be clearly labeled to indicate general contents and a point of contact in case of emergency. The Contractor shall make available and keep a current roster of employees working at the FEMA Region 10 site.
Project points of contact are listed below:
FEMA Region 10 Facility Operations Specialist: Richard Dunaway (202) 657-1786
Richard.Dunawayii@fema.dhs.gov
FEMA Region 10 Administrative Contracting Officer: Rick Albidress (425) 487-2287 Richard.Albidress@fema.dhs.gov
J. SAFETY REQUIREMENTS
In order to provide safety controls for protection of the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this contract, the Contractor shall comply with all applicable Federal laws and regulations with such additional measures as the government may deem necessary.
All tools and personal protective equipment required to be provided by the contractor. The contractor shall ensure all tools, equipment, and machinery are in good working order.
M. PROJECT WORK HOURS AND SITE ACCESS
Working hours of the building occupants designated to assist with this project are from 6:00AM to 6:00PM – Monday through Friday, excluding Federal holidays.
Work performed under this contract shall be performed during these hours designated above, unless otherwise approved in advanced by the FEMA Region 10 Facility Manager or designee.
The Contractor shall coordinate the contracted and/or related work items with the FEMA Region 10 Facility Manager or designee. The Contractor shall make request for exception to the work hours indicated above to the FEMA Region 10 Facility Manager or designee, at least 48 hours prior to the proposed deviation from the above work hours.
mailto:Richard.Dunawayii@fema.dhs.gov mailto:Richard.Albidress@fema.dhs.gov
| B. BACKGROUND |
| C. OBJECTIVE |
| D. REQUIREMENTS |
| E. DELIVERABLE AND DELIVERY SCHEDULE |
| F. GOVERNMENT-FURNISHED EQUIPMENT AND INFORMATION |
| G. PLACE OF PERFORMANCE |
| H. PERIOD OF PERFORMANCE |
| I. SITE SECURITY REQUIREMENTS |
| J. SAFETY REQUIREMENTS |
| M. PROJECT WORK HOURS AND SITE ACCESS |