TPS_Requirements_.pdf

PDF 2 MB Posted

Attached to
Tank and Pump Systems (TPS) Federal contract opportunity
Solicitation number
70FB8018R00000003
Issued by
Federal Emergency Management Agency Headquarters Office of the Chief Procurement Officer

About this file

This file contains the requirements information for Tank and Pump Systems (TPS).

View the file

Other files for this federal contract opportunity

Other files attached to Tank and Pump Systems (TPS), newest first.
File Type Posted
Gen_2_TPS_Requirements_v_B-F_3-08-18.pdf PDF
TPS_IDIQ_Price_Cost_CLIN_Schedule_--_03-08-18.xlsx XLSX spreadsheet
Maintenance_Repair_&_Refurb_Requirements_rev_BF.PDF PDF
Amendment-00002.pdf PDF
TPS_Solicitation_-_.pdf PDF
Amendment-0001.pdf PDF
PastPerfornanceQuestionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSFE80-17-R-0001 Tank & Pump System Requirements

PART 1. OVERVIEW

1.1. A key part of the Federal Emergency Management Agency’s (FEMA) mission is to assist disaster survivors to recover from the event and move toward returning to their pre-disaster status as quickly as possible. As part of the recovery effort, FEMA assists survivors in moving from shelters to temporary housing as quickly as possible. FEMA’s mission covers the entire United States and territories.

1.2. One of the options that FEMA uses within the contiguous U.S. for temporary housing is manufactured homes. Manufactured homes are built to comply with 24 CFR 3280, the

Manufactured Home Construction and Safety Standard (the Standard). The Standard is silent on the inclusion of residential fire sprinklers.

1.3. FEMA has determined that the agency will equip manufactured housing units (MHUs) used as temporary housing with residential fire sprinkler systems. The sprinkler systems are in compliance with National Fire Protection Association (NFPA) Standard for the

Installation of Sprinkler Systems in One- and Two-Family Dwellings and Manufactured

Homes - NFPA 13D.

1.4. FEMA has determined that an external Tank and Pump System (TPS) will be provided with the MHU to ensure a consistent and adequate water supply. The TPS will provide adequate water flow, pressure and quantity to meet the operational requirements set forth by FEMA and in NFPA 13D.

1.5. FEMA has developed requirements for the TPS that will allow the MHU manufacturers to plan the 13D sprinkler system. The TPS requirements will have water pressure and flow requirements, an environmental envelop, water capacity minimums, maximum electrical power available, transportation requirements, and specific connections for electricity and water.

1.6. All FEMA MHUs are less than 2,000 square feet.

1.7. FEMA can use this contract to meet requirements of the manufactured home mission or any other legal mission assigned to FEMA including missions using the Economy Act.

PART 2. REQUIREMENTS

2.1. Overall Requirements

2.1.1. The TPS shall meet the following requirements:

2.1.1.1. The TPS shall provide a pressure of no less than 40 psig and 30 GPM. Pressure and flow shall be measured at the end of the flexible water connection tether designated to be attached to the MHU.

2.1.1.2. The TPS shall require only two connections to the MHU 1) the electrical connection which will provide power to the TPS from the MHU; and, 2) a water connection that will provide the water required to the NFPA 13D fire sprinkler system in the MHU.

2.1.1.3. The TPS package shall be a fully integrated subsystem that when mated to an

NFPA 13D fire sprinkler equipped manufactured home, the MHU and the TPS shall be fully NFPA 13D compliant without the need to connect the MHU sprinkler system to either the public water system or well water.

2.1.1.4. TPS shall be fully assembled when delivered to FEMA.

2.1.1.5. Installation shall be able to be completed in the field (at the site where the manufactured home is installed) using standard hand tools. If any special tools or equipment is required for installation, it shall be included as part of the TPS.

2.1.1.6. The TPS shall come equipped with a thermally protected (meeting the requirements set forth below) flexible water connection that shall be used to attach the TPS to the manufactured home.

2.1.1.7. The TPS shall be designed to operate from a single phase, 30 amps, 240 Volt 60

Hz electrical service utilizing IEC 60-309-2 pin and sleeve connections.

2.1.1.8. The TPS shall have a low temperature alarm that activates if there is a failure of the thermal protection system. The alarm shall be audible and visual.

2.1.1.9. The TPS shall be protected against tampering, and shall be accessible for testing and service.

2.1.1.10. The TPS shall have a pump test loop that activates the fire alarm(s) and allows water to return to the storage tank.

2.1.1.11. The TPS system shall be designed to be installed on the ground.

2.1.1.12. The TPS shall include features allowing the TPS to be secured to the ground.

2.1.1.13. The TPS shall have standard orientation to allow for communication of location and position of some components. See Diagram 1.

2.1.1.14. The maximum width of the TPS for the front/rear dimension shall not exceed 4 feet. See Diagram 2.

2.1.1.15. The contractor shall balance storage and transportation needs against inspection, maintenance and ongoing testing needs. The balance shall ensure that key components such as the pump can be removed if service or replacement is required.

2.1.1.16. All IEC 603-09-2 Pin and Sleeve connectors shall use pin pattern standard for 4 wire, 30 AMP, Single Phase, 12 hour ground position (per IEC 60 309-2 “Clock), power. Similar to 430B12W.

2.1.1.17. The connection between the TPS and the water connection hose shall be a stainless steel cam lock connection meeting the ANSI A-A-59326 series for specifications. All cam lock connectors shall have an appropriate cam lock cover to ensure that the connection and piping or hose remains clear of dust/dirt or other foreign objects.

2.2. Applicable Standards

2.2.1. 24 CFR 3285 Model Manufactured Home Installation Standards

2.2.2. 24 CFR 3280 Manufactured Home Construction and Safety Standards.

2.2.3. ANSI A-A-59326

2.2.4. NEC – National Electrical Code

2.2.5. IEC 603-09-2 -international standard from the International Electrotechnical

Commission

2.3. Requirements

2.3.1. Operating Environment

2.3.1.1. The TPS shall be designed to operate anywhere within the contiguous United

States.

2.3.1.2. The TPS enclosure shall be designed to be placed outside, exposed to all elements.

2.3.1.3. The TSP may be subject to wind moving at significant velocity.

2.3.2. Tank Requirements

https://en.wikipedia.org/wiki/International_Electrotechnical_Commission https://en.wikipedia.org/wiki/International_Electrotechnical_Commission

2.3.2.1. The tank shall be a minimum of 250 gallons.

2.3.2.2. The TPS will have an appropriately sized tank that will provide the mandatory minimum run time required by NFPA 13D for buildings that are less than 2,000 sq.

ft. at the specified flow and pressure.

2.3.2.3. TSP design shall include a hard-piped connection suitable for the pump to draw not less than 30 gpm from the tank for not less than seven (7) minutes. Pump connection shall be located to preclude drawing sludge or debris from the bottom of the tank into the pipe and/or pump. Pump connection and tank capacity shall be designed and configured to prevent siphoning air into the pump inlet during the seven (7) minute minimum run time. Not less than 210 gallons of water shall be available for sprinkler use before air enters the pump connection.

2.3.2.4. Water tanks shall be designed to be filled manually using a garden hose connected to a standard hose bibb supplied as part of the MHU.

2.3.2.5. Water tanks shall have a drain valve so that the tank can be drained when the TPS is decommissioned. A standard hose bibb connection arranged to allow connection of an ordinary garden hose is one way to accomplish this requirement.

2.3.3. Water Pump Requirements

2.3.3.1. The minimum flow rate of the fire pump shall be 30 gpm at 40 psig , measured at the far end of the flexible water connection five feet (5’) above the level of the pump discharge.

2.3.3.2. Pump shall be not less than 1 HP.

2.3.3.3. Pump motor shall be 60 HZ, single-phase, 230/240 Volt.

2.3.3.4. Pump motors shall be enclosed in a minimum NEMA Open Drip Proof (ODP) enclosure.

2.3.3.5. The contractor shall provide the operational parameters of the pump which shall consider the water connection piping and water line. The contractor shall provide the maximum distance where the pump will supply the required flow and pressure.

2.3.4. Control Requirements

2.3.4.1. The TPS shall include all system control and test features required by NFPA 13D.

2.3.4.2. The TPS shall include all controls for the thermal protection system within the

TPS.

2.3.4.3. The TPS shall include all controls required for the thermal protection system required for the flexible hose connection between the TPS and the MHU.

2.3.4.4. The TPS shall include all controls for any alarm system included in the TPS.

2.3.5. Enclosure Requirements

2.3.5.1. The TPS including the water tank(s); pump(s); associated piping; electrical system

(except the external electrical disconnect); heating system; alarm controls; and, water and electrical connections shall be fully surrounded by a rigid weather resistant enclosure.

2.3.5.1.1. For purposes of this requirement weather resistance shall mean protection against wind, blowing dust, rain, hail, snow, UV and temperature.

2.3.5.2. The TPS enclosure shall provide access for maintenance and repair and testing.

Access shall be provided via a locking access panel or door that permits all maintenance activities to be accomplished without disassembly of the enclosure.

2.3.5.3. The enclosure shall provide tamper protection for the equipment and connections inside the TPS enclosure. The design, installation and maintenance requirements shall protect against tampering and other foreseeable damage.

Theft deterrent or prevention is not intended here, nor is there any intent to prevent entry or damage by determined individuals using tools. The tamper resistance is intended to prevent the curious occupant or passerby from disabling the sprinkler system, or freeze protection.

2.3.5.4. Any lock that is required to make the TPS enclosure tamper protected may be either a deadbolt or a pad lock that uses “SCHLAGE” brand, 6-pin Everest cylinders with a C123 keyway that shall be keyed to a 6-pin combination. The key combination shall be “746105” for all locks required on the TPS.

2.3.5.5. The enclosure shall be insulated. Thermal performance of the enclosure insulation shall be coordinated with the TPS heating system to provide an integrated freeze-protection system.

2.3.5.6. The electrical connections shall be wired to an enclosed junction box described herein.

2.3.5.7. The water connection from the TPS to the MHU shall be a flexible connection that passes through a sealed enclosure penetration. The water connection penetration of the TPS shall include the heat-trace and insulation needed to keep the water connection and the water line protected against freezing.

2.3.5.8. The enclosure shall have a roof that can withstand snow and roof load of 40 pounds per square foot. Flat, curved and pitched roofs shall be designed to resist the following live loads, applied downward on the horizontal projection.

2.3.5.9. The TPS system shall be self-contained. The floor of the TPS shall be structurally sound and designed to support the TPS in storage, transportation and operation.

2.3.5.10. The enclosure shall be designed to be lifted by a forklift or vehicle equipped with forklift forks.

2.3.5.11. The enclosure shall be designed to be exposed to the weather with no monthly maintenance and minimal overall maintenance required for a minimum of five (5) years.

2.3.5.12. The TPS system shall be designed to sit directly on the ground. Typical installation will be on a “pad” created by using compacted gravel. The material used for the portion of the enclosure that is designed to come in contact with the ground may be pressure treated lumber or other material as recommended by the TPS manufacturer. The TPS system delivered to FEMA shall include any mounting pad, or ground cover required for the installation of the TPS enclosure, unless the TPS enclosure is to be placed on a standard manufacture home ABS pads. The installation contractor not the TPS manufacturer will provide the standard manufactured home ABS pad. If the TPS manufacturer chooses to use ABS pads as part of the TPS installation the TPS manufacturer shall provide, as part of the instructions, the quantity and the location of the pads.

2.3.5.12.1. ABS pads can range in size. When providing installation instructions for the

TPS that uses ABS pads indicate, with a diagram and written instructions, the placement of the ABS pads.

2.3.5.13. A durable document storage case or packet securely fastened shall be mounted on the inside of the TPS enclosure. Paper or cardboard is not considered a durable material for this document storage case or packet. The document storage case or packet shall be easily accessible to someone through the opening for the access door. One copy of the complete TPS documentation shall be provided inside this case or packet.

2.3.5.14. FEMA MHUs are covered in white or light grey vinyl siding.

2.3.5.14.1. TPS enclosure shall be aesthetically compatible with the exterior finish of the

MHU. Exact match with MHU siding is not required, but exterior fit and finish must not look out of place, or attract undue attention.

2.3.5.15. The TPS enclosure shall be designed so that it is stable and not “top heavy” when placed in position for use and when configured for transportation.

2.3.5.16. Any tools provided with the TPS shall be securely mounted inside the TPS enclosure.

2.3.5.17. The TPS shall be freestanding not requiring the TPS to be attached to the MHU.

2.3.5.18. Each of a TPS wind resisting parts (including, but not limited to, shear walls, diaphragms, ridge beams, and their fastening and anchoring systems), and its components and cladding materials (including, but not limited to, roof trusses, wall studs, exterior sheathing, roofing and siding materials, exterior glazing, and their connections and fasteners) shall be designed by a Professional Engineer or

Architect to resist he design wind loads for Exposure C specified in ANSI/ASCE 7–

88, ‘‘Minimum Design Loads for Buildings and Other Structures,’’ for a fifty-year recurrence interval, and a design wind speed of 110 mph.

2.3.5.19. Each TPS shall have provisions for support/anchoring that, when installed, will resist overturning and lateral movement (sliding) of the TPS as imposed by the respective design loads. FEMA will require that the contractor responsible for installing the TPS will use the appropriate manufactured home anchors and strapping for 24 CFR 3280 and 24 CFR 3285.

2.3.5.20. Support for each TPS shall include loops affixed to the top of the TPS that an installation contractor can pass manufactured home strapping material through when anchoring the TPS. The contractor shall use manufactured home roof brackets which are used or for passing a cable or strap over the manufactured home. Holds straps or cable away from roof and sides or an appropriate manufactured home strap fitting. See Diagram 3.

2.3.5.20.1. Manufactured home Tie Down strapping is 1-1/4 inches wide, made of galvanized steel which conforms to NCS BCS A225.1 (ANSI A119.3) and HUD specifications. The HUD Code requires that certified strapping must meet

ASTM specifications, have a minimum (0.30 oz. per square foot) galvanized coating and must be marked every 5 feet. Strapping material is not part of the TPS.

2.3.6. Electrical Requirements

2.3.6.1. The TPS will be connected to the MHU via an “Electrical Connection Wiring

Assembly” so that the MHU can provide electrical power to the TPS. To make the connection the TPS shall have a male inlet.

2.3.6.2. The male inlet shall be mounted or accessible from the TPS rear and when facing the TPS rear shall be mounted to the right of the water connection. See Diagram

4.

2.3.6.3. The male inlet shall be an IEC 60-309-2 International Pin and Sleeve so that power can be provided from the MHU to the TPS using the “Electrical Connection Wiring

Assembly.”

2.3.6.3.1. The male plug inlet shall be an IEC 60-309-2 International Pin and Sleeve compliant and IP67 or IP66 Rated (Water tight);

2.3.6.3.2. The male inlet shall use IEC 60-309-2 connection number 430B12W.

2.3.6.4. Male inlet tamper protection.

2.3.6.4.1. The IEC 60-309-2 inlet shall be protected from tampering. The contractor may choose to use a junction box or the contractor may choose to develop their own method to protect the connector.

2.3.6.4.2. There must be sufficient room within the protected area for the male connector inlet, the female plug connector on the power cord and at least 3 inches of power cord cable.

2.3.6.4.3. If the contractor chooses to use a junction box the junction box shall be:

2.3.6.4.3.1. The junction box shall be rated NEMA 3R or better.

2.3.6.4.3.2. The junction box shall be lockable with a pad lock keyed as required or closed using screws. The junction box shall not be closed by a non-lockable clasp.

2.3.6.4.4. If the contractor choose to not to use a junction box the tamper protection shall be; fully enclosed providing protection using either a hinged lockable cover or screws.

2.3.6.4.5. The electrical connection for the TPS shall be mounted on the TPS rear. The electrical connection shall be placed as close to the ground as practical keeping in mind the tamper requirements and the flexibility and physical properties of the Electrical Connection Power Cord.

2.3.6.5. Internal wiring within the TPS shall include:

2.3.6.5.1. The TPS shall include a circuit breaker panel and circuit breakers which shall provide the ability to turn individual items within the TPS off. Items that will need to be powered include:

2.3.6.5.2. The fire sprinkler water pump.

2.3.6.5.3. The heater for keeping water within the fire sprinkler supply tank from freezing.

2.3.6.5.4. The heat-trace used to prevent the water in the flexible connection between the TPS and the MHU from freezing.

2.3.6.5.5. An alarm that is horn and strobe that provides notification that there is water flow to the sprinkler system.

2.3.6.5.6. The alarm that provides notification that there is a temperature issue (freeze protection) within the TPS.

2.3.6.6. All wires shall be labeled and color-coded.

2.3.6.7. Electrical connections within the TPS shall be made in accordance with NEC.

2.3.6.8. Main power supply shall be 30 Amp, 240V / 1 Phase / 60 Hz. Conductors shall be clearly labeled as being the main power supply.

2.3.6.9. Water line insulation shall be fixed to permit water connection hose to be installed as intended. Turning radius of the hose assembly shall not be greater than 12 inches to permit installation underneath the MHU. Closed cell foam insulation is one way to achieve this. Thickness of the insulation shall be determined by calculations based on the design temperature stated herein. The

MHU manufacturer shall provide a closed cell foam line flange cover to insulate the union that joins the MHU sprinkler system to the TPS. This will be installed after the water line connection to the TPS is complete at the final installation site.

2.3.7. Electrical Connection Wiring Assembly

2.3.7.1. The contractor shall provide an electrical connection Wiring Assembly. See

Diagram 5 for examples of components.

2.3.7.2. Electrical Connection Wiring Assembly shall be rated for 240 volts 30 amps;

2.3.7.3. IEC 60-309-2 International Pin and Sleeve compliant;

2.3.7.4. The connections shall be rated as water tight IP69K

2.3.7.5. One end of the Electrical Connection Wiring Assembly shall have a female connector rated for UL 746C;

2.3.7.6. One end of the Electrical Connection Wiring Assembly shall have a male connector rated for UL 746C;

2.3.7.7. The wire used in the Electrical Connection Wiring Assembly shall be constructed of minimum 10 gage THHN wire;

2.3.7.8. The wire used in the Electrical Connection Power Cord shall be protected by UL listed “liquid tight flexible, direct bury conduit”;

2.3.7.9. The Electrical Connection Wiring Assembly shall provide 20 feet (two inches tolerance plus) of cable exclusive of any connections. The cable shall be measured from the rear of one connector to the rear of the other connector.

2.3.7.10. At a minimum the Electrical Connection Wiring Assembly shall be tested to UL183 for the following:

2.3.7.10.1. Polarity Testing

2.3.7.10.2. Ground-Continuity Testing

2.3.7.10.3. Dielectric Voltage-Withstand Testing

2.3.7.11. FEMA requires that the entire Electrical Connection Wiring Assembly, be prefabricated at a UL certified facility utilizing UL listed Conduit, conductors, and fittings.

2.3.7.12. Manufacturer of Electrical Connection Wiring Assembly must be ISO9001-2008 certified.

2.3.8. Water Connection

2.3.8.1. The TPS shall have a standardized water connection that will allow the Water

Connection Hose to be connected to the TPS.

2.3.8.2. The contractor shall install a stainless steel male 1-1/2 inch cam and lock water fitting on the exterior of the TPS. The connector shall be installed on the rear side of the TPS. The interface between the connector and the interior of plumbing of the TPS shall be left to the contractor’s design. See Diagram 6.

2.3.8.3. Heat trace that is installed as part of the freeze protection system shall provide protection for the water connection.

2.3.9. Water Connection Hose

2.3.9.1. The water connection between the TPS and the MHU shall be made of cross-linked polyethylene (PEX) tubing approved for use in NFPA 13D sprinkler systems.

2.3.9.2. The water connection and water line shall be 1½ inches in diameter.

2.3.9.3. The water connection hose ends shall be identified as either the TPS end or the

MHU end.

2.3.9.4. The water connection and water line shall be protected by approved self-regulating heat-trace. The heat-tracing shall be specifically “Listed” by a nationally accredited testing laboratory (e.g., Underwriters Laboratory – UL) for use on sprinkler systems. Examples of acceptable heat-trace are: Thermon FLX™

Self-Regulating heat-trace or Raychem® XL-Trace self-regulating heating cable or equal. If the contractor chooses not to use one of these heat-trace products the contractor shall provide documentation that the substitute is an approved alternate product Listed by a nationally accredited testing laboratory.

2.3.9.5. Heat-trace shall be installed in compliance with the manufacturer’s installation manual. The TPS shall provide an additional two feet of listed heat trace beyond the junction.

2.3.9.6. Water line insulation shall be closed cell foam insulation. Thickness of the insulation shall be determined by calculations based on the design temperature stated herein. The MHU manufacturer shall provide a closed cell foam line flange cover to insulate the union that joins the MHU sprinkler system to the TPS. This will be installed after the water line connection to the TPS is complete at the final installation site.

2.3.9.7. TPS install kit

2.3.9.7.1. The TPS installation kit shall include all material required to install and seal the closed cell foam insulation.

2.3.9.7.2. Closed cell foam insulation shall be provided with the TPS. The closed cell foam insulation shall be part of the water connection freeze protection when installed in combination with the heat-trace. The contractor shall ensure that the closed cell foam insulation is packaged for transportation with the TPS.

2.3.10. Alarms

2.3.10.1. The TPS shall have two alarms. These alarms shall be mounted on the exterior of the TPS enclosure. The alarm horn and strobe for pump operations and the alarm notification device for low temperature shall be separate and shall be mounted in such a way that the alarm notification devices are protected from tampering.

2.3.10.2. Alarms shall be mounted on the TPS Front. See Diagram 7.

2.3.10.3. The Pump Operation Alarm shall be mounted closer to the MHU.

2.3.10.3.1. Pump Operation Alarm:

2.3.10.3.1.1. The TPS shall be equipped with a combination audible local alarm and visual notification appliance (strobe), Potter model SH-120 or approved equivalent.

2.3.10.3.1.2. The contractor shall provide and install alarm initiating device and alarm circuit wiring so that the alarm sounds whenever the pump runs.

2.3.10.3.1.3. The pump operation alarm is a local alarm only, dial-up or remote monitoring is not required.

2.3.10.3.2. Low Temperature Alarm:

2.3.10.3.2.1. The contractor shall provide and install a low temperature alarm in the

TPS. The low temperature alarm shall alert in the event that the temperature within the TPS falls below 35°F, or in the event of a loss of electrical power to if the heat-trace and/or heating system becomes inoperable.

2.3.10.3.2.2. The low temperature alarm is a local alarm only; dial-up or remote monitoring is not required.

2.3.10.3.2.3. The low temperature alarm will sound and flash on the exterior of the

TPS enclosure.

2.3.10.3.2.4. The low temperature alarm shall have battery backup sufficient to sound the alarm for 12 continuous hours in the event of a low temperature during a power failure.

2.3.10.4. Surface mounted alarms shall have weatherproof exteriors. Recessed mounted alarms shall be water tight and have weatherproof covers.

2.3.10.5. Alarms shall have a sound output rating of at least 80 decibels at 10 feet.

2.3.10.6. Alarms shall have a visual notification appliance (strobe) that has an output of at least 15 candela.

2.3.10.7. A placard shall be placed immediately adjacent to the exterior pump operation alarm. The p placard sh all st at e “CALL FIRE DEPARTMENT WHEN THIS ALARM

SOUNDS - RESID EN T IAL FIRE SP RIN KLER IN OPERATION ” in red co lor o n whit e b ackgro u n d . T ext siz e p rio r to th e d ash sh all b e no less t h an t h ree in ch es (3” ) in height, text plain, and bold face font. Text size after the dash shall be no less than o n e in ch (1” ) in h eigh t , t ext p lain , and b o ld f ace f o nt . Th e p lacard sh all be made of weather proof reflective materials and shall be permanently affixed to the TPS.

2.3.10.8. A placard shall be placed immediately adjacent to the low temperature warning alar m. T he p lacard sh all st at e “CALL T HE M AINT EN ACE HOTLIN E WHEN THIS

ALARM SOUNDS – THE SPRINKLER TANK AND PUMP SYSTEM REQUIRES

M AIN T EN AN CE” in a d ark b lu e co lor o n a wh ite backgro u n d . Text siz e p rior t o th e dash shall be no less than two inches (2” ) in heigh t , t ext p lain , an d b o ld f ace f on t .

T ext siz e af t er th e d ash sh all be n o less th an o ne in ch (1” ) in h eight , t ext p lain , and bold face font. The placard shall be made of weather proof reflective materials and shall be permanently affixed to the TPS

2.3.11. Thermal Protection

2.3.11.1. Any time there is water in the tank, pump, connected piping, all TPS components, and all piping between the TPS and the point of connection to the sprinkler system on the underside of the MHU, the temperature of the water and interior of the TPS enclosure shall be maintained at or above 42°F (5.6°C).

2.3.11.2. Antifreeze solutions shall not be used in any portion of the system.

2.3.11.3. Design temperature shall be steady-state ambient temperature of −35°F (35°F below zero or -37.3°C).

2.3.11.4. Design calculations for freeze protection shall be prepared and stamped by a licensed Professional Engineer with competency in designing freeze protection systems. Reference standards shall be cited, cut sheets identifying specific product(s), and designer’s experience with freeze protection systems shall be included in submittal to FEMA.

2.3.11.5. The water connection between the TPS and the MHU shall be installed so that the connection is appropriately protected against the elements to include but not be limited to freeze protection.

2.3.12. Tamper Protection

2.3.12.1. All water control valves, water connection and electrical connections must be protected against tampering either within the TPS, behind the locked maintenance access door or with its own lock or secured access cover.

2.3.12.2. Locks that are keyed alike shall be provided for each valve, door, or other lockable device that is associated with the TPS. All locks shall be manufactured by

Schlage and keyed as specified above in the enclosure requirements.

2.3.12.3. All connections that are connected directly to the TPS shall be hard wired.

2.3.12.4. Reserved

2.3.13. Test Requirements

2.3.13.1. Initial Testing: The TPS shall be tested prior to shipment to FEMA.

2.3.13.1.1. All electrical components and circuits shall be tested to ensure that all elements perform as designed and there are no electrical faults.

2.3.13.1.2. The water system shall be tested including the tank, pump and connection to the MHU (it does not require a physical connection to an actual MHU). The connection shall ensure that there are no leaks and that the water system performs as designed.

2.3.13.1.3. After initial testing, the water tank, pump and piping shall be emptied prior to shipment of the TPS to FEMA.

2.3.13.2. Maintenance Testing requirement: The TPS shall be provided with a test connection downstream of the fire sprinkler water pump. This connection shall be designed to create a flow of water flow of not more than 13 gpm when the pump is running. The maintenance test connection shall return water to the fire sprinkler water storage tank.

PART 3. DOCUMENTATION AND LABELING

3.1. Documentation and Labeling Overview

3.1.1. The TPS shall be accompanied by adequate documentation to ensure that the TPS was properly manufactured and that provides FEMA with clear instruction on the storage (including any maintenance in storage); transportation; installation;

maintenance during use; and decommissioning of the TPS.

3.1.2. Labeling shall provide the information that is needed to clearly identify items and components of the TPS and to provide instruction if one of the TPS alarms is activated.

3.1.3. All instructions shall include a logical sequence of steps to achieve the stated objective. Instructions shall be specific to each unit and shall include explanatory material and full description of the actions that are to be taken and a complete list of the tools needed. Photos or diagrams shall be specific to each unit and may be included to illustrate the instructions as necessary. Include checklists for each operation. Instructions shall be written at the eighth-grade level of comprehension.

3.2. Documentation Requirements

3.2.1. Design Documentation

3.2.1.1. Complete design documentation shall be provided for the TPS including blueprints/drawings, water flow diagrams, electric diagrams, controller diagrams, wiring diagrams, and the operation parameters (e.g., maximum number of sprinklers heads supported and maximum linear feet of pipe supported).

3.2.1.2. A complete parts list shall be provided. Parts list shall include manufacturer, model number, part number and cut sheet(s) for every component that is provided.

3.2.1.3. Detailed list of all tools required to ship, install, operate, and decommission the

TPS shall be provided. Where special tools are required, include manufacturer, model, size, and cut sheet.

3.2.1.4. All design calculations shall be provided.

3.2.1.5. An acceptance test plan for verifying TPS performance prior to shipping the TPS to FEMA shall be provided.

3.2.1.6. All acceptance test results for each TPS shall be provided. Include a copy of the certification in the information packet shipped with the TSP.

3.2.2. Operation Documentation

3.2.2.1. Provide complete operating instructions for the TPS including: handling, storage, shipping, site preparation, installation, operation, maintenance, decommissioning, and preparation for shipping from installation site

3.2.2.1.1. Handling and storage instructions shall address all requirements for the long term storage of the TPS at a FEMA manufactured housing storage site

(MHSS). To include but is not limited to information regarding any periodic maintenance that is needed for the TPS and the frequency of the periodic maintenance, how many can be stacked on top of each other and what is the proper storage orientation (which end is up), temperature limits and any special handling instructions required.

3.2.2.1.2. Shipping instructions shall address any requirements for preparing the TPS for shipment, shipping the TPS via common carrier as a full load or a less than load (LTL) shipment. This shall include posting of the TPS, stacking restrictions or requirements of the TPS and other requirements.

3.2.2.1.3. Installation instructions shall include: all requirements for setting up the TPS, connecting the TPS to the MHU and testing the TPS; site preparation; leveling requirements and tolerances and dimensional requirements; the need for a barrier (such as a manufactured home ABS pad) that is required between the

TPS and the gravel/crushed rock base; electrical and water connections;

filling the water tank; field site testing upon startup and other instructions as required. Provide detailed instructions for proper preparation of the installation site.

3.2.2.1.4. Installation instructions shall clearly state if the local ambient temperature is expected to fall below 50°F, water shall not be added to the system until and unless electrical power is available for the freeze protection system.

3.2.2.1.5. Complete instructions for installation of the flexible connection, heat trace, and insulation shall be provided.

3.2.2.1.6. FEMA plans to have the TPS installed on the ground adjacent to the rear exterior access/egress stairs.

3.2.2.1.7. Operation and maintenance instructions shall include: testing requirements for the TPS and alarms as well as the required frequency of such tests; any preventative maintenance requirements or activities and any other maintenance, testing or operational requirements; color diagram of the electrical circuits within the TPS from the exterior disconnect to the item(s) connected to the electrical circuits.

3.2.2.1.8. Decommissioning instructions shall include: all requirements for decommissioning the TPS so that is can be transported to FEMA. The steps required to disconnect the TPS from the MHU and the requirements for uninstalling the TPS from the site where it is installed for use. The deactivation instructions shall describe how to decommission the TPS so that it can be reused if required by FEMA. Deactivation instructions shall include a pre-deactivation testing requirement to ensure that the TPS is functioning as designed; the removal of water from the TPS tank and TPS pump; and, the safe storage of the water and electrical connection as well as any specific preparation required to transport the TPS

3.2.3. Operating instructions shall be submitted for review and comment by FEMA prior to delivery of the MHUs. Submittal shall be in MS Word format. The operating instructions shall be revised and resubmitted as necessary to incorporate FEMA review comments. After acceptance of the operating instructions by FEMA, one durable, printed copy shall be bound and provided in each MHU, and an electronic copy in MS Word format shall be provided to FEMA. Install the bound hard copy in either a rigid wall-mounted fixture approved by FEMA, in the mechanical closet or with the sprinkler water tank.

3.3. Labeling

3.3.1. All TPS labeling and signs shall be printed with one inch (1”) letters with the letters being a high contrast to the label or sign background.

3.3.2. The TPS shall have the following labels and/or signs:

3.3.2.1. Control Valve Labels: All TPS control valves shall be labeled to note their function and normal position. Example: Water Tank Fill Valve – Normally Closed. Labeling shall be permanently affixed and durable.

3.3.2.2. Pipes: All pipes shall be labeled with the normal direction of water flow.

3.3.2.3. Removal Covers: Any cover that is entirely removable shall be labeled with its use and location and the portion of the TPS that houses the cover shall be labeled with the name of the cover required.

3.3.3. The TPS electrical system shall have the following labels and/or signs:

3.3.3.1. Circuit Breaker Label: Permanently mark circuit breaker(s) providing electrical power to the pump, heater, heat-trace and/or alarms to indicate their function.

The TPS electrical system shall have the following labels and/or signs:

3.3.4. Water supply tanks shall be labeled: “Sprinkler system water supply tank. Non potable water, Do not drink this water.” Letters shall be at least one inch tall, easily legible, and shall be bright red in color. Provide a ready-to-use self-adhesive decommissioning label in an envelope fastened to the interior door of the water heater closet for the operating instructions packet. Decommissioning label will be applied to the inside of a kitchen cabinet when the MHU is removed from service to alert future owner(s) that the sprinkler system has been disabled. Decommissioning label shall be red with white letters at least one-inch tall and shall read: “This

Manufactured Home was originally equipped with automatic fire sprinklers to provide the highest level of occupant safety. The installed sprinkler system is NOT connected to the domestic water supply and must be connected to a separate water supply. The sprinkler system has been disabled, major components have been removed, and must be serviced by a qualified fire sprinkler technician to ensure continued occupant safety.”

PART 4. QUALITY CONTROL

4.1. Performance Testing

4.1.1. Perform acceptance tests and the hydrostatic testing for the TPS in accordance with

NFPA 13D and other FEMA requirements. Submit a signed and dated certification of acceptance test completion with each TPS. Certification shall include details of tests performed and the results of each test.

4.1.2. After testing, contractor shall remove all water from the sprinkler system.

PART 5. OTHER REQUIRMENTS:

5.1. Site Installation Parts and Accessories Preparation:

5.1.1. Provide equipment mounting pad if required for the TPS enclosure.

5.2. Parts and Installation Kit:

5.2.1. All parts, materials, installation instructions, and special tools required to install, operate, and maintain the TPS shall be provided.

5.2.2. The TPS shall be equipped with all parts and materials needed to install the unit and make it fully functional, with the exception of standard hand tools, garden hose to fill the tank, and water.

5.2.3. Local purchase of any parts or materials is not acceptable;

5.2.4. Parts and materials shall be sealed in clear plastic bags that are clearly labeled to permit verification and inventory. Plastic bags shall be packaged in a clearly labeled cardboard box.

5.3. Packaging:

5.3.1. Securely package the TPS and parts kit for shipping. Package and ship each complete TPS as a separate, stand-alone unit containing all parts, materials, and instructions needed for installation.

5.3.1.1. Consolidate packaging into the minimum number of packages. Label all packages with a discrete package number and the total number of packages in that TPS

(i.e., Box 2 of 4).

5.3.1.2. Provide and install thread protecting plugs or caps on all exposed pipe or coupling threads prior to shipping.

5.3.1.3. The TPS shall be assembled to the maximum extent possible.

5.4. Decommissioning

5.4.1. Sprinkler system shall include provisions and components necessary to allow the system to be easily deactivated, disconnected and fully drained with common tools when FEMA removes the MHU. Include a procedure in the operation manual by which the sprinkler system and all components can be emptied into the sanitary sewer system of the MHU during the deactivation process.

PART 6. INTERFACE AND CONNECTIONS

6.1. Flexible Water Connection for the Water Connection Hose

6.1.1. The water connection hose shall have two different connections identified as the

MHU end and the TPS end. See Diagram 8.

6.1.2. Each TPS shall be equipped with a prefabricated, insulated and heated flexible tube for connecting the TPS to the MHU.

6.1.3. Provide all parts, equipment, materials, and complete instructions to protect the entire length of the flexible connection against freeze. Freeze protection shall meet the temperature and exposure criteria specified.

6.1.4. Additional length of heat-trace and insulation shall be provided so that the male PEX to NPT on the flexible water connection, the female union and approximately six inches (6”) of the MHU male NPT connector can be freeze protected.

6.1.5. Flexible connection shall be a minimum of 20 ft. long as measured from the exterior surface of the TPS enclosure.

6.1.6. The MHU end shall:

6.1.6.1. The end of the flexible water connection designed to be attached to the MHU shall be a 1½ inch PEX to male NPT connector. (e.g., UPONOR WIPEX Fitting part number 5550015 or Viega PEX Press adaptor part number 90581)

6.1.6.2. The MHU will provide a 1½ inch male NPT. To mate the TPS to the MHU, the contractor shall provide a brass or chlorinated polyvinyl chloride (CPVC) 1½ inch female NPT union as part of the TPS installation kit.

6.1.6.3. Provide a methodology and parts to secure the insulated 1½ inch female NPT union to the MHU so that there is no stress on the water connection. The male connection from the MHU will exit the MHU and then turn 90 degrees and run parallel to the floor of the MHU. All parts required to secure the union shall be included in the TPS parts kit, bagged separately and labeled.

6.1.7. The TPS end shall:

6.1.7.1. Have a stainless steel female 1-1/2 inch cam lock connector water fitting.

6.1.7.2. The contractor shall be responsible for joining the 1—1/2 inch pex hose to the cam lock connector and ensuring that the connection is water tight.

6.1.7.3. The female cam lock connector shall be a PT Coupling Secure-Lok, Continental-

Insta-Lock, Dixon EZ Boss-Lock or equal.

6.1.7.4. The contractor shall provide a “SCHLAGE” padlock as specified above for the PT

Coupling Secure-Lok, Continental-Insta-Lock, Dixon EZ Boss-Lock or equal.

http://encyclopedia.thefreedictionary.com/Chlorinated%2Bpolyvinyl%2Bchloride

PART 7. DELIVERABLE REQUIREMENTS

7.1. Required Elements

7.1.1. Drawings and calculations:

7.1.1.1. Provide a complete set of engineering drawings and calculations. Drawings and calculations shall include at a minimum:

7.1.1.1.1. Dimensioned drawings detailing all aspects of the proposed system.

7.1.1.1.2. Stamped design calculations for the electrical and freeze protection systems, including designer qualifications.

7.1.2. Parts List:

7.1.2.1. Provide a complete parts list including manufacturer, model number, and all other specifications required to procure repair or replacement parts for the sprinkler system.

7.1.2.2. Include manufacturer’s cut sheets for each component to be used, clearly identifying the specific model or features to be used in the system.

7.1.2.3. Include documentation that components or parts that are required to be Listed by an independent testing laboratory are so Listed.

7.1.3. Tool List:

7.1.3.1. Provide a list of all tools or equipment required for FEMA to install at final home location, operate, maintain, and decommission the provided sprinkler system.

Where special tools are required, include manufacturer, model, size, and cut sheet.

PART 8. DELIVERY, TRANSPORTATION AND STORAGE REQUIREMENTS

8.1. Required Elements

8.1.1. Delivery:

8.1.1.1. FEMA anticipates that the TPS will be received and stored at one of the

Manufactured Housing Storage Site (MHSS) located in Selma, AL or Cumberland, MD.

8.1.2. Storage:

8.1.2.1. FEMA will typically store the TPS either in standard intermodal containers or in warehouse space.

8.1.2.2. The TPS shall be designed so that they can be stored be being stacked at least two high. This requirement is for storage only. To meet this requirement the TPS may be either:

8.1.2.2.1. Shall be designed so that its structure allows the TPS to be stacked; or

8.1.2.2.2. Shall be provided with and encased in a “shipping/storage frame” which will allow the TPS to be stacked.

8.1.2.3. TPS shall be designed to be stored in any of the environments identified below.

8.1.2.3.1. MHSS at Selma in an standard intercontinental container exposed to the elements

8.1.2.3.2. MHSS at Selma in warehouse space

8.1.2.3.3. MHSS at Cumberland in an standard intercontinental container exposed to the elements

8.1.2.3.4. MHSS at Cumberland in warehouse space

8.1.2.4. The contractor shall provide FEMA with any inspection and/or maintenance requirements for interim and long term storage. The contractor shall define interim and long term storage.

8.1.2.4.1. Interim storage is defined as 6 months or less.

8.1.2.4.2. Long Term storage is defined as storage beyond 6 months.

8.1.3. Transportation:

8.1.3.1. TPS will be shipped either in intermodal containers 20’ or 40’; as part of a Less

Than Load (LTL) shipment; in a 48’ or 53’ box trailer; or, on a flatbed trailer.

8.1.3.1.1. The contractor shall design the TPS so that they maximize the number of TPS that can be shipped per container.

8.1.3.1.2. The contractor shall design the TPS so that they minimize the storage footprint of TPS at the MHSS or other location.

8.1.3.2. At FEMA’s discretion, the agency may require that the contractor provide either

20’ or 40’ intermodal containers as part of the delivery requirement.

8.1.4. Storage and Transportation:

8.1.4.1. To allow FEMA to plan for current and future transportation that contractor shall provide the following Load plans:

8.1.4.1.1. The contractor shall provide load plans for the shipping and storage of the

TPS.

8.1.4.1.2. The transportation load plans shall identify if the TPS are able to be stacked.

It will also contain information as to how high can the TPS be stacked.

8.1.4.1.2.1. Load plans shall be provided for 20’ and 40’ intermodal containers as well as for 48’ or 53’ box trailer. See Diagram

8.1.4.1.3. The storage load plan shall identify if the TPS are able to be stacked when stored in a warehouse.

8.1.4.1.3.1. For Warehouse storage, the TPS will not be stored in the intermodal containers.

PART 9. ACRONYMS and Glossary

ABS - Acrylonitrile-Butadiene-Styrene (Terpolymer)

ANSI – American National Standards Institute

CFR – Code of Federal Regulations

CPVC – Chlorinated Poly Vinyl Chloride

FEMA – Federal Emergency Management Agency

GPM – Gallons per Minute

HP - Horsepower

Hz – Hertz (cycles per second)

MHU – Manufactured Housing Units

NEC – National Electric Code

NEMA – National Electric Manufacturers Association

NFPA - National Fire Protection Association

ODP - Open Drip Proof

Revised Tank & Pump System Requirements

PEX - Cross-Linked Polyethylene

PSI – Pounds per Square Inch

PSIG – Pounds per Square Inch Gauge (or Gage)

TPS – internal components of the TPS system

TPS enclosure - the ridged housing that protects the TPS from weather, tampering and provides freeze protection.

TPS system – the TPS and the TPS enclosure

UL – Underwriter’s Laboratory

Glossary

Cam locks also called Cam and groove coupling, a kind of Hose coupling used to rapidly connect and disconnect fitting on piping or hose, they come in a variety of materials to be used with different liquids and a variety of sizes to accommodate hose or piping diameter. Cam locks uses

ANSI A-A-59326 formerly Military Specification MIL-C-27487.

Cam lock fasteners are categorized as:

Type "A", has a male camlock end and a female pipe thread (NPT thread) of the same size.

Type "B", has a female camlock end and a male pipe thread of the same size.

Type "C", has a female camlock end and a male hose tail on the other.

Type "D", has a female camlock end and a female pipe thread of the same size.

Type "E", has a male camlock end and a male hose tail on the other.

Type "F", has a male camlock end and a male pipe thread of the same size.

Type "DC" is an end cap with female camlock.

Type "DP" is an end cap with male camlock.

https://en.wikipedia.org/wiki/Cam_and_groove https://en.wikipedia.org/wiki/Hose_coupling https://en.wikipedia.org/wiki/Piping https://en.wikipedia.org/wiki/Hose_(tubing) https://en.wikipedia.org/wiki/Liquid https://en.wikipedia.org/wiki/Diameter https://en.wikipedia.org/wiki/National_Pipe_Thread

Diagram 1

Diagram 2

Diagram 3

Diagram 4

Diagram 5

Diagram 6

Diagram 7

Diagram 8

Diagram 9

Examples of load plans for 20’ and 40’ Intermodal Containers