Attachment_2_Tarps_-_SOW.pdf

PDF 126 KB Posted

Attached to
Tarps 150, 000
Solicitation number
70FB7018Q00000045
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
C1a_RFQ_70FB7018Q00000045.pdf PDF
70FB7018Q00000045_A0002.pdf PDF
C1a_RFQ_70FB7018Q00000045.pdf PDF
70FB7018Q00000045_A000001.pdf PDF
Attachment_1_Price_and_Delivery_Schedule.xlsx XLSX spreadsheet
C1a_RFQ_70FB7018Q00000045.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Self-Help Tarps

I. Background: FEMA has a need to procure self-help tarps to replenish stock and respond to the looming threat of Hurricane Florence.

II. Scope: The Contractor shall provide 150,000 self-help tarps to FEMA in accordance to the specifications and delivery requirements outlined below.

III. Specifications:

Self-Help Tarp to be used for small areas of roof damage Size - 20’ x 25’ Woven polyethylene 8 x 8 (10 x 10 or 14 x14 acceptable), 800 Denier Thickness: Preferred thickness is 5-6 mil. However, various thicknesses from

5-10 mil are still acceptable.

UV Resistance - 80% after 200 hr per ASTM D7238-06 FR Tested - IAW Class A ASTM E84-11 Standard Non-corrosive grommets at corners and minimum of 3’ on center on edges or an alternative to grommets to secure the tarp in place.

Hems folded over Corners reinforced Color - Medium blue.

Each Tarp must be packaged in a cardboard box with two (2) 100’ lengths of

550 pound test parachute cord.

Each package shall be clearly marked with a label indicating the size and number of tarps Boxes to be palletized in the contractor’s standard commercial casing which shall be shipped on industry standard size pallets (48 inches by 40 inches).

Shrink wrap shall be fully over all sides (excluding the top and bottom) with a minimum of (10) layer of shrink-wrap to ensure the capability to double stack pallets without comprising the sturdiness of load. The finished product will be placed onto a 48 inch by 40 inch 4 way wooden pallet. The over-all height of the pallet will not exceed 55 inches.

IV. Delivery

The Government will require delivery to the below Distribution Centers (DCs) as required.

Vendors are required to provide the shipping carrier and tracking numbers from the point of origin to the delivery locations.

Delivery shall be within 90 Days after award to the three FEMA Distribution

Centers (DC) below.

V. Miscellaneous

The contractor shall have the ability to track their shipments and be prepared to let FEMA know where/when inbound Tarps are located and shall arrive.

VI. Fraud and Abuse

All tarps will be randomly inspected and must meet all requirements. All frauds and abuse cases will be reported to FEMA Fraud and Prevention Branch. The tarps will follow FAR 52.246-2.

52.246-2 -- Inspection of Supplies -- Fixed-Price. (Aug. 1996)

(a) Definition. “Supplies,” as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.

(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.

(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor’s or subcontractor’s premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.

(e)

(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.

(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.

(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.

(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.

(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either

(1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or

(2) terminate the contract for default.

Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.

(i)

(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time --

(i) When Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract; and

(ii) When the supplies will be ready for Government inspection.

(2) The Government’s request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished.

Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor’s plant, nor more than 7 workdays in other instances.

(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.

(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.

(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor

(1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor’s plant at the Contracting Officer’s election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or

(2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor’s plant and return to the original point when that point is not the Contractor’s plant.

If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.

File details come from the government source that posted it.