ATTACHMENT E
Quality Assurance Surveillance Plan (QASP)
RFP 70B06C22R00000038
Performance Requirements Summary
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The following matrix includes performance standards. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
The incentive for achieving the Acceptable Quality Levels (AQLs) listed in the Performance Requirements Summary below is a positive past performance evaluation, and it should be understood that failure to meet the performance metrics below will result in negative past performance evaluations. Past Performance Evaluations will be submitted to the Contractor Performance Assessment
Reporting System (CPARS) for all government agencies to review, and will contain detailed narratives explaining reasons for positive and negative assessments.
Performance
Based Task
Indicator Standard Acceptable Quality Level Method of Surveillance
System Security
PWS 1.5.4 a through f, h, i, and 1.5.4.1
System Security Segregated storage, third-party assessment (or SSP & RTM), Data encryption, Vulnerability scans, Security patches, destruction of CBLE data
No failure per six-month period of performance.
Contractor reporting in compliance with PWS.
Possible CBP-conducted Security Assessment and Section 7.1 Deliverables Table: Third-party assessment (or SSP & RTM), Monthly Status
Report, Monthly Vulnerability Scan, and
Certificate of Destruction
System Security
PWS 1.5.4 g
(also, see PWS sections 1.5.5.1, 1.5.5.2, 5.6.8 and
5.6.9)
Privacy, Rules of
Behavior, and
Security
Awareness
Training
All personnel with access to registrant PII complete training in accordance with PWS
No failure per six-month period of performance. Any failures must be resolved and approved by CBP.
Contractor reporting and inspection in compliance with PWS. Section 5.2 Milestone
Table and Section 7.1 Deliverables Table: DHS
Privacy, Rules of Behavior and Information
Technology Training completed.
Indicator Standard Acceptable Quality Level Method of Surveillance
Special
Qualifications
PWS 1.5.5
Criminal
Background
Investigation
All personnel on the contract must undergo a criminal background investigation
No failure per six-month period of performance
Contractor reporting. Section 7.1 Deliverables
Table: Monthly Status Report
Management
Plan PWS-5.1
Management
Plan Document
Describes planning actions and activities required to satisfy
PWS requirements
All activities and required items for the Management
Plan are clearly addressed in detail and contract is executed in accordance with the schedule outlined in the
Management Plan.
Contractor Reporting and Inspection. Section
5.2 Milestone Table and Section 7.1
Deliverables Table: Finalized Management Plan
Exam System
Requirements
PWS-5.3
Provide Exam
System
Exam system passes System
Acceptance Testing (SAT) and accommodates ADA requests
No failure per six-month period of performance. Any failures must be resolved and approved by CBP using the standard SAT practice.
100% Inspection; Customer feedback (zero complaints). Section 5.2 Milestone Table and
Section 7.1 Deliverables Table: Both in-person and remotely proctored Electronic CBLE
Delivery Systems
Exam
Administration
Requirements
PWS-5.4.1.1,
5.4.1.2, and
5.4.1.9
Exam
Registration and
Examinee communication
All registrants receive the 4 emails outlined in 5.4.1.9 and all registrants are assigned to a testing site
Not more than 1 failure per six-month period of performance.
Contractor reporting and customer feedback.
Section 5.2 Milestone Table and Section 7.1
Deliverables Table: Draft emails to examinees for CBP to approve; The Contractor provides draft ATPs for government review and approval for:
• The sample CBLE
• The site selection website (in-person)
• The exam appointment selection website
(remote)
• The electronic delivery CBLE system for the in-person exam administration
Indicator Standard Acceptable Quality Level Method of Surveillance
• The internet-based/remotely proctored
CBLE Exam System;
The Contractor contacts registrants via email with instructions on testing site selection (in person only), or with instructions on scheduling their remote exam; The Contractor contacts registrants via email reminding examinees to select a testing site, or to schedule their exam time; The Contractor finalizes registration changes; allows registrants to change their exam testing site and time selection if any spaces are open; The
Contractor issues updated admission tickets
(due to registration change); The Contractor contacts registrant via email with a reminder of examination, with check-in information, and behavior requirements.
Exam
Administration
Requirements
PWS-5.4.1.3,
5.4.1.4, 5.4.2.4, 5.4.3.4
ADA Requests and Examinee
Check-in
All approved ADA requests are accommodated, examinees are checked-in and are not turned away without approval from
CBP in accordance with the
PWS.
No failure per six-month period of performance.
Contractor reporting and customer feedback.
Section 5.2 Milestone Table and Section 7.1
Deliverables Table: ADA Reasonable
Accommodations Report; ADA Reasonable
Accommodations Notification
Exam
Administration
Requirements
PWS 5.4.1.6
War Room Notification to CBP via the War
Room of issues as they arise
No failure per six-month period of performance
Contractor reporting, customer feedback, inspection. Section 5.2 Milestone Table and
Section 7.1 Deliverables Table: The Contractor provides a virtual War Room
Indicator Standard Acceptable Quality Level Method of Surveillance
Exam
Administration
Requirements
PWS 5.4.1.6.1
Examinee
Cheating
Examinees caught cheating shall be allowed to continue the exam unless circumstances pose a threat to the integrity of the exam. Otherwise, proctor shall document the event and CBP will review at a later time. Prior to any termination of an exam, or turning away an examinee during check-in, the Contractor must contact CBP via the War
Room to receive prior approval.
No failure per six-month period of performance
Contractor reporting, customer feedback, inspection. Section 7.1 Deliverable Table: After
Exam Site Report
Exam
Administration
Requirements
PWS 5.4.1.6.2
(also see section
1.5.4 h)
Data Retention in case of Appeal or Court
Proceedings
If any data, including video, is retained for the in-person or remote proctoring exam administration and there is an appeal, including appeals related to a suspected event of cheating, then the contractor must maintain all data and video until as such time as directed by CBP to destroy it, or the Contractor must transfer all data in a common file format(s) to CBP via a CBP approved means.
No failure per six-month period of performance.
Contractor reporting, inspection
Indicator Standard Acceptable Quality Level Method of Surveillance
Exam
Administration
Requirements
PWS-5.4.2.1 –
5.4.2.3
Remote Exam
Registration website
Exam Registration Website passes System Acceptance
Testing (SAT) and examinees are registered for the exam in accordance with the PWS.
No failure per six-month period of performance. Any failures must be resolved and approved by CBP using the standard SAT practice.
Contractor reporting, customer feedback, inspection. Section 5.2 Milestone Table and
Section 7.1 Deliverables Table: The Contractor delivers site selection and exam time selection websites after completion of internal testing for
Government SAT and provides the link to examinees; The government provides the
Contractor with a list of registrants for the remotely proctored CBLE; Time-Selection List for the remotely proctored exam.
Exam
Administration
Requirements
PWS-5.4.2.5 and
5.4.3.6
Provide Exam
Proctors.
Remote: Maximum Proctor ratio 1:15.
In-Person: Maximum Proctor ratio 1:25.
If Contractor is granted approval to hire non-U.S.
Citizens, then the Contractor shall abide by requirements to hire legal permanent residents.
No failure per six-month period of performance. Any failures must be resolved and approved by CBP using the standard SAT practice.
Contractor reporting, sampling observations at test site locations, and inspection of quality control records.
Exam
Administration
Requirements
PWS-5.4.2.5 and
5.4.3.6
Proctor
Citizenship
If Contractor is granted approval to hire non-U.S.
Citizens, then the Contractor shall abide by requirements to hire legal permanent residents as outlined in PWS.
No failure per six-month period of performance.
Contractor reporting: Maintain an up-to-date file of all non-U.S. Citizens’ information outlined in PWS section 5.4.2.5 and provide a copy to the government upon request.
Indicator Standard Acceptable Quality Level Method of Surveillance
Exam
Administration
Requirements
PWS-5.4.2.6,
5.4.2.7, and
5.4.3.8
Proctor behavior Proctor shall be quiet (no background noise) and prevent cheating in accordance with the
PWS
No failure per six-month period of performance.
Contractor reporting, customer feedback, inspection
Exam
Administration
Requirements
PWS-5.4.2.7 and
5.4.3.10
A quiet, self-contained room
A quiet, self-contained room is defined as a room where no noise or distractions considered unsatisfactory for a testing environment could be heard and is a room with four (4) permanent structured walls (no partitions). Only dedicated testing facilities or computer labs, not hotel conference rooms or make-shift rooms created with a partition.
No failure per six-month period of performance.
Customer feedback
Exam
Administration
Requirements
PWS-5.4.2.8 –
5.4.2.10, and
5.4.2.13
Examinee disconnection procedures and
Connectivity compatibility testing
All electronic capabilities to ensure the examinee can take the test remotely
No failure for 5.4.2.8-
5.4.2.10 per six-month period of performance. For
5.4.2.13: Works with examinee through at least 3 disconnects or a single disconnection of 10 minutes per examinee.
Contractor reporting, customer feedback, inspection
Indicator Standard Acceptable Quality Level Method of Surveillance
Exam
Administration
Requirements
PWS-5.4.3.1-
5.4.3.3, 5.4.2.11 and 5.4.2.12
In-Person Exam
Site Selection
Scheduling and
Registration;
Remote Exam
Scheduling
Site selection website passes
System Acceptance Testing
(SAT). Examinee are registered for the exam in accordance with the PWS. List of scheduling windows for
Remote exam
No failure per six-month period of performance
Contractor reporting, customer feedback, inspection. Section 7.1 Deliverables Table: A draft list of testing time zone windows, including the times within the scheduling windows for the remotely proctored exam;
Final List of Testing Site Locations and Facility
Descriptions. A final list of testing time zone windows, including the times within the scheduling windows;
Site-Selection for the in-person exam and Time-
Selection for the remotely proctored exam are completed;
Testing Site-Selection List for the in-person exam. Time-Selection List for the remotely proctored exam;
The Contractor delivers site selection and exam time selection websites after completion of internal testing for Government SAT and provides the link to examinees.
Exam Site
Requirements
PWS-5.5.1, and
5.5.3 - 5.5.5
Provide Exam
Sites, equipment, and materials.
All Exam Sites, Equipment, and
Materials (including exam delivery system) available as required in the PWS.
Not more than 1 failure per six-month period of performance.
Contractor reporting, Sampling at test site locations and customer feedback, inspection of quality control records. Section 7.1
Deliverables Table: Draft List of Testing Site
Locations and Facility Descriptions for the in-person exam; Final List of Testing Site
Locations and Facility Descriptions. A final list of testing time zone windows, including the times within the scheduling windows.
Indicator Standard Acceptable Quality Level Method of Surveillance
Exam Site
Requirements
PWS-5.5.2, and
5.3.1.a
Exam Site internet connection
Exam Sites meet minimum download and upload speeds, without noticeable loading or time lag in displaying information after input from the system user
Not more than 1% of the total in-person examinee population reports an internet connectivity failure per six-month period of performance.
Customer Complaints, Contractor reporting, and inspection
Program
Management
Requirements
PWS-5.2, 5.6.1 -
5.6.4, and 7.1
Program
Management
All activities are performed in accordance with the PWS and the approved Program
Management Plan, including all milestones tasks and deliverables completed according to established timelines.
Not more than 1 failure per six-month period of performance.
Contractor reporting, observation, customer feedback, inspection of quality control records.
Section 5.2 Milestone Table and Section 7.1
Deliverables Table: Kick-off Meeting and
Meeting Minutes; Weekly Coordination
Meeting Agenda; Weekly Coordination
Meeting; Weekly Coordination Meeting Notes;
Monthly Status Reports
Program
Management
Requirements
PWS-5.6.5 and
5.6.6
NDAs All Contractor staff with access to or that will see examinee PII or SPII shall sign a DHS NDA in accordance with PWS
No failure per six-month period of performance
Contractor reporting and inspection. Section 5.2
Milestone Table and Section 7.1 Deliverables
Table: Provide NDAs.
Program
Management
Requirements
PWS-5.6.7
Sample Exam
Website
URL link provided and passes
SAT in accordance with PWS
No failure per six-month period of performance
Contractor reporting and inspection. Section 7.1
Deliverables Table: Provide Sample CBLE for public exam practice.
Indicator Standard Acceptable Quality Level Method of Surveillance
Program
Management
Requirements
PWS-5.6.10 and
5.6.11
Communication All issues communicated in a timely and transparent manner
No failure per six-month period of performance.
Inspection and Observation. Section 5.2
Milestone Table.
Program
Management
Requirements
PWS-5.6.12 -
5.6.14
Reporting All reports delivered in an accurate and timely manner
No failure per six-month period of performance.
Inspection. Section 5.2 Milestone Table and
Section 7.1 Deliverables Table: After Exam
Site Report and Exam No-Show Report; Initial
Item Analysis Report; Final Exam Item
Analysis; Site Score Report, Survey Data
Report, Raw Data Report, Individual Answer
Records.