ATTACHMENT 5 - COACA TECHNICAL PROPOSAL CONTENT REQUIREMENTS 70B06C20R00000096_R1.docx
DOCX document 31 KB Posted
- Attached to
- CBP Online Applicant Competency Assessment Service (COACA) Federal contract opportunity
- Solicitation number
- 70B06C20R00000096
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 5
70B06C20R00000096
| Evaluation Factor |
| Proposal |
Tab
| Information and materials to be provided by Offeror |
| Page |
Number
Factor 1 Technical Approach
| Tab 1: Element 1: Programming customizable CAT algorithms |
| Provide a detailed executive summary of the capability of the system for custom programming of Computer Adaptive Test (CAT) algorithms, the types of assessments and formats, test administration capabilities, and the data and other information captured by the system. Provide a listing and description of capability for the following: |
Custom developed CAT algorithms including but not limited to:
· 1, 2, and 3-parameter logistic models for dichotomous items
· Differences in item pool sizes
· User specified quadrature points and weights
· Customizable Scaling factors
· Customizable item selection methods
· Customizable item exposure methods
· Customizable CAT stopping rules
· Content balancing options
· Theta estimation approaches
· Different initial theta values
· Options for truncating theta estimates
· Ability to limit theta estimate jumps by values or numbers of items
Provide samples/illustrative mock-ups for:
· At least 2 examples of previous customized CAT algorithms programmed
· Example CAT algorithms should demonstrate ability to program adaptive algorithms for custom CATs
· Reports or other documentation that describes the technical aspects of CAT engines that have been previously programmed for clients
Factor 1 Technical Approach
| Tab 2: Element 2: System Capability |
| Provide a detailed executive summary of the system capabilities to include: |
· Random assignment of multiple series within a single applicant pool,
· Administering different tests within a test battery to applicants.
Capability of the system to:
· Maintain item response latencies,
· Maintain supplemental materials,
· Allow applicants and administrators to access automated, communications, scheduling, and on-demand access to test results,
· Types of administrator support capabilities available to include data access, data archiving, reports, and queries,
· Constrain accessibility by system roles and business rules.
The types of assessments and assessment formats supported including:
· Cognitive and non-cognitive assessments
· Multiple choice, video-based and interactive assessment content formats supported (e.g., gamification, draggable text/objects, drawing, matching).
· Types of supplemental test materials supported (e.g., simulated emails, memos, photos, videos with sound, documents).
Provide samples/illustrative mock-ups for:
· Proctor Manual
· Applicant instructions, if available
· Reports to be generated under this contract, the requirements for which are listed in the solicitation requirements (SOW).
· Proctor Training Materials
Factor 1
| Tab 3 : Element 3 Testing Site Network |
| Provide a detailed executive summary of the testing site network to include: |
· The number and location of test centers within the United States and internationally
· The ability or plan to add new tests centers
· The ability to set up mobile test sites where brick and mortar test sites do not exist
· A summary of test centers that offer test sessions outside of normal business hours
· Test site equipment standards (e.g., internet connectivity/bandwidth, hardware, and equipment standards, and explanations of how different sites may vary. The descriptions shall include the equipment available at static testing sites and any differences in equipment between sites.)
Provide samples/illustrative mock-ups for:
· Configuration of static test centers; address how the set-up and configuration requirements for test centers prevents cheating (e.g., space between testing stations, privacy screens, etc.)
· Configuration of mobile test centers; address how the set-up and configuration requirements for test centers prevents cheating (e.g., space between testing stations, privacy screens, etc.)
· Testing center protocols (e.g., procedures for documenting administration protocol, unusual incident reporting procedures, emergency evacuations, power failures, computer failures, internet failures)
· Testing center protocols (e.g., procedures for suspected and confirmed cheating and ADA accommodations)
Factor 1
| Tab 4: Element 4: Test Administration Methods |
| Provide a detailed executive summary of test administration methods to include: |
· Types of virtual proctoring offered (e.g., remote, forensic)
· The technology on which unproctored assessments can be completed (e.g., mobile phone, PC)
· Methods used to verify applicant identity
· Methods used to ensure test security using remote proctored administration methods.
Provide samples/illustrative mock-ups for:
· Remote test proctoring protocols (e.g., procedures for documenting administration protocol, unusual incident reporting procedures, power failures, computer failures, and internet failures, procedures for suspected and confirmed cheating and ADA accommodations)
· Proctor Training Plan detailing how proctors will receive initial and yearly maintenance training on protocols for greeting applicants, positively identifying applicants, securing items prohibited from the test room, performing monitoring duties during testing, test administration, unusual circumstances, and privacy/information security
Factor 1
| Tab 5: Element 5: Web services and security, compliance, and privacy requirements. |
| Provide a detailed executive summary of the process used for web services and security, compliance, and privacy requirements, to include: |
· Demonstrating ability to transfer data to CBP and receive data from CBP that conforms to the following technical requirements:
· Data must be made available via secure web services
· Provide and authentication mechanism that ensures only authorized requests are processed
· Web service should be available for use 24 hours a day, seven days a week
· The ability to ensure that standardized testing environments meet industry standards for high-volume, litigious (high-stakes) testing environments across test sites.
· Approach to safeguarding sensitive information
· Demonstrate ability to establish a web services system to transfer data to CBP and from CBP.
Factor 2 Manage-ment Approach
| Tab 6: Element 1 Staffing/Key Personnel |
| Provide a detailed description of the personnel resources that will be employed for this project and demonstrate how these resources will meet solicitation requirements. |
· Demonstrate key personnel’s capability to meet the Government's requirements by providing position descriptions and qualifications for categories of personnel intended for this project or by inclusion of sample resumes.
Provide samples/illustrative mock-ups for:
· Resumes for all individuals identified as "key personnel" should be included and contain information on education, background, recent work experience, and specific scientific or technical accomplishments.
· Resumes should be no longer than 2 pages each.
Factor 2 Manage-ment Approach
| Tab 7: Element 2: Transition Plan |
| The Contractor shall provide a transition-in and transition-out plan by providing any required transition planning or program execution associated with the transition in and out timeline to include: |
· Willingness and agreement to transfer data, documents and records
· Coordination with Government representatives
· Review, evaluation and transition of current services
· Transition of historic data
· Transfer of all necessary business and/or technical documentation
· Transfer of Government-Furnished Information (GFI)
Provide samples/illustrative mock-ups for:
· Transition Plan documentation, should include a schedule, with appropriate milestone charts to identify timelines and critical path items involved.
· Web Services Plan detailing how Contractor will establish a web services system for electronic data transfers for data provided to CBP and data provided by CBP
Factor 3 Past Perform-ance
Tab 8 Element 1 Quality of Product of Service
Factor 3 Past Perform-ance
Tab 9 Element 2 Timeliness of Performance
Factor 3 Past Perform-ance
Tab 10 Element 3 Problem Resolution
Factor 3 Past Perform-ance
Tab 11 Element 4 Cost Control
Factor 3 Past Perform-ance
Tab 12 Element 5 Business Relations
Factor 3 Past Perform-ance
Tab 13 Element 6 Customer Service
File details come from the government source that posted it. Updated .