Amendment_A0001_Questions and Answers.docx

DOCX document 52 KB Posted

Attached to
Integrated Logistics Support (ILS) Services Federal contract opportunity
Solicitation number
70B04C21R00000005
Issued by
Department of Homeland Security Customs and Border Protection

About this file

This document outlines requirements for integrated logistics support services. The contractor shall provide maintenance, repair, and logistics services for non-intrusive inspection equipment, radiation detection equipment, laboratory and scientific equipment, remote video surveillance systems, unattended ground sensors, and agent support equipment owned by Customs and Border Protection. Key personnel, quality control plans, and transition plans will be evaluated. Offerors must provide past performance references. Pricing shall be submitted using the attached templates and may include separate line items for travel expenses. The work will be performed at locations in Lorton, Virginia and Albuquerque, New Mexico.

View the file

Other files for this federal contract opportunity

Other files attached to Integrated Logistics Support (ILS) Services, newest first.
File Type Posted
Amendment_A0004_Synopsis of Revised Documents.docx DOCX document
Amendment_A0004_Questions and Answers.docx DOCX document
Amendment_A0004_RFP No. 70B04C21R00000005 - revised.pdf PDF
Amendment_A0004_Attachment 2 Solicitation Pricing Tables.xlsx XLSX spreadsheet
Amendment_A0003_Questions and Answers.docx DOCX document
Amendment_A0003_Attachment 2 Solicitation Pricing Tables.xlsx XLSX spreadsheet
Amendment_A0002_Attachment 1 Statement of Work.docx DOCX document
Amendment_A0002_Questions and Answers.docx DOCX document
Amendment_A0002_Attachment 2 Solicitation Pricing Tables.xlsx XLSX spreadsheet
Amendment_A0002_Attachment 3 Past Performance Questionnaire.docx DOCX document
Amendment_A0002_Synopsis of Revised Documents.docx DOCX document
Amendment_A0002_RFP No. 70B04C21R00000005 - revised.pdf PDF
Amendment_A0001_RFP No. 70B04C21R00000005 with track changes.docx DOCX document
Amendment_A0001_Attachment 4 Labor Category Descriptions.docx DOCX document
Amendment_A0001_Attachment 1 Statement of Work.docx DOCX document
Amendment_A0001_Attachment 1 Statement of Work - track changes.docx DOCX document
Amendment_A0001_RFP No. 70B04C21R00000005 - revised.pdf PDF
Amendment_A0001_Attachment 13 OEM List.xlsx XLSX spreadsheet
Amendment_A0001_Attachment 2 Solicitation Pricing Tables.xlsx XLSX spreadsheet
Amendment_A0001_Cover Letter.docx DOCX document
RFP No. 70B04C21R00000005.pdf PDF
Attachment 1 Statement of Work.docx DOCX document
Attachment 2 Solicitation Pricing Tables.xlsx XLSX spreadsheet
Attachment 10 Albuquerque DX and Critical Repair Part Min-Max Levels.docx DOCX document
Attachment 11 Wage Determination No 2015-4281 - Rev 16 (LRN).pdf PDF
Attachment 5 ILS Equipment List.xlsx XLSX spreadsheet
Attachment 6 Additional Equipment Listing.docx DOCX document
Attachment 7 Locations of Equipment.docx DOCX document
Attachment 8 Operations Center Call Volume.docx DOCX document
Cover Letter.docx DOCX document
Attachment 3 Past Performance Questionnaire.docx DOCX document
Attachment 4 Labor Category Descriptions.docx DOCX document
Attachment 9 ILD Albuquerque Throughput.docx DOCX document
Attachment 12 Wage Determination No 2015-5443 - Rev 10 (ABQ).pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Reference
Question
Answer
1
SOW Section 13.5 (Key Personnel), Paragraph(s) 1&2, Page(s) 38.

RFP General Proposal Instructions, Source Selection Documentation, Factor 2, Sub-factor 2 (Key Personnel), Page(s) 61 Will the Government please provide a 4-week extension to allow adequate time to compile and price the requested Key Personnel data?

Will the Government consider requiring only the 2 Program Manager Positions as Key Personnel similar to the previous solicitation number HSBP1012R0071?

We are extending until January 11, 2021.

SOW and RFP are revised to require 4 Key Personnel as follows:

· Program Manager (1) – Lorton

· Operations Manager (1) – Lorton

· Maintenance Manager (2) – Lorton & ABQ

2
RFP section III.18, [Instructions to Offerors], Source Selection Documentation, Factor 2 Management Approach, Sub Factor 2, Key Personnel (10 FTEs; 1 On Demand), Page 63.
For the resumes of key personnel submitted for this solicitation, will relevant successful past experience on programs where an individual’s duties were equivalent in size/scope/complexity be evaluated as equal, whether that experience is CBP or non-CBP experience? e.g. Will candidates who meet the labor category description for their role, and have successfully performed the duties noted in the SOW for that role, be scored equivalently whether their past experience is DHS CBP or DoD US Army?
Past performance is past performance, even with a State agency so long as the personnel submission have the relevant experience as required in the SOW. The SOW did not state that the experience had to be within CBP. That would not fair to vendors that have not worked at CBP.
3
RFP General Proposal Instructions, Volume I, Paragraph 1&2, Page(s) 59
The General Proposal instructions indicate that Volume 1 is to comply with FAR 52.212-1(b). The specific items listed in this section of the proposal instructions does not map to the specific items listed in FAR 52.212-1(b).
FAR 52.212-1(b) – states:

Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show—

(1) The solicitation number;

(2) The time specified in the solicitation for receipt of offers;

(3) The name, address, and telephone number of the offeror;

(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;

(5) Terms of any express warranty;

(6) Price and any discount terms;

(7) "Remit to" address, if different than mailing address;

(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212- 3(b) for those representations and certifications that the offeror shall complete electronically);

(9) Acknowledgment of Solicitation Amendments;

(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and

RFP Instructions are in addition to the minimum requirements in 52.212-1(b).

4
RFP General Proposal Instructions, Volume I, Paragraph 1&2, Page(s) 59
Are offerors required to include the specific items listed in the General Proposal Instructions in Volume 1 or are offerors instead required to include the items listed in FAR 52.212-1(b) in Volume 1?
Please follow the agency’s instructions in RFP General Proposal Instructions and FAR 52.212-1(b).
5
Reference: RFP General Proposal Instructions, Volume II (Past Performance), Paragraph 1, Page(s) 60

Reference: RFP General Proposal Instructions, Volumes Table, Row 6, Page(s) 62 Reference RFP General Proposal Instructions, Factor 3 (Past Performance), Paragraph 1&2, Pages(s) 63 There is a discrepancy in the instructions and evaluation factors related to past performance submittals. The instructions on page 60 state that the Past Performance volume shall not exceed 10 pages (2 pages per reference) – implying that up to 5 past performance examples can be submitted.

The volume table on page 62 cites a Volume II, Tab I page limit of 6 pages (2 pages per reference).

The evaluation criteria on page 63 state that offerors are to provide a maximum of 3 references of past performance.

Question: What is the maximum number for past performance examples that offerors are allowed to submit?

What is the maximum page count allowed for Volume II, Tab I (Past Performance)?

RFP is revised to clarify 6 pages and 2 pages per reference for Volume II, Tab I.

Offerors are to provide a maximum of 3 references of past performance.

Offerors are to provide a maximum of 3 references of past performance.

RFP is revised to clarify 6 pages and 2 pages per reference for Volume II, Tab I.

6
Reference: SOW Section 9 (Place of Performance), Paragraph 2 (last bullet), Page(s) 35
The SOW references a potential for ILSS support to be provided in OCONUS locations. Section 9 of the SOW (last bullet) states “Other Government and OEM facilities.”
Some of these locations may only be revealed to the awardee because they may be secured sites. If they are sites for On-Demand, the awardee will be given the location and the ability to submit a proposal prior to the processing of the modification.
Will the government please provide historical data on the number and typical duration of trips/travel required to support OCONUS travel to perform ILSS services at CBP or OEM locations?
All the locations that can be identified have been stated in the SOW.
8
Reference: SOW Section 4.1.1.4 (Administrative Support), Paragraph 1, Page(s) 7

Reference: Attachment 2, Pricing Tables, Lorton Support Tab, Cell D5 The SOW states that the contractor shall provide 5 Administrative Assistants to be co-located with the government in the ILD Lorton facility.

Please confirm the number of Administrative Assistants that offerors are to provide at the ILD Lorton facility and update the SOW and/or Attachment 2 Solicitation Pricing Table accordingly.

The SOW states “5 Support Personnel”. However, the labor categories listed are historical staffing. The offeror is allowed to propose their own labor categories and hours to satisfy the requirement.

The pricing sheet is revised on the “Lorton Support” Tab to merge the “Administrative Support” Cell to encompass the Administrative Assistants and Procurement Administrator. The pricing sheet is representative of historical staffing. The offeror is allowed to propose their own labor categories and hours to satisfy the requirement.

9
Reference: General Proposal Instructions, Volume III (Price), Paragraphs 3-6, Page(s) 60-61

Reference: Attachment 2, Pricing Tables, CLINs 1&2, Lorton Support Tab and ABQ Support Tab, Transition Tab and On Demand Tab.

Should labor rates for personnel in New Mexico include the New Mexico Gross Receipts tax or is the tax to be stated and invoiced separately.
Labor rates should be loaded labor rates.
Should labor rates be listed as straight time / regular time and not include overtime, or should all rates priced include any overtime incurred?
Labor rates should be regular time with no overtime, but should be fully loaded.
11
Reference: General Proposal Instructions, Volumes Table, Page(s) 62
Volume III Tab 2 Price Proposal states the format is to be submitted in Excel. Does the government not allow for submittal of a Cost Narrative (word document) to provide further details and methodologies to go along with the Attachment 2, Pricing Tables?
Attachment 2 Pricing Template must be submitted, plus the narrative. The price narrative can be submitted in word excel.
12
Reference: General Proposal Instructions, Volume III (Price), Paragraphs 3-6, Page(s) 60-61

Reference: Attachment 2, Pricing Tables, CLINs 1&2, Lorton Support Tab and ABQ Support Tab, Transition Tab and On Demand Tab.

Does the government have a mapping of the RFP labor categories into the SCA WD Categories?

If, so will the Government provide a mapping of the RFP labor categories into the SCA WD?

See Attachment 4 Labor Category Descriptions which is revised to include SCA WD Equivalents.

13
Reference: SOW, Paragraph 13.5 (PM Education Requirement), Page(s) 38
Education requirement for the PM states minimum of 8 years of experience, PMP certification and a Bachelor's Degree in Logistic Management or a related field.

With the "Executive Order on Modernizing and Reforming the Assessment and Hiring of Federal Job Candidates" will the Government implement merit-based considerations versus educational requirements?

The personnel listed in this requirement are employees of the vendor, not the Government. This education requirement is specific for the PM for Lorton.

14
Reference: Volume I, Paragraph 3, Page(s) 59-60

Reference: Volume I, Paragraph 5, Page(s) 60 The instructions indicate that there should be a Glossary of Abbreviations and Acronyms is within the Executive Summary and also again under Tab 2.

Should offerors include a separate Glossary in both places? If so, is the Glossary under Tab 2 for Factor 1 only? Or should offeror include a single Glossary within the Executive Summary for the entire volume?

Offerors should include the Glossary where it is applicable.

See page 60 and follow the Glossary instructions.

The Government is not familiar with the offeror’s acronyms, so they need to be included.

15
Reference: Volume I, Paragraph 3, Page(s) 59-60

Reference: Volume I, Paragraph 5, Page(s) 60 The instructions indicate that there should be a Glossary of Abbreviations and Acronyms is within the Executive Summary and also again under Tab 2.

Should offerors include a separate Glossary in both places? If so, is the Glossary under Tab 2 for Factor 1 only? Or should offeror include a single Glossary within the Executive Summary for the entire volume? Or can offerors put a single overall Glossary for each of Volume I following the Table of Contents for that volume?

See response to question # 22.

16
Reference: Volume I, Paragraph 2, Page(s) 59
The instructions for the contents of the Cover Letter indicate that) Offerors are to include both the “Identify of the Prime Offeror or Team (if team, explain the relationship)” as well as an “Introduction of Prime Offer or Team (if applicable)”.

How are these items different from one another?

RFP has been revised to remove the duplicate requirement. See page 59.

17
Reference: Volume I, Paragraph 3, Page(s) 59
The instructions state, “An Executive Summary shall be provided to introduce the prime Offeror or team (if applicable) and provide background on the Offeror/team and proposal approach.” The identification of the Prime Offeror or team (if appropriate) is also required twice in the Cover Letter.

Question(s):

a) What is the difference between each requirement to identify the Offeror and/or team?

b) Can the Government clarify what is meant by “proposal approach”?

The Cover Letter should include an introduction of the Prime Offeror or Team. The duplicate bullet has been removed from the Cover Letter requirement on the RFP, page 59.

The Executive Summary should explain the relationship. See revised RFP.

18
Reference: Volume I, Paragraph 3, Page(s) 60

Reference: Section III Solicitation Provisions, Paragraphs III.1 through III.17, Page(s) 41-58 The instructions indicate that “The Offeror shall address and include each certification and representation identified within the solicitation.”

Can the Government confirm that offerors are include only the fill-in portions of all the provisions, per this instruction in Paragraph III.1 of Section III Solicitation Provisions, in addition to the Representations and Certifications printout from SAM.gov?

The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer..

19
Reference: Volume I, Paragraph 4, Page(s) 60
The instructions indicate that Tab 2 Technical Approach must include the same information already included on the Cover Page.

Question: Can the Government clarify if Offerors are to include a separate “Cover Page” for Tab 2? If we are to include a separate Cover Page for Tab 2, does this apply to Tab 3 also?

The instructions state “A cover page shall be included with each volume, clearly marked with the following information”.

20
Reference: Source Selection Documentation, Volumes (Factor 2 Management Approach), Paragraph 4, Page(s) 63

Reference: SOW, Paragraph 13.5, Page(s) 63

Reference: Pricing Tables, Lorton Support Tab Sub-factor 2 indicates that there are seven (7) Lorton key personnel and three (3) Albuquerque key personnel. However, SOW section 13.5 indicates there are six (6) Lorton key personnel and five (5) Albuquerque key personnel. The position is question as to its appropriate location appears to be the Warehouse Supervisor which is listed as NII (Lorton) in SOW section 13.6 and in the Pricing Tables.

Question(s):

a) Can the Government clarify the numbers of key personnel at each location, as well as the position titles within the Source Selection section of the solicitation?

b) Can the Government clarify the key personnel positions and their associated locations in the SOW sections 13.5 and 13.6, as well as the Pricing Tables?

The SOW is updated to reflect the Warehouse Supervisor as a Lorton position.

SOW and RFP are revised to require 4 Key Personnel as follows:

· Program Manager (1) – Lorton

21
Reference: SOW Paragraph 4.1.1.2, Page 6
The SOW states, “The Contractor shall provide a financial tracking and payment system that provides enough flexibility and information at the fund level for reporting the financial requirements of the program, to include the timely tracking of payments to vendors and existing commitments.”

Question(s):

a) Does the Offeror’s system need to interact with any Government systems? If so, which one(s) and in what capacity?

b) Will the incumbent contractor be responsible to provide accuracy data and status of existing commitments during the transition period?

c) What is an example of an acceptable financial tracking and payment system?

Contractor uses their own data base to capture their finances. Contractor uses the Government web-based system called Invoice Processing Platform (IPP) to transmit government invoices for processing.

Financial tracking is a monthly deliverable. This is provided to the Government COR and CO by the contractor via email on an excel spreadsheet. The contractor also meets with the COR to ensure financials aligns correctly with SAP.

22
Reference: SOW Paragraph 4.1.2.4, Page 9

Reference: SOW Paragraph 4.2.1, Page 14 Section 4.1.2.4 (ILD Lorton) references the use of Remedy and MAXIMO. Section 4.2.1 (ILD Albuquerque) only references the use of MAXIMO.

Is Remedy and MAXIMO utilized at both ILD Lorton and ILD Albuquerque? Or, does ILD Albuquerque only use MAXIMO?

These systems are used at both locations, Lorton and Albuquerque.

23
Reference: RFP Section “CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS”, Paragraph(s): Entire Page, Page(s): 40.
Will the Government please confirm that Attachment 6: Locations of Equipment in this section should read as Attachment 7?
Yes, the RFP and Cover Letter Attachment References are revised to read:

Attachment 7 Locations of Equipment

24
Reference: RFP Section “CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS”, Paragraph(s): Entire Page, Page(s): 40.
Will the Government please confirm that Attachment 7: Additional Equipment Listing in this section should read as Attachment 6?
Yes, the RFP and Cover Letter Attachment References are revised to read:

Attachment 6 Additional Equipment Listing

25
Reference: RFP Section “Attachment 1 Statement of Work”, Paragraph(s): 4.2.11, 4.2.12, 4.3.1.4, 4.3.3, Page(s): 18, 20, 21.
Will the Government please clarify what “Reserved” means for paragraphs 4.2.11, 4.2.12, 4.3.1.4, 4.3.3 of the SOW?
Reserved sections are removed from the SOW.
26
Reference: RFP Section III.18, General Proposal Instructions, Tab 1 Cover Letter, Paragraph(s): Volume I, Page(s): 59
The Cover Letter has to contain the information presented in the six bullets listed. However, bullet three and bullet six ask for repetitive information (i.e., identification/introduction of prime Offeror or team and explain relationship. Can the response to bullet three and six be consolidated to one response given the Cover Letter is limited to 2 pages?
This section of the RFP has been revised to clarify.
27
Reference: RFP Section III.18, General Proposal Instructions, Volume I, Paragraph(s): Tab 1 Executive Summary, Page(s): 59
The Executive Summary requests an introduction of the prime Offeror or team. This information is also requested in the Cover Letter, which is within the same Volume and Tab. Can the offeror reference Tab 1 Cover Letter for the introduction of the team and not repeat the same information?
This section of the RFP has been revised to clarify.
28
Reference: RFP Section III.18, General Proposal Instructions, Volume I, Paragraph(s): Tab 1 Executive Summary, Page(s): 59-60
Under Tab 1 Executive Summary, there are five bullets, which include the Executive Summary, Master Table of Contents, Glossary of Abbreviations and Acronyms, statement for extent of agreement with all terms, conditions, and provisions, and Representations and Certifications. Are these items to be presented as part of the first bullet, Executive Summary, or be provided within Volume I, Tab 1, after Executive Summary?
This shall be included in the submission for Volume 1 Tab 1 – Executive Summary.
29
Reference: RFP Section III.18, General Proposal Instructions, Volume I, Paragraph(s): Tab 1 Executive Summary, Page(s): 60
Under Tab 1 Executive Summary, bullet three requests a Glossary of Abbreviations and Acronyms. Should this be a Master Glossary of Abbreviations and Acronyms of the entire proposal (similar to Master Table of Contents) or just representative of Volume I?
On page 59 of the RFP, it states “Each volume shall contain a glossary of all abbreviations and acronyms used, with an explanation of each. Glossaries do not count against the page limitations for their respective volumes”.
30
Reference: RFP Section III.18, General Proposal Instructions, Volume I, Paragraph(s): Tab 2 Technical Approach, Page(s): 60
Tab 2 Technical Approach request the following in bullet form.

• Solicitation Identification;

• Title of Proposal;

• Identity of prime Offeror or team (if team, explain the relationship);

• Any proprietary data disclosure statement, if applicable.

• Glossary of Abbreviations and Acronyms In accordance with instructions, these items are presented in Volume I, Tab 1, Cover Letter/Executive Summary. Given the 25 page limit for Volume I, Tab 2, Technical Approach, can the Offeror refer back to Tab 1 in their response for this information rather than repeat it in their Technical Approach tab?

No, please follow the instructions in the RFP.

31
Reference: RFP Section III.18, General Proposal Instructions, Volume I, Paragraph(s): Tab 2 Technical Approach and Tab 3 Management Approach, Page(s): 62-63
Factor 1 – Technical Approach, Sub-factor 2 – Quality Control Plan (QCP) and Factor 2 – Management Approach, Sub-factor 3 – Incoming and Outgoing Transition Plan. Given the 25 page limit for Technical Approach and 15 page limit for Management Approach, can the QCP and Transition Plan be presented as Attachments to Factor 1 and Factor 2 respectively and be excluded from the page count?
The QCP can be presented as an attachment and excluded from the total page count.

The Transition Plan must be included in the total page count.

32
Reference: RFP Section III.18, General Proposal Instructions, Volume II, Paragraph(s): Tab 1 Past Performance, Page(s): 60, 62
RFP states “Volume II – Tab 1 – shall not exceed 10 pages (2 pages per reference).” However, on Page 62, under Volumes, the table states “2 pages per reference for a total of 6 pages.” Can the government please clarify whether the page limit is 10 pages or 6 pages?
This has been corrected in the RFP to specify 2 pages per reference for a total of 6 pages.
33
Reference: RFP Section III.18, General Proposal Instructions, Volume II, Paragraph(s): Factor 3 – Past Performance, 3rd paragraph, Page(s): 63
RFP states “Each description shall be numbered (1 through 5) ...”. In the paragraph above, the RFP states “The Offeror shall describe no more than three (3) past projects similar in scope, size, complexity and magnitude to the work described in the Statement of Work.” Can the government please confirm the offeror is to present no more than three (3) past projects?
This has been corrected to state “1 through 3”
32
Reference: RFP Section III.18, General Proposal Instructions, Volume III, Paragraph(s): Factor 4 – Price, Page(s): 65
Can the offeror provide a price narrative within Volume III, Tab 2 as a PDF, to support their completed Attachment 2 Solicitation Pricing Tables?
Attachment 2 Solicitation Pricing Table must be completed. Any additional information may be submitted in .pdf, excel or word.
35
Reference: RFP SF1449, Paragraph(s): Block 8, Page(s): 1
Will the government please give a three (3) week extension for proposal submission to January 18, 2021?
The requirement will be extended until January 11, 2021.
36
Reference: N/A, Paragraph(s): N/A, Page(s): N/A
Given the revocation of Executive Order 13495 on 10/31/19 removing the requirement for non-displacement of qualified workers under service contracts, will the government please consider adding FAR 52.207-3 Right of First Refusal of Employment to the T&C of the contract?
Yes, this will be added.
Reference: RFP Attachment 2, Solicitation Pricing Tables, Paragraph: N/A, Page: N/A
Please confirm that FFP and T&M labor and parts and supplies associated with the Albuquerque place of performance should include New Mexico Gross Receipts Tax, which is a mandatory business tax allowable under FAR 52.229-10.
Confirm.
38
Lorton, General Question
Will all current SOP and Work instruction be provided to contractor as GFI?
All SOPs and Instruction’s that are government owned will be provided as GFI.
39
RFP Section II.28, 52.219-33 NON-MANUFACTURER RULE (DEVIATION 19-01) (AUG 2020), Page 16
In accordance with FAR 19.507H the contracting officer shall insert this clause in solicitations and contracts when the item being acquired has been assigned a manufacturing or supply NAICS code. Since the NAICS code for this RFP is 811219 is a services NAICS code, this FAR clause is not applicable and respectfully request it be removed from the RFP.
The clauses are inserted in the solicitation just in case. So if it is not applicable, just ignore it.
40
RFP Section I.2 CONTRACT LINE ITEMS, Line Item 1, Page 3
Is it the Government’s intention to continue with a time and materials contracts in Option Year 1 if all FTEs are not onboarded? How does the Government consider onboarded, if the Offeror was fully staffed but lost some FTEs during the Base Year.
Please refer to section L.
41
SOW Section 3 Applicable Documents, Entire Section, Page 5
Which sections of the stated bullet documents are applicable to this contract? At present you have indicated the entire documents are applicable and this is outside the norm for a solicitation.

With respect to 508 compliance, does CBP have facility access to wheelchairs, computerized systems for the blind, etc.?

Please provide links to access all documents in this section as the majority cannot be found on the web?

This is the norm for CBP contracts. The offeror will have access to all documents upon award.

CBP follows the American Disabilities Act and does not discriminate against any wheelchair or blind personnel.

The contractor awardee will have access to all documents upon award.

41
SOW Section 4.1.1.2 ILD Lorton Support, Financial Tracking, Paragraph 1 & bullet items, Page 6
Is this function to be handled through contractor data base, and/or spreadsheets and/or USG Data base?

Is the contractor to provide financial tracking and payments to those orders and services provided by the contractor and CBP directly sourced contracts?

Contractor uses their own data base to capture their finances. Contractor uses the Government web-based system called Invoice Processing Platform (IPP) to transmit government invoices for processing.

Financial tracking is a monthly deliverable. This is provided to the Government COR and CO by the contractor via email on an excel spreadsheet. The contractor also meets with the COR to ensure financials aligns correctly with SAP.

43
SOW Section 4.1.1.4, Administrative Support, 1 & bullet items, Pages 7 & 8
The administrative assistant LCAT and Procurement Administrator 1 LCATs do not align to the requirements section of 4.1.1.4 Administrative Support.

Further if this is a SCA category, what is the category code corresponding to this section?

In addition, the job category listings do not account for cleared personnel in the SCA groupings.

How is CBP seeking to reconcile all of these anomalies?

This is a CBP requirement. Please refer to what is being required in the SOW.

Administrative Assistant – SCA Equivalent: 01020 – Administrative Assistant Procurement Administrator - No SCA Equivalent (Professional)

All contractor employees must be CBP cleared.

The LCATs listed are historical LCATs provided for reference. Vendors are allowed to propose their own labor categories to satisfy the requirement.

44
SOW Section 4.1.2.1 ILD Maintenance Dispatch Center, Paragraph 1, Page 8
If this is a SCA category, what is the category code corresponding to this section?

In addition, the job category listings do not account for cleared personnel in the SCA groupings. How is CBP seeking to reconcile this anomaly?

Since we have to staff to a FTE level 24x7x365 how will CBP ILD account for Holiday schedules into the total FTE hours?

Are there any shift hour changes during holidays?

Maintenance Dispatch Coordinators – SCA Equivalent: 01320 – Service Order Dispatcher

All contractor employees must be CBP cleared.

The number of hours stated in the pricing template accounts for the FTE hours. It up to the vendor to schedule their employees to make sure there is 24x7x365 coverage.

The number of hours stated in the pricing template accounts for the FTE hours. It up to the vendor to schedule their employees to make sure there is 24x7x365 coverage.

45
SOW Section 4.1.2.1 ILD Maintenance Dispatch Center, Paragraphs 2 & 3, Page 8
Of the 12 personnel described on page 39, Section 13.6 O&M table, how are they divided between Tier I/II and then Tier III for the NROC

The LCAT qualifications descriptions do not delineate by Tier I/II & Tier III. Please advise the skill set qualification for Tier I/II & III.

If this is a SCA category, what is the category code corresponding to this section?

In addition, the job category listings do not account for cleared personnel in the SCA groupings. How is CBP seeking to reconcile this anomaly?

12 MDC and 2 NROC personnel. MDC Tier I / II: No division between I & II: 12 personnel.

Tier I is the initial contact and taking of the call Tier II is the troubleshooting over the phone and contacting vendors.

Maintenance Dispatch Coordinators – SCA Equivalent: 01320 – Service Order Dispatcher

All contractor employees must be CBP cleared.

46
SOW Section 4.1.2.3, Paragraphs 1 & 2, Page 9
Does this section apply to equipment under the direct responsibility of the contractor and OEM direct sourced contracts?

Are the performance standards aligned in all contracts (OEM and direct support by the awardee contractor)?

This applies to all contracts. Performance standards are explicitly called out in the contracts.

47
SOW Section 4.1.2.4, Paragraph 1, Page 9
Historically, how often does this transpire, what is the down time and estimated work load to transfer information from Remedy to Maximo?

In addition, are there instances when the situations are reversed and if so how do you record calls for RPM & ABQ calls when Remedy is down?

Again, what is the estimated work load to transfer information back into Remedy?

There are several redundancies in place and this has not occurred over the last 12+ months.

There has not been an instance where the situations were reversed.

There is no additional workload since the work orders are already documented in both databases.

48
SOW Section 4.1.3.4 RPM Calibration, Paragraphs 1 & 2, Page 10
Based on the content of both paragraphs this would seem to be a function of the directed source Maintenance Provider to CBP. Is the Directed Source responsible to provide the schedule to the ILD contractor and the contractor in turn provide to the COR?

If not what is the periodicity of the RPM calibration? We assume yearly; however, it is our understanding certain maintenance services require calibration. Is this still the case and how often does this transpire and by whom?

Who is responsible to tender the source for calibration to the RPM site and is it tied to a directed source contract?

Yes, the Directed Source is responsible to provide the schedule to the ILD contractor and the contractor in turn provide to the COR Monthly.

Calibrations for RPM are conducted yearly. However, there are repairs that require additional calibrations to the yearly ones.

When a repair requires calibration, ILD Contractors coordinate the calibration with the vendor.

Contactor sends a Work Order to Direct Source to complete the calibration.

49
SOW Section 4.1.3.9.1 Asset management support, Bullets e & f, Page 12
Reference is made to 2 material expeditors in these bullets; however, this does not align with section 13.6 ILS FTE table. Please advise if these are in addition to what is shown on page 39?
The material expeditors handle Packaging, Handling, Storage and Transportation (PHS&T) Functions within the warehouse facility. Section 13.6 should reference these additions with 3760 hours of effort required annually to satisfy the requirement.
50
SOW Section 4.1.4 PHS&T Functions, Entire Section, Page 12
In concert with 4.1.3.9.1 where do the material expeditors play in this scenario?

Does the contractor have to certify the Fork Lift operators or is this available through CBP. Assume if the contractor this is chargeable back to the contract. Same for Hazardous Materials Training?

Does CBP have any other equipment, machinery or vehicles at Lorton which require service and or support not mentioned herein?

Does CBP have a digital scale and if so is this maintained and certified by CBP or is it the contractor’s responsibility?

Is all PHS&T functions performed for NII, HHT and RDT out of the Lorton facility or does CBP have satellite or forward stock locations under the Lorton banner?

The material expeditors handle Packaging, Handling, Storage and Transportation (PHS&T) Functions within the warehouse facility.

Forklift Certification. The Government has historically provided the 'Fork Lift Certifications' to the Contractor staff at no cost to the Contractor. We do not anticipate the contractor, at this time, having to pay to certify their staff. It is a one-time certification.

Digital Scale. CBP utilizes the FedEx and UPS provided scale(s) for shipping with their applications. The contractor is not expected to pay for any calibrations on those provided scales. The contractor is only ensure that they are within calibration by FedEx and UPS.

PHS&T Functions. Yes, all PHS&T functions for hand-held NII equipment and RDE are conducted out of Lorton.

Machinery and Vehicles. The contractor, at this current time, is not expected to maintain any other Government machinery or vehicles not identified in this SOW.

51
SOW Section 4.1.5.1 Handheld NII and Radiation Detection Equipment (RDE) Repair Functions, Entire Section, Pages 12 & 13
We assume RDE also includes the RIIDs; however, they are not included in this section for Corrective Maintenance or Calibration. Are these handled through an outside directed source contract(s) for both repair and calibration? What are the requirements if any for calibration certificate, storage of documentation and the calibration coordination effort?
RDE are repaired and calibrated using an outside source.

Certificates are stored on the CBP shared Drive.

52
SOW Section 4.1.5.1 Survey Meter Calibration Service Functions, Entire section, Page 13
What are the requirements if any for calibration certificate, storage of documentation, and the calibration coordination effort?
Certificates are stored on the CBP shared Drive.
53
General
Does CBP Lorton maintain a DX pool for the hand held equipment and if so what are the requirements?
Any DX pool equipment maintained at Lorton will be managed by the Government with only minor assistance from the contractor to perform support as already identified within other functions listed within the SOW. e.g. Shipping of equipment, repair if defective, etc.
In 2014 a visual tour was afforded the bidders. Due to COVID 19 can a virtual tour be conducted on this facility with a narrative of the function of said facility?
CBP will not be conducting a virtual tour of the facility.
55
ABQ, General
Will all current SOP and Work instruction be provided to contractor as GFI?
All SOPs and Instruction’s that are government owned will be provided as GFI.
56
SOW Section 4.2.1 ABQ Supply Support, Paragraph 1, Page 14
This contradicts 4.1.2.4 whereby the document indicates “Contractor shall only create and update work tickets in the CBP-approved Remedy database for RPM PRIDE sites and equipment specified in ILD Albuquerque Support.” Please advise which is the DB of record?
The DB of record is Maximo.
57
SOW Section 4.2.2 ASE Repairs, Entire Section, Page 14
What is the protocol if repair services are required by OEM, should we follow section 4.2.8 and if so what are the procedures as this will also inhibit Turn Around Times which do not seem to be included in Table 1 page 32 of the SOW
RMA request is submitted to the OEM for the repair.

Customer wait time will be dependent on the OEM to affect repairs and return the system/unit to an operational status and will not be held against the vendor since it is beyond their control.

58
SOW Section 4.2.3 Surveillance Systems, Entire Section, Page 14
What is the protocol if repair services are required by OEM, should we follow section 4.2.8 and if so what are the procedures as this will also inhibit Turn Around Times which do not seem to be included in Table 1 page 32 of the SOW
RMA request is submitted to the OEM for the repair.

Customer wait time will be dependent on the OEM to affect repairs and return the system/unit to an operational status and will not be held against the vendor since it is beyond their control.

59
SOW Section 4.2.4 Calibration, Entire Section, Page 15
Attachment 1 is the SOW, please confirm attachment 6 Additional Equipment List is the specific document relational to the calibration services?

What is the protocol and storage of the certification of stated equipment and what is the protocol if the equipment fails calibration?

Yes, Attachment 6 lists the Lab test equip. This is the test equipment that gets tested once a year.

Certificates are stored on the CBP shared Drive.

This can be referenced in the attachment.

60
SOW Section 4.2.7.1, 5th Bullet, Page 16
Is the cost of inventory entered as ordered since there is a Min/Max quantity threshold with a reorder point? In other words is ABQ recording parts as FIFO, creating multiple entries for parts?
No, ABQ is not reordering parts as FIFO creating multiple entries.

For anything that has an expiration date/expected shelf life FIFO is preferred. (Example would be batteries)

61
SOW Section 4.2.7.3, Entire Section, Page 17
Is the IMS a different data base from Maximo and/or Remedy? In other words is this a 3rd database?
The database of record is Maximo.
62
SOW Section 4.2.8, Paragraph 1, Page 17
Please advise the procedures employed under this requirement as it will impact turnaround time.
RMA request is submitted to the OEM for the repair.

Customer wait time will be dependent on the OEM to affect repairs and return the system/unit to an operational status and will not be held against the vendor since it is beyond their control.

63
SOW Section 4.3.1 Preventative Maintenance, Sections 4.3.1.1 through 4.3.1.7, Pages 20 & 21
This section is written as through it is applicable to all NII equipment to be serviced by the contractor. Since CBP has directed sources for maintenance, please advise what equipment this section is geared to support.
PM are done for all NII large scale and LSSD Equipment.
64
SOW Section 4.3.2 Corrective Maintenance, Sections 4.3.2.1 through 4.3.2.3, Page 21
This section is written as through it is applicable to all NII equipment to be serviced by the contractor. Since CBP has directed sources for maintenance, please advise what equipment this section is geared to support.
There are times when partnering will need to occur to service NII equipment.

There are directed sources for some equipment but all equipment as provided in the equipment list is subject to support under this contract.

65
SOW Section 4.4 On Demand Services, Sections 4.4.1 through 4.4.18, Pages 21-27
The requirements in some of the on demand requirements will take personnel whose LCAT qualification exceed those as defined LCAT description.

Is it CBP’s expectation the entire On Demand section is to be worked and facilitated through the existing personnel on the contract or will these be in addition to the daily support provided to CBP ILD?

Please confirm this section pertains to all the equipment in the CBP ILD NII and ABQ facility regardless if the equipment is under a directed source contract with the same On Demand requirement?

The on-demand repairs will be managed based on the contractor’s processes and procedures that they have put in place. We will not direct how this is to be accomplished.

This sections pertains to all equipment under the purview of the Lorton and Albuquerque facilities.

66
SOW Section 4.4.19. (LSS) Equipment Maintenance Services, Sections 4.4.19.1 & 4.4.19.2, Pages 27 & 28
There are 296 line item and 460 pieces of equipment party to the LSS PM and CM activities. Please provide the OEM of these systems and clarify what is meant when no X is in the Column identified as PM/Calibration?
A list of OEMs provided as Attachment 13 to the solicitation.

No ‘X’ indicates not required.

67
SOW Section 4.4.20, Entire Section, Page 28
The LCAT description does not include this function and should be added due to the order of magnitude required to support all the systems under the custody and control of CBP assets.

Can this LCAT be added to the listing in the required attachment? If CBP deems this position as not necessary can you provide some historical knowledge as to what this category reflects as an annual FTE hourly requirement?

This labor category is listed in the table in Section 13.6 as Logistics Analyst II (Configuration Management). The LCAT is also listed in the pricing template on the On-Demand Tab. The labor categories and hours are provided for historical reference. However, the contractor can propose their own labor categories and hours to best meet the requirement.

68
SOW Section 4.4.21 Health Monitoring, Entire Section, Pages 28-29
1. Is the “solution” referring to an application / system? If yes:

2. Is there a current application/system in place

3. Is the government looking for a new application/ system? If yes:

a. Is there a preferred application/system?

b. If a COTS application/system is to be used does it need to reside within the government enterprise architecture?

c. Does it need to go through the ATO process?

Is the government looking for an application/system to be designed and developed?

There is a current solution in place at the NROC. Government is not soliciting a replacement solution but industry innovation is always encouraged.

Application is Government owned and processes an ATO.

69
SOW Section 4.4.21 Health Monitoring, Entire Section, Pages 28-29
1. Is the “solution” referring to a services solution? If yes:

2. Is the government looking to add capabilities to the existing NROC Dashboard?

3. Is the government looking for systems integration with NROC Dashboard, MAXIMO, and Remedy?

Is the Government open to adding additional capabilities through integration and/or development with existing tools such as Service Now, Salesforce, Jira, and/or splunk?

Government is always looking to enhancement of currently used tools as technologies mature.

Current integration with additional databases are not being pursued.

70
SOW Section 4.4.21 Health Monitoring, Entire Section, Pages 28-29
Are the resources to support this effort in addition to the Maintenance Operations Analyst (2 NROC) in LRN?
Health Monitoring is monitored by the MDC and NROC. No additional support is required.
71
SOW Section 4.4.21 Health Monitoring, Entire Section, Pages 28-29
What are the locations for this effort?
Springfield within the Maintenance Data Center and the NROC.
72
SOW Section 13.6 ILS FTE Table, Entire Table of FTE and hours, Page 39
Please advise how the FTE hours were computed since it is our understanding holidays and weekends are supported by the contract? In your response please confirm which LCAT positions are supported on holidays and weekends.
FTE hours were computed based on level of service required to support the requirement under this contract. The FTE hours include holidays. The hours took into consideration holidays and weekends. The hours are based on historical information.

Offerors can propose their own hours. The offeror will have to explain why their proposed hours are different from CBP's.

73
Attachment 4 – Labor Category Description, Entire Attachment, All Labor Categories
Please advise which position are governed by SCA and what are the corresponding Occupational Code?

SCA categories are a guide and do not compensate for a Government clearance. With a CBP fully adjudicated SSBI how is this being compensated through the SCA labor rate?

Attachment 4 Labor Category Descriptions is revised to include the SCA Code and SCA Equivalent labor categories.

74
Attachment 5 – ILS Equipment List, Lorton Support Equipment, Entire Tab
Other managed table indicates “The following list of equipment is provided for trouble call handling, tracking of maintenance, and reporting purposes ONLY”. Based on this statement, please advise if the On Demand, Configuration Management, Logistic, Engineering and Support sections in the SOW are also not applicable?
This doesn’t apply to the support equipment
75
Attachment 5 – ILS Equipment List, LSS Equipment, Entire Tab, List of equipment
Please provide the OEMs for this equipment and match the equipment to the locations where they are in operation.
This has been provide.
76
RFP, General Proposal Instructions, Page 59
Will the government confirm that the cover page does not count against the total page count?
The cover page does not count against the total page count.
77
RFP General Proposal Instructions, Page 59
The RFP sates “A master table of contents for the entire proposal and a table of contents for each volume are required. The master table of contents for the entire proposal should be filed in Volume I and will not count against the total page count.”

Will the government clarify that the table of contents for each volume also does not count against the total page count?

Added statement “Table of contents for each volume will not count against the total page count.

Added statement to Tab 2 – Technical Approach – Not to exceed 25 pages. “The total page count excludes the following: Table of Contents, cover page and glossary of abbreviations and acronyms”.

78
RFP, General Proposal Instructions, Page 60, 62
On Pg 60, the RFP states that “Volume II – Tab 1 – shall not exceed 10 pages (2 pages per reference).” On pg 62, the summary chart says “2 pages per reference for a total of 6 pages.”

Please clarify the number of allowed references and total allowed page limit for Volume II.

This was answered in the spreadsheet. (Duplicate question)

79
SOW Section 4.1.2.1, Paragraph 1, Entire Section, Page 8
Can the government provide any historical data on the number of average calls received in the Maintenance Dispatch center per year?
Please reference attachment provided
80
SOW Section 4.2.1, Paragraph 1, Page 14
Can the government confirm that access will be provided by CBP for utilization of MAXIMO at no expense to the contractor?
Required MAXIMO accesses for all Maintenance Dispatch Center personnel will be provided at no cost to the vendor.
81
SOW Section 9, Place of Performance: Other Government and OEM facilities, Page 35
Can the government provide a list of all other locations in which services may be required that are not defined herein?
Locations of equipment and a listing of equipment with OEMs has been provided.
82
General
What is the current Contract value?
This information is not included in any solicitation.
83
General
Can the Contractor adjust hours that are currently listed in the pricing spreadsheet if a different level of effort is determined to be necessary to support the stated requirement?
Offerors can propose their own hours. The offeror will have to explain why their proposed hours are different from CBP's.
84
RFP Section: II.40 TRAVEL COSTS (AUG 2008), Entire Section, Page 25
Will all travel for required on-site preventive and corrective maintenance be approved for reimbursement at JTR rates?

Also, there is no line item included in the pricing spreadsheet for travel. How will approved travel be funded on the contract?

II.40 TRAVEL COSTS (AUG 2008) Costs for transportation, lodging, meals, and incidental expenses shall be reimbursed in accordance with Federal Acquisition Regulation (FAR) Subsection 31.205-46 and acceptable accounting procedures.

There will be a separate line item provided for travel.

85
Attachment 2 Solicitation Pricing Tables, Parts and Supplies
Will the Contractor be able to invoice materials and other direct costs at cost plus a fee to cover the Contractor’s material handling costs?
This is not a cost plus fixed fee (CPFF) contract. Why is the offeror charging material handling costs?
86
RFP General Proposal Instructions, Page 59
What is the allowable font size for chart labels?
This is left up to the Offeror discretion.
87
RFP Factor 2, Subfactor 2, page 63
Shows 7 Key Personnel for Lorton & the SOW defines 6,

3 Key Personnel for Albuquerque & the SOW defines 4

Can the government resolve this discrepancy?

The SOW is updated to reflect the Warehouse Supervisor as a Lorton position.

SOW and RFP are revised to require 4 Key Personnel as follows:

· Program Manager (1) – Lorton

88
RFP Factor 1, Subfactor 2, Page 61
Is the QCP excluded from the Tab 2 Technical Approach page count?
The QCP is a working document, which may be changed after award. It should not be added to the total count for the Technical Approach.
89
RFP Factor 2, Subfactor 3 - Incoming and Outgoing Transition Plan, Page 61
Is the Transition Plan excluded from the Tab 3 Management Approach page count?
The Transition Plan is not excluded from the total page count.
90
SOW Section 13.5, Page 38
The number of Key Personnel required for the RFP could limit competition for the effort and reduce options for the Government to receive the best value proposal. Would the Government be amenable to reducing the number of Key Personnel to 2 or 3.
SOW and RFP are revised to require 4 Key Personnel as follows:

· Program Manager (1) – Lorton

Question: The FTE hours appears to yield some labor categories that have an 1864 Man Year (Man Year = Productive Hours per Year 2080 hours – Holidays, Vacation, Sick, PTO, etc.) and some have a Man Year of 1880. The categories that have 1880 are Administrative Assistant, Maintenance Dispatch Coordinators, Maintenance Operations Analyst (NROC), Electronics Technician III, Inventory Warehouseman, and Material Expeditor. If you divide those categories by 1880 the result is a whole FTE vs dividing by 1834 yields more than whole FTE. For example, Electronics Technician III has total hours of 22,560. 22,560/1880 = 12.00, however 22,560/1864 = 12.10. Is it the government’s intent to have different Man Year’s for the labor categories? Will the government consider keeping the Man Year consistent for all labor categories and recalculate the hours per labor category?
The labor categories and hours listed are historical labor categories and hours, which are provided for reference. Offerors are allowed to propose their own labor categories and hours to satisfy the requirement.

File details come from the government source that posted it. Updated .