RFQ Questions and Answers
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question #
| Section (RFQ/SOW) |
| Solicitation Page # |
| Solicitation Section Name |
| Question |
| 1. |
| Solicitation Notice |
| N/A |
| Content of Quotes |
| The solicitation notice indicated that quotes should include “a monthly price for services”. Please confirm pricing would be based on an all-inclusive firm fixed pre-pricing model as opposed to being based upon as-needed billable service hour basis. |
CBP Answer: Correct, pricing is based on an all-inclusive firm-fixed-price.
| 1. |
| SOW |
| 1 |
| 1.2 Current and Future Requirements |
| Is there a current or future replacement plan for DSX components with a PACS system from the GSA IDManagment.gov Approved Products List (APL) for PACS systems? |
CBP Answer: No PACS replacement is expected.
| 1. |
| SOW |
| 1 |
| 3.1 Standard Service Requirements |
| Is it expected that all equipment would be provided by the contractor based on an all-inclusive firm fixed pre-pricing basis or would equipment be purchased/billable on an as needed basis? |
CBP Answer: Existing equipment is expected to be repaired/replaced per terms of the contract when found to be defective, under the all-inclusive firm-fixed-price of the order. Any new installations would be handled under a separate procurement action.
| 1. |
| SOW |
| 2 |
| 3.2.2 Critical Emergency Maintenance Service Requirements |
| Is the contractor expected to maintain back stock of equipment to ensure replacement of failed equipment within the 12-hour critical emergency resolution time (or 24-hour standard resolution time)? |
CBP Answer: The contractor is expected to respond in the timeframe required by the SOW. The contactor must determine whether a back stock of equipment is required to meet these timeframes.
| 1. |
| SOW |
| N/A |
| N/A |
| Please indicate if any of the following are requirements for this project: |
· A contractor registered as a HSPD-12 Integrator under SIN 132 62?
· Certified System Engineer ICAM PACS (CSEIP) Trained Personnel
CBP Answer: This is not a requirement.
70B04C18Q00000027 – Questions and Answers