7055A.pdf
PDF 14 KB Posted
- Attached to
- ANNOUNCEMENT: RFQ/P Digested Sludge Overflow Piping and Plug Valve Replacement and Digested Sludge
- Solicitation number
- S113992-vCurrent
- Issued by
- Norfolk County, Suffolk County, Quincy City, Boston City, Massachusetts
About this file
This document is an Invitation for Consultant Services Request for Qualification Statements/Proposals issued by the Massachusetts Water Resources Authority (MWRA). The MWRA is seeking engineering/design firms to provide Engineering Services During Construction and Resident Engineering/Inspection Services for two construction projects at the Deer Island Treatment Plant: the Digested Sludge Overflow Piping and Plug Valve Replacement, and the Digested Sludge and Flushing Pump Replacement. A pre-proposal conference will be held on July 30, 2008, and qualification statements/proposals are due by 11:00 AM on August 15, 2008. Access to the Deer Island Treatment Plant is restricted, and bidders must contact MWRA to obtain access instructions.
The document does not provide specific details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient financial information. The focus is on the consulting services required for the two construction projects at the Deer Island Treatment Plant.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S113992-vCurrent_OD.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR CONSULTANT SERVICES
REQUEST FOR QUALIFICATION STATEMENTS/PROPOSALS
MASSACHUSETTS WATER RESOURCES AUTHORITY
The Massachusetts Water Resources Authority (the "Authority") requests Qualification Statements/Proposals from engineering/design firms in connection with the Authority's
ENGINEERING SERVICES DURING CONSTRUCTION
AND RESIDENT ENGINEERING/INSPECTION SERVICES
FOR DIGESTED SLUDGE OVERFLOW PIPING AND PLUG VALVE REPLACEMENT
AND
DIGESTED SLUDGE AND FLUSHING PUMP REPLACEMENT
DEER ISLAND TREATMENT PLANT
CONTRACT NO. 7055A
MWRA’s Digested Sludge Overflow Piping and Plug Valve Replacement Construction Contract No. 7055 consists of removal, demolition, disposal and replacement of the existing digested sludge emergency overflow pipelines and associated valves in Modules 1, 2 and 3 and the digester gas storage tanks (“Dystor Tanks”) in the Residual Area of the Deer Island Treatment Plant. MWRA’s Digested Sludge and Flushing Pump Replacement Construction Contract No. 7123 includes two separate work locations indicated as DSL Sludge and Flushing Pump Systems at Deer Island Treatment Plant, Boston, MA and at the Fore River Staging Area, Quincy, MA. This procurement is for ESDC services and the Resident Engineering/Inspection Services for the construction of these Projects.
Interested firms may obtain the complete Request for Qualification Statements/Proposals from the Authority's Procurement Document Distribution Center, 100 First Ave. First Floor, Charlestown Navy Yard, Boston, MA 02129, telephone (617) 788-2575 on or after Wednesday, July 23, 2008. Qualification Statements/Proposals will be received at the Procurement Document Distribution Center until 11:00 A.M. Friday, August 15, 2008. A Pre-Proposal Conference will be held at the MWRA Deer Island Treatment Plant in Room 202 of the Admin/Lab Building, Deer Island Treatment Plant on July 30, 2008 at 9:00 A.M. Access to Deer Island is restricted. Bidders must contact Rebecca Tearte (617-660-7691) before 3:00 P.M. July 29, 2008 for access instructions. Attendees must bring a Company ID.
The contact for this project is Dan Thompson, FAX (617) 660-7958.
BY: Kevin Feeley Director of Procurement
DATE: July 19, 2008
File details come from the government source that posted it. Updated .