About this file

This Emergency Determination Form documents an emergency procurement by the New Mexico Department of Homeland Security and Emergency Management Agency (DHSEM) for debris monitoring services in response to severe flooding in San Juan County during October 2026. The procurement is for King Industries, located at 1096 Mechem Dr. Suite 105, Ruidoso, NM 88345, to provide debris removal monitoring and related services following a State Disaster Declaration and Federal Emergency Declaration approved on October 26, 2026. The scope of work includes pre-event planning and collaboration with AshBritt, Inc. to develop a debris management plan; comprehensive training requirements for contractor staff including 40-hour HAZWOPER certification, ICS-100 and ICS-200 courses, debris assessment team training, and arborist training; field monitoring of debris removal activities at loading and disposal sites; documentation of debris types, quantities, and locations; contractor performance monitoring; regular status updates and detailed reporting on activities and assessments; quality assurance measures including periodic reviews and audits; environmental compliance verification; community communication; health and safety protocol implementation; and coordination with local authorities. The contractor must commence mobilization within 48 hours of selection notification, with sub-contractors requiring pre-approval by DHSEM staff. The initial consideration area extends 100 miles from Chavez County, expandable statewide if qualified contractors are unavailable.

The contract amount is $1,000,000.00 with a three-month term. The emergency procurement was justified based on the immediate threat to public health and safety created by substantial debris accumulation in public rights-of-way following the October 2026 flooding, which cannot be adequately addressed through normal procurement methods. DHSEM noted that while an existing contract is in place, additional administrative processing time is required to execute a separate professional services agreement, necessitating the emergency procurement to enable concurrent mobilization of debris removal and monitoring services. The procurement is subject to federal compliance requirements including Davis-Bacon Act provisions (applicable to construction contracts over $2,000), Contract Work Hours and Safety Standards Act requirements (for contracts over $100,000 involving mechanics or laborers), Clean Air Act and Federal Water Pollution Control Act compliance (for contracts over $150,000), Byrd Anti-Lobbying Amendment certifications (for awards over $100,000), debarment and suspension verification through the System for Award Management, and domestic preferences for American-produced goods and materials. DHSEM indicated that the emergency procurement is temporary, with the department planning to establish and maintain contracts for debris removal and monitoring services to reduce future reliance on emergency procurements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2022 Emergency Form

STATE OF NEW MEXICO

EMERGENCY DETERMINATION FORM

The emergency procurement method (NMSA 1978, Section 13-1-127) may only be used when the service, construction or item of tangible personal property procured:

1. is needed immediately to:

a. control a serious threat to public health, welfare, safety or property caused by a flood, fire, epidemic, riot, act of terrorism, equipment failure or similar event; or

b. plan or prepare for the response to a serious threat to public health, welfare, safety or property caused by a flood, fire, epidemic, riot, act of terrorism, equipment failure or similar event; and

2. cannot be acquired through normal procurement methods.

a. The agency entering into an emergency procurement should employ a competitive process to the extent practicable under circumstances.

The purchase or lease of heavy road equipment is not allowed under the emergency procurement statute.

The state purchasing agent or a central purchasing office that makes an emergency procurement shall outline its determination of the basis for the procurement and its selection of the contractor in writing and include the writing in the procurement file. (That writing can be made on this form.) Promptly thereafter:

the state purchasing agent shall post notice of the procurement on its website; or the central purchasing office shall post notice of the procurement on its website, if it maintains one, and shall transmit the notice to the state purchasing agent for posting on the state purchasing agent's website.

NOTE: the state purchasing agent or a central purchasing office that makes an emergency procurement to plan or prepare for the response to a serious threat to public health, welfare, safety or property caused by a flood, fire, epidemic, riot, act of terrorism, equipment failure or similar event shall account for the money spent in making the procurement and report on that accounting to the legislative finance committee and the department of finance and administration within sixty days after the end of the fiscal year in which the procurement was made.

I. Name of Agency: Department of Homeland Security and Emergency Management

Agency Chief Procurement Officer: Megan Martinez

Telephone Number: 505-373-7365

II. Name of Contractor: King Industries

Address of Contractor: 1096 Mechem Dr. Suite 105 Ruidoso, NM 88345

Amount of prospective contract: $1,000,000.00

Term of prospective contract: 3 months

III. Thoroughly list the services (scope of work), construction or items of tangible personal property being procured:

1. Pre-Event Planning:

o Collaborate with AshBritt, Inc to develop a debris management plan.

o Identify monitoring locations and establish monitoring procedures.

2. Training:

o Contactor shall provide and document the following training:

Accredited forty (40) hours of Hazardous Waste Operations and Emergency Response (HAZWOPER) training to Contractor’s field staff (specifically staff that does or may enter disaster debris "hot zones"), including Task Force Leaders and all other personnel supporting structural debris removal operations in the field.

ICS-100 and ICS-200 training courses for all Contractor staff.

Debris assessment team training, for all Contractor assessment staff.

Arborist training, detailing the specific assessment methods to be used by all Arborists on the operation for consistency of assessment.

Hazard tree assessment strike team training, detailing how they will mark trees and document hazard tree assessments, and how they coordinate when conducting and documenting the Hazard Tree assessments.

Any other necessary training as warranted for the specific operation, as directed by the Contracting Agency.

3. Debris Removal Monitoring:

o Conduct field monitoring of debris removal activities to verify adherence to approved plans and regulations. See FEMA’s Public Assistance Debris Monitoring Guide, Chapter 3: Debris Monitoring Resources and Duties.

Monitoring shall extend to reviewing activities at both the loading and disposal site.

o Document debris types, quantities, and locations using established protocols and reporting formats.

o Monitor contractor performance and adherence to safety standards.

4. Reporting:

o Regular updates on the status of debris removal activities, including milestones achieved and challenges encountered.

o Detailed reports documenting all activities, assessments, debris categorization, disposal methods, and any issues arising during the project.

5. Quality Assurance:

o Implement quality control measures to ensure data accuracy and completeness.

o Conduct periodic reviews and audits of monitoring activities to maintain high standards of service.

6. Additional Recommended Items:

o Documenting Eligible Work and Costs: “With proper documentation, an Applicant may fully account for debris clearance and removal costs incurred as a result of a Presidentially declared disaster. A load ticket provides the most comprehensive information and a paper trail for FEMA PA program reimbursement. To support the documentation provided by the load tickets, monitors should use tower-monitoring logs, roving monitor reports, daily issue logs, and truck certification forms as part of their reporting process. Samples of these forms are included in Appendix B: Sample Debris Monitoring Plan and Monitoring Forms. When ADMS technology is used, the data generated should clearly display loading monitor and tower/site monitor names, load times, and locations so that an individual’s daily activities can be easily reviewed.” See Public Assistance Debris Monitoring Guide, Chapter 6: Documenting Eligible Work and Costs.

Ensure compliance with and guidance from Public Assistance Debris Monitoring Guide, Chapter 6: Documenting Eligible Work and Costs.

o Environmental Compliance: Ensuring all debris removal and disposal activities comply with local, state, and federal environmental regulations.

o Community Communication: Establishing a communication plan so as to keep the Department of Homeland Security and Emergency Management informed about the debris removal process, timelines, and any necessary actions on their part.

o Health and Safety Measures: Implementation of strict health and safety protocols to protect workers and residents during debris removal operations.

o Coordination with Local Authorities: Close collaboration with local government agencies, emergency services, and environmental authorities to ensure a coordinated response and resource sharing.

o Sub-Contractors: Sub-contractors must be pre-approved by DHSEM staff before selection. The initial consideration area extends 100 miles from Chavez County, if no qualified contractors are available, the area may be expanded statewide, in consultation with DHSEM.

o Timely Mobilization. The selected vendor must commence mobilizing services within 48 hours of notification of their selection for emergency procurement, ensuring that the deployment of necessary services to impacted areas begins promptly.

IV. Provide an explanation for the justification of the procurement including a description of the emergency condition(s) requiring use of emergency procurement and the practicable competition utilized in compliance with NMSA 1978, Section 13-1-127.

In October 2026, severe rainfall resulted in significant flooding throughout San Juan County, New Mexico, prompting a State Disaster Declaration and subsequent approval of a Federal Emergency Declaration on October 26, 2026. The flooding caused extensive damage to residential and commercial properties, public infrastructure, and surrounding areas, resulting in substantial debris accumulation within public rights-of-way.

As residents and businesses begin recovery efforts, disaster-generated debris is being removed from private properties and placed along public rights-of-way for collection. The accumulation of debris presents potential threats to public health and safety, including roadway obstructions, traffic hazards, and possible exposure to hazardous materials.

The New Mexico Department of Homeland Security and Emergency Management (DHSEM) has identified an urgent need to mobilize both debris removal and debris monitoring services within the affected areas of San Juan County. Debris removal services are necessary to safely and efficiently remove disaster-generated debris from public rights-of-way, while debris monitoring services will provide oversight of removal operations, verify debris quantities, document eligible activities, and support compliance with applicable state and federal requirements.

Due to the immediate nature of these conditions, DHSEM is pursuing an emergency procurement for debris monitoring services to ensure monitoring contractors can mobilize concurrently with debris removal contractors. Coordinated mobilization of both services is essential to maintaining proper oversight and documentation from the onset of debris removal operations, protecting public health and safety, and supporting potential federal reimbursement and disaster recovery efforts.

V. Describe what measures are being taken to minimize the duration and effect of this particular emergency procurement (for example: is the emergency only in place until a competitive process can be completed, etc.).

The requested debris monitoring services are anticipated to be needed for a short duration. The New Mexico Department of Homeland Security and Emergency Management (DHSEM) currently has an existing contract in place; however, additional administrative processing time will be required to execute a separate professional services agreement.

DHSEM recognizes the urgent need for these services in response to ongoing fire- and flood-related incidents throughout the state. The Department is actively coordinating with contractors to secure the necessary services as expeditiously as possible to support emergency response and recovery operations.

VI. Describe what measures the Agency will take in the future to prevent/mitigate use of an emergency procurement under similar circumstances.

DHSEM will continue to evaluate anticipated emergency response and recovery needs and proactively assess existing contracts to ensure appropriate services are available when needed.

The Department will work to establish and maintain contracts for debris removal and monitoring services that can support future fire, flood, and other disaster-related incidents throughout the state.

Additionally, DHSEM will continue to identify potential service gaps, initiate procurement processes in advance when feasible, and minimize the need for emergency procurements.

However, due to the unpredictable nature, timing, and severity of disasters, emergency procurements may still be necessary when immediate services are required to protect public health, safety, and welfare.

CONTRACT PROVISIONS FOR NON-FEDERAL ENTITTY CONTRACTS UNDER

FEDERAL AWARD – APPENDIX II TO PART 200

(A) Contracts for more than the simplified acquisition threshold, which is the inflation adjusted amount determined by the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) as authorized by 41 U.S.C. 1908, must address administrative, contractual, or legal remedies in instances where contractors violate or breach contract terms, and provide for such sanctions and penalties as appropriate. - -

(B) All contracts in excess of $10,000 must address termination for cause and for convenience by the non-Federal entity including the manner by which it will be effected and the basis for settlement.

(C) Equal Employment Opportunity. Except as otherwise provided under 41 CFR Part 60, all contracts that meet the definition of “federally assisted construction contract” in 41 CFR Part 60-1.3 must include the equal opportunity clause provided under 41 CFR 60-1.4(b), in accordance with Executive Order 11246, “Equal Employment Opportunity” (30 FR 12319, 12935, 3 CFR Part, 1964-1965 Comp., p. 339), as amended by Executive Order 11375, “Amending Executive Order 11246 Relating to Equal Employment Opportunity,” and implementing regulations at 41 CFR part 60, “Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor.” –

(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non Federal entities must include a provision for compliance with the Davis- Bacon Act (40 U.S.C. 3141- 3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The non-Federal entity must place a copy of the current prevailing wage determination issued by the Department of Labor in each solicitation.

The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The non-Federal entity must report all suspected or reported violations to the Federal awarding agency. The contracts must also include a provision for compliance with the Copeland “Anti-Kickback” Act (40 U.S.C. 3145), as supplemented by Department of Labor regulations (29 CFR Part 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). The Act provides that each contractor or subrecipient must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled.

The non-Federal entity must report all suspected or reported violations to the Federal awarding agency.

(E) Contract Work Hours and Safety Standards Act (40 U.S.C. 3701-3708). Where applicable, all contracts awarded by the non- Federal entity in excess of $100,000 that involve the employment of mechanics or laborers must include a provision for compliance with 40 U.S.C.

3702 and 3704, as supplemented by Department of Labor regulations (29 CFR Part 5). Under 40 U.S.C. 3702 of the Act, each contractor must be required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. 3704 are applicable to construction work and provide that no laborer or mechanic must be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence.

(F) Rights to Inventions Made Under a Contract or Agreement. If the Federal award meets the definition of “funding agreement” under 37 CFR § 401.2 (a) and the recipient or subrecipient wishes to enter into a contract with a small business firm or nonprofit organization regarding the substitution of parties, assignment or performance of experimental, developmental, or research work under that “funding agreement,” the recipient or subrecipient must comply with the requirements of 37 CFR Part 401, “Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any implementing regulations issued by the awarding agency.

(G) Clean Air Act (42 U.S.C. 7401-7671q.) and the Federal Water Pollution Control Act (33

U.S.C. 1251-1387), as amended - Contracts and subgrants of amounts in excess of $150,000 must contain a provision that requires the non-Federal award to agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C.

7401- 7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251 1387). Violations must be reported to the Federal awarding agency and the Regional Office of the Environmental Protection Agency (EPA).

(H) Debarment and Suspension (Executive Orders 12549 and 12689) - A contract award (see 2

CFR 180.220) must not be made to parties listed on the governmentwide exclusions in the System for Award Management (SAM), in accordance with the OMB guidelines at 2 CFR 180 that implement Executive Orders 12549 (3 CFR part 1986 Comp., p. 189) and 12689 (3 CFR part 1989 Comp., p. 235), “Debarment and Suspension.” SAM Exclusions contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than Executive Order 12549.

(I) Byrd Anti-Lobbying Amendment (31 U.S.C. 1352) - Contractors that apply or bid for an award exceeding $100,000 must file the required certification. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. 1352. Each tier must also disclose any lobbying with non- Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the non-Federal award.

(J) Procurement of recovered materials - A Non-Federal entity that is a state agency or agency of a political subdivision of a state and its contractors must comply with section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. The requirements of Section 6002 include procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at 40 CFR part 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines.

(K) Prohibition on certain telecommunications and video surveillance services or equipment

a. Recipients and sub recipients are prohibited from obligating or expending loan or grant funds to:

1. Procure or obtain;

2. Extend or renew a contract to procure or obtain; or

3. Enter into a contract (or extend or renew a contract) to procure or obtain equipment, services, or systems that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. As described in Public Law 115-232, section 889, covered telecommunications equipment is telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities).

i. For the purpose of public safety, security of government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities).

ii Telecommunications or video surveillance services provided by such entities or using such equipment.

iii Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of the National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

b. In implementing the prohibition under Public Law 115-232, section 889, subsection (f), paragraph (1), heads of executive agencies administering loan, grant, or subsidy programs shall prioritize available funding and technical support to assist affected businesses, institutions and organizations as is reasonably necessary for those affected entities to transition from covered communications equipment and services, to procure replacement equipment and services, and to ensure that communications service to users and customers is sustained.

c. See Public Law 115-232, section 889 for additional information.

d. See also § 200.471.

(L) Domestic preferences for procurements –

(a) As appropriate and to the extent consistent with law, the non-Federal entity should, to the greatest extent practicable under a Federal award, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products). The requirements of this section must be included in all subawards including all contracts and purchase orders for work or products under this award.

(b) For purposes of this section:

(1) “Produced in the United States” means, for iron and steel products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States.

(2) “Manufactured products” means items and construction materials composed in whole or in part of non-ferrous metals such as aluminum; plastics and polymer-based products such as polyvinyl chloride pipe; aggregates such as concrete; glass, including optical fiber; and lumber.

Certified by:

_____________________________________________ Date: _______________ Agency Chief Procurement Officer

Agency Approval by:

________________________________________________ Date: _____________ Cabinet Secretary/Governmental Entity Head or Designee

Heather Kent Emergency Procurement

Heather Kent FY27 Approval Stamp

File details come from the government source that posted it. Updated .