7_ReworkAndRepairES7034.pdf
PDF 88 KB Posted
- Attached to
- F-15 Initiators Federal contract opportunity
- Solicitation number
- FA8213-24-R-3020
About this file
This document is an attachment describing the policies and procedures for rework and repair of nonconforming material under a federal contract. The attachment defines rework as reprocessing nonconforming material to completely meet requirements, and repair as reprocessing to reduce but not fully eliminate nonconformance. Rework procedures must be documented by the contractor and submitted to the Government Quality Assurance Representative for review prior to implementation. Repair procedures must be documented and submitted to the Contracting Officer for written approval on a Request for Deviation/Waiver form. The submission must include the cause of the nonconformance and actions to prevent recurrence. Reworked or repaired items require reinspection to provide government assurance of meeting requirements. This rework and repair requirement flows down to contractors, suppliers, vendors, and subcontractors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8213-24-R-3020_0003.pdf | ||
| FA8213-24-R-3020_0002.pdf | ||
| FA8213-24-R-3020 0002.pdf | ||
| FA8213-24-R-3020_0001.pdf | ||
| FA8213-24-R-3020.pdf | ||
| FA8213-24-R-3020.pdf | ||
| 8_EDL_Combined_NEW.pdf | ||
| 2_REPSHIP11Mar14.pdf | ||
| 4_CADPAD Item Marking Instruction - Ver 1.6.pdf | ||
| 11_24-50055 FMS 24-50056USAF CDRLs.pdf | ||
| 9_JFQR_Combined.pdf | ||
| 5_PHST SOW _HILL_2023.pdf | ||
| 6_SPI_Combined.pdf | ||
| 1_Air SpecsFD20202450055_FMS_50056_USAF.pdf | ||
| 10_Item Descriptions_combined.pdf | ||
| 3_ADC_SOW_Jan2018.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5
(ES7034)
REWORK AND REPAIR OF NONCONFORMING MATERIAL
Jan 2012 (version)
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(End of clause)