7.Attachment 1 - Alvarado Full Height Turnstiles Instructions.pdf
PDF 4 MB Posted
- Solicitation number
- N6426724Q0155
About this file
This document is the installation and operation instructions for Alvarado Manufacturing Company's full height maximum security turnstile (model PUD1208R6-2 MST). It provides detailed step-by-step instructions for installing and maintaining the turnstile, including information on electrical wiring, lubrication, troubleshooting, and cleaning. The instructions cover models MST-3, MST-6X, CLST-3, CLST-6X, CPST-6X, FMST-3, FMST-6X, and MST47-3, MST47-6X. The document includes illustrations, parts lists, and specifications related to the turnstile installation. It also covers key override operation, conduit instructions, turnstile control board layout, DIP switch descriptions, and user activation and passage instructions. Overall, this document provides comprehensive technical guidance for the proper installation and maintenance of Alvarado's full height maximum security turnstiles.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installation and Operation Instructions
Alvarado Manufacturing Company, Inc.
12660 Colony Street, Chino, CA 91710
Phone: (909) 591-8431 Fax: (909) 628-1403 support@alvaradomfg.com www.alvaradomfg.com
FULL HEIGHT MAXIMUM SECURITY TURNSTILE
PUD1208R6-2
MST Installation Instructions
Page 2 support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Installation Instructions
Contents Contents Safety Precautions Safety Icons Compliance and Standards Installation Tools Parts List Before You Begin Common Terms Installation Instructions
Installation Locations Bottom Bearing Plate Installation Yoke Installation OV Installation
Roto Installation Top Channel Installation Guard Plate Installation Bearing Cover Installation
Top Bearing Cover Installation Bottom Bearing Cover Installation
Final Mechanical Installation Steps Key Override Operation Conduit Instructions Electrical Wiring Instructions
Turnstile Control Board Layout Terminal Descriptions SW4 DIP Switch Descriptions
User Activation and Passage Instructions Post-Installation Checklist Troubleshooting Cleaning and Maintenance Lubrication Appendix A - CPST Installation
Yoke Installation Appendix B - CLST Installation Appendix C - FMST Installation Appendix D - MST47 Installation Appendix E - Fail-lock / Fail-safe Spring and Solenoid Configurations
Clockwise Fail-safe Fail-lock Counterclockwise Fail-safe Fail-lock
Appendix E - Fail-lock / Fail-safe Spring and Solenoid Configurations (Cont) Clockwise Fail-safe Fail-lock Clockwise Fail-safe Fail-lock
Appendix F - Key Override Adjustable Cam Installation Clockwise Counterclockwise
Revision History
Installation Instructions support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Page 3
The following symbols are used throughout the manual to highlight important information and potential risks when installing, servicing or using the turnstiles covered in this manual.
WARNING This symbol is used in this manual to warn installers and operators of potential harm. Please read these instructions very carefully.
CAUTION This symbol is used in this manual to designate potential conditions that may pose a risk to pedestrians, personnel, property and equipment.
Please read these instructions very carefully.
NOTE This symbol is used in this manual to designate useful information for the installer and operator.
Please read these instructions.
Safety Icons
A minimum of two people is required to complete the installation of this product.
For questions, please contact Alvarado at (909) 591-8431, Monday – Friday 7:00am to 4:30 PST.
Please read this manual completely before installing or operating the product.
Safety Precautions
The Full Height Security Turnstile may present a risk to persons and property if it is not installed and/or operated correctly. This manual must be read in its entirety and all safety and operations information must be folloed. Note the following precautions:
• Use only skilled individuals to install and service the turnstile.
• DO NOT operate the turnstile if it has been damaged in any manner. If damaged, have the unit repaired or adjusted by a skilled service person before use.
• DO NOT modify or alter the turnstile.
• Have skilled individuals maintain the turnstile according to a proper maintenance schedule.
• In access control applications, train all personnel that will be using the turnstile in the proper method of operation. In addition, properly train new users as they are added to the system.
• DO NOT use non-Alvarado parts to repair a damaged turnstile.
• Closely follow the handling instructions for moving or lifting the turnstile during installation.
• Power off the turnstile before connecting or disconnecting any communication or power wiring to the turnstile.
• The turnstile is not a toy. DO NOT allow children to play on or near the turnstile. DO NOT allow horseplay near the turnstile.
• Utilisez uniquement des personnes qualifiées pour installer et entretenir le tourniquet.
• NE PAS faire fonctionner le tourniquet s'il a été endommagé de quelque façon. S'il est endommagé, faire réparer ou ajuster l'unité avant l'utilisation par un(e) préposé(e) à l'entretien qualifié(e).
• NE PAS modifier ou altérer le tourniquet.
• Le tourniquet doit être maintenu selon un calendrier d'entretien adéquat par des personnes qualifiées.
• Dans les applications de contrôle d'accès, former tout le personnel qui utilisera le tourniquet selon la bonne méthode de fonctionnement. De plus, bien former les nouveaux utilisateurs à leur intégration au système.
• NE PAS utiliser des pièces ne provenant pas du Alvarado pour réparer un tourniquet endommagé.
• Suivez strictement les instructions de manutention pour déplacer ou soulever le tourniquet lors de l'installation
• Éteignez le tourniquet avant de brancher ou de débrancher le câblage de communication ou le câblage d'electricité.
• Le tourniquet n'est pas un jouet. Ne pas laisser les enfants jouer sur ou près du tourniquet. Ne pas se chamailler près du tourniquet.
SAVE THESE INSTRUCTIONS
Page 4 support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Installation Instructions
Compliance and Standards This page defines the product labels required for compliance with UL Electrical Testing Laboratory and International CE standards.
International CE standards:
a. Label (2) the Fuse Specification.
F3.0A, 240V
b. Label (3) the Warning, Risk of Electric Shock.
DANGER
c. Label (4) the Caution, Risk of Danger.
DANGER
UL 294, UL 325 Testing Laboratory Standards:
a. Label (2) the Fuse Caution.
CAUTION: For continued protection, against risk of fire or shock, replace with the same type and rating fuse.
b. Label (3) the Warning, Risk of Electric Shock.
WARNING: For continued protection, against risk of fire or shock, replace with the same type and rating fuse.
c. UL 294, Access Control Levels:
Destructive Attack - Level 1
Line Security - Level 1
Endurance - Level 4
Standby Power - Level 1
The following tools may be required during the installation, dependent on the specific product installed. These tools are not provided.
Pencil
Phillips Tip Screwdriver
Tape Measure
Drill
5/8” Concrete Drill Bit 9/64" Drill Bit
Installation Tools
O N
Socket Wrench
⅛” Allen Wrench
9/16” Wrench 3/4" Wrench
Chalk Line Ladder
Level
9/16” Socket 3/4" Socket
Grease (see "Lubrication")
Flat Tip Screwdriver
Wire Strippers
Hammer Drill
Clear RTV Silicone
Torque Wrench
This product is fully certified by a nationally recognized testing laboratory to UL 294, UL 325, and CSA C22.2 NO.247-14. Unauthorized modification to this product in any way is prohibited.
UL Certification
Installation Instructions support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Page 5
This product is shipped with all required installation hardware and components. Make sure that none of these parts are missing and/or damaged before beginning installation. If there are parts missing and/or damaged, please stop the installation and contact Alvarado.
Yoke (Qty 1)
MST Illustrated Parts List
Parts List
Roto (Qty 1)
OV
(Qty 1)
Yoke Guard Plate (Qty 1)
Bottom Bearing Plate (Qty 1)
Bottom Bearing Cover (Qty 1)
Bottom Bearing (Qty 1)
Top Channel (Qty 1)
10-32 x ½" Allen Head Screw (Qty 6)
½" x 1" Hex Head Bolt (Qty 1)
½" x 1½" Hex Head Bolt (Qty 2)
½" x 2¾" Hex Bolt Head (Qty 2)
#10 x ¾" Phillips Pan Head Screw (Qty 10)
½" Nut (Qty 5)
⅜" x 2½" Anchor Bolt (Qty 12)
⅜" Flat Washers (Qty 12)
⅜" x 2.00" Concrete Anchors (Qty 12)
Top Bearing Cover (Qty 1)
⅜" x 4½" Anchor Bolt (Qty 3) - Yoke Only
NOTE Alvarado full height turnstiles share common components across models. The parts list below is for the MST-3 and MST-6X models only. Reference appendix A-D to see alternate components used on other models.
½" Flat Washer (Qty 1)
Concrete Anchor Package
NOTE For stainless steel installations, discard the 2½" zinc anchor bolts and ⅜" zinc flat washers packaged with the concrete anchors. Use the supplied 2½" stainless steel anchor bolts and ⅜" stainless steel flat washers.
½" Lock Washer (Qty 5)
Page 6 support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Installation Instructions
Common Terms
Activation Activation (unlocking) of electric models is accomplished by providing a momentary dry contact of .5 seconds to 2 seconds or greater to the appropriate location on the turnstile control board. Activations are not buffered. After an activation is received, the turnstile will not accept another activation until the turnstile is rotated or the activation has timed out (see Time-Out below).
Clockwise Rotation Turnstile arms rotate in a clockwise direction.
Counterclockwise Rotation
Turnstile arms rotate in a counterclockwise direction.
Electric Lock Control
Relevant to electric models only.
Electric units (“6X” models) provide electric lock control. The turnstile is unlocked by providing an activation (unlock signal), in the form of a momentary dry contact of .5 seconds to 2 seconds, to the appropriate location on the turnstile control board.
Separate controls are provided for each direction of rotation.
Fail-Lock Relevant to electric models only.
Upon loss of power, the rotating section (roto) cannot be rotated in the fail-lock direction(s).
Fail-Safe Relevant to electric models only.
Upon loss of power, the roto freely rotates in the fail-safe direction(s).
Key Override All full height turnstiles, whether manual or electric, come with key locks, located on the underside of the top channel, to allow key override control of the roto. Separate key overrides are provided for each rotation direction.
For manual units (“3” models), the key override control allows each rotation direction to be either locked (no passage) or unlocked (free passage).
For electric units ("6X” models), key override control allows each rotation direction to be locked, in which case the turnstile can be unlocked by an activation. Alternatively, key override control allows each direction of rotation to be unlocked, in which case the turnstile will freely rotate in the unlocked direction(s).
Manual Control Manual control of the turnstile is available through use of the key override control function (see above).
Self-Centering The turnstile arms automatically return to home position once rotation has been completed.
Time-Out When the turnstile receives an activation (unlock signal), the user is allowed a set time to pass through the turnstile before it automatically re-locks. The factory default time-out setting is 20 seconds. The turnstile control board allows the user to decrease this time setting to 5, 10 or 15 seconds.
Before You Begin This manual focuses on the installation of Alvarado full height turnstiles, using the MST and MSTX as the basis of instruction. Most steps are identical across models. Differences in components or installation process are called out, as applicable. These instructions are applicable for the installation of the following models:
MST-3 CLST-3 CPST-6X FMST-3 MST47-3
MST-6X CLST-6X FMST-6X MST47-6X
Installation Instructions support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Page 7
Turnstile
Center
Installation Instructions
NOTE
Install the turnstile on a 6' x 6' (min.) level concrete slab. The slab must be a minimum of 4" thickness. The turnstile may only be installed on concrete. Do not install the turnstile on asphalt.
DIMENSIONS SHOWN ARE FOR MST-3 and MST-6X MODELS. SEE
APPENDIX A-D FOR OTHER MODELS.
NOTE
The turnstile is rated for both indoor and outdoor use.
Installation Locations
1. Determine where the turnstile will be installed.
Consider the overall footprint size of the unit when determining the installation location (Figure 1).
Once the installation location has been determined, use a chalk line to mark the centerline of the turnstile.
NOTES
Default entry rotation is counterclockwise.
Confirm correct entry direction prior to installation.
Alvarado recommends that the minimum installation width required be 64".
62.00" (1575mm)
54.00" (1372mm)
2. Determine and mark the centerline location for the OV, Roto, and Yoke (Figure 2).
NOTE
The overall height of the MST is 91.5". However, an additional 3" of clearance must be added for service and maintenance.
If desired, installers can stub up the power conduit at the intersection of the turnstile centerline and the OV centerline. Power may also be routed directly into the top channel (Figure 26).
Mark all center lines prior to installation.
Fig. 1
Fig. 2
Roto Centerline
29.63" (752mm)
30.0" (762mm)
CL
CL
O N
Yoke Centerline
Entry Side (Unsecured)
Exit Side (Secured)
31.5" (800mm)
30.5" (775mm)
OV Centerline
30.0" (762mm)
29.63" (752mm)
Page 8 support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Installation Instructions
⅜" Flat Washer
⅜" x 2½" Anchor Bolt
Bottom Bearing Plate Installation
Fig. 3
1. Place the bottom bearing plate over the turnstile and roto intersecting lines.
2. Mark the center location of all four anchor holes for the bottom bearing plate (Figure 3). Set aside the bottom bearing plate.
3. Using a ⅝" concrete drill bit, drill four anchor holes, 3" in depth, at the center of each marked location (Figure 3).
NOTE
The anchor hole(s) must be clean before installing the anchor bolt(s). If the hole(s) are not clear of debris, the anchor bolt(s) may not tighten correctly.
4. Insert one anchor into each drilled hole (Figure 4).
The threaded end of the anchor must be inserted into the hole first. Use a hammer to tap the anchor into place, if needed. Ensure that the anchors are flush with the concrete floor.
5. Place the bottom bearing plate back over the anchor holes and anchor it with four (4) ⅜" x 2½" anchor bolts and flat washers (Figure 5).
6. Use a socket wrench and 9/16" socket to tighten the anchor bolts (Figure 6).
7. Confirm that the bottom bearing plate is level. Shim as needed.
8. Apply a thick bead of clear RTV silicone around the bottom bearing plate (Figure 6).
NOTE
Clear RTV silicone is a low volatile formula and has an application temperature range from -70°F up to 400°F.
Pencil
Bottom Bearing Plate
⅝” Concrete Drill Bit
Fig. 4
Fig. 5
⅜" Concrete Anchor
Threaded Side Down
Bottom Bearing Plate
Fig. 6
9/16" Socket and Socket Wrench
Clear Silicone
Installation Instructions support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Page 9
Yoke Installation
NOTES
Do not use a single yoke as a template when multiple turnstiles are installed, as yoke dimensions may vary slightly from yoke to yoke.
NOTE STEPS AND DIMENSIONS SHOWN
ARE FOR MST MODELS. SEE APPENDIX
A-D FOR OTHER MODELS.
1. Reconfirm the centerline location for the yoke (Figure 7).
2. Using a ⅝" concrete drill bit, drill an anchor hole 3" in depth.
NOTE
The anchor hole(s) must be clean before installing the anchor bolt(s). If the hole(s) are not clear of debris, the anchor bolt(s) may not tighten correctly.
3. Insert one anchor into the drilled hole (Figure 8A). The threaded end of the anchor must be inserted into the hole first. Use a hammer to tap the anchor into place, if needed.
Ensure that the anchor is flush with the concrete floor.
4. Place the Yoke back over the anchor hole and anchor it with one ⅜" x 4 ½" anchor bolt and flat washer .
NOTE
Prior to drilling the remaining anchor holes, use a tape measure and measure the distance from the bottom bearing plate center to the remaining mounting holes on the yoke (Figure 7). Adjust the yoke until these two distances are identical. Mark these two locations.
5. Rotate the yoke to the left. Using a ⅝" concrete drill bit, drill two anchor holes 3" in depth at the center of each marked location.
6. Insert two anchors into the drilled holes (Figure 8A). The threaded end of the anchors must be inserted into the holes first. Use a hammer to tap the anchors into place, if needed.
Ensure that the anchors are flush with the concrete floor.
7. Rotate the yoke back over the anchor holes and anchor it with two ⅜" x 4½" anchor bolt and flat washer (Figure 9).
8. Once the yoke has been anchored, use a socket wrench and 9/16" socket to tighten the anchor bolts (Figure 10).
9. Confirm the yoke is level and plumb. Shim as needed.
Fig. 7
Yoke Center
Bottom Bearing Plate Center
29.63" (752mm)
Fig. 8
8A
Fig. 9
⅜" Flat Washer
⅜" x 4½" Anchor Bolt
Fig. 10
9/16" Socket and
CL
Page 10 support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Installation Instructions
OV
⅜" Flat Washer
⅜" x 2½" Anchor Bolt
OV Installation
NOTE STEPS AND DIMENSIONS SHOWN
ARE FOR MST MODELS. SEE APPENDIX
A-D FOR OTHER MODELS.
1. Reconfirm the centerline location for the OV (Figure 11).
2. While holding the OV in place, use a pencil and mark the center of all four anchoring holes in the base of the OV (Figure 12).
3. Using a ⅝" concrete drill bit, drill four anchor holes, 3" in depth, at the center of each marked location in Step 2.
NOTES
The anchor hole(s) must be clean before installing the anchor bolt(s). If the hole(s) are not clear of debris, the anchor bolt(s) may not tighten correctly.
If desired, conduit stub may be marked and installed at this time. Refer to the "Electrical Wiring" section.
4. Insert anchors into the drilled holes. The threaded end of the anchor must be inserted into the hole first. Use a hammer to tap the anchor into place, if needed. Ensure that the anchors are flush with the concrete floor.
5. Place the OV back over the anchor holes and anchor it with four ⅜" x 2½" anchor bolts and flat washers (Figure 13).
6. Once the OV has been anchored, use a socket wrench and 9/16" socket to tighten the anchor bolts (Figure 14).
7. Confirm OV is level and plumb.
Shim as needed.
Fig. 11
30.0" (762mm)
Bottom Bearing Plate Center
OV Center
Pencil
Fig. 12
Fig. 13 Fig. 14
Prior to installing, liberally apply a coating of grease to the shaft, top of the bearing, sides of the bottom bearing plate and inside the bottom bearing plate (layer ¼" to ½" in thickness). Applying grease as indicated will help protect against moisture and foreign matter penetrating the bearing area.
1. Attach the bottom bearing, collar facing up, to the lower end of the roto (Figure 15) by sliding the bottom bearing onto the mounting shaft (Figure 15A).
Fig. 15
Roto Installation
Roto Section
Bottom Bearing
169 " Socket and
CL
15A
Bottom Bearing
Roto
Mounting Shaft
Collar
Grease
Installation Instructions support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Page 11
Fig. 16
Bottom Bearing
Bottom Bearing Plate
Fig. 17
Yoke
Roto
OV
CL
Roto Installation (Cont)
2. Apply grease, as instructed in the roto Installation note on the previous page. Lower the roto, bottom bearing first, into the bottom bearing plate (Figure 16). Wipe away any excess grease.
3. When complete, refer to Figure 17 for correct orientation.
Top Channel Installation
A minimum of two people is required to complete the installation of top channel.
1. Remove the cover from the top channel using a ⅛" Allen wrench (Figure 18).
2. Determine orientation before installing the top channel.
NOTE
The end of the top channel with the power outlet attached to it must be mounted over the yoke.
The end of the top channel with the large hole in the center and two smaller holes on either side must be mounted over the OV.
Fig. 18
⅛" Allen Wrench
Allen Head Screw
Top Channel
Grease
Page 12 support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Installation Instructions
Top Channel Installation (Cont)
3. With the help of two assistants, lift the top channel up and over roto, yoke and OV (Figure 19).
DANGER
Be sure that the feeder wire and/or any access control pad wiring is out of the way and is not caught between the top channel and the yoke, roto or OV, as this may damage the wires.
4. Align the top channel spline shaft with the roto cavity and carefully lower the top channel spline shaft into the roto cavity (Figure 20).
NOTE
Apply grease to the end of the spline shaft before inserting.
5. Once the top channel is seated firmly in place, use an Allen wrench to tighten the set screw (Figure 20).
6. Confirm roto is level and plumb.
Fig. 20
Top of Roto
Set Screw
Wide Spline in Gear Pattern
Wide Gap in Gear Pattern
Spline Shaft
Roto Cavity
Fig. 19
Top Channel
Installation Instructions support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Page 13
Top Channel Installation (Cont)
Fig. 21
½" x 1½" Hex Head Bolt
½" x 1½" Hex Head Bolt
½" Nut and Lock Washer
½" Nut and Lock Washer
7. The top channel mounting holes are located at each end of the top channel (Figure 21).
A. Yoke Side - Insert two ½" x 2¾" hex head bolts, from the underside of the top channel, up through the mounting holes and secure with two ½" lock washers and two ½" nuts (Figure 21A).
B. OV Side - Insert two ½" x 1½" hex head bolts, from the underside of the top channel, up through the mounting holes and secure with two ½" lock washers and two ½" nuts (Figure 21).
8. Hand tighten the top channel mounting hardware at this time using a 3/4" socket wrench and a 3/4" wrench.
Guard Plate Installation
1. Slide the wide end of the guard plate, (notched end first) between the top channel and the top of the yoke (Figure 22).
2. Insert one ½" x 1" hex head bolt and ½" flat washer, from the underside of the guard plate, up through the top channel mounting hole and secure with one ½" lock washer and one ½" nut.
3. Finger tighten the guard plate mounting hardware at this time.
Mounting Notches
½" x 1" Hex Head Bolt and ½" Flat Washer
½" Nut and Lock Washer
Guard Plate
Fig. 22
Mounting Hole
Page 14 support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Installation Instructions
1. Place the two halves of the top bearing cover over the top bearing and align the mounting holes.
2. Using an Allen wrench, Insert and tighten the six 10-32 x ½" Allen head mounting screws (Figure 23).
Mounting Screw
Bearing Cover Installation
Top Bearing Cover Installation
Bottom Bearing Cover Installation
1. Place the two halves of the bottom bearing cover over the bottom bearing and align the mounting holes.
2. Using a screwdriver, tighten the two mounting screws (Figure 24).
Fig. 23
Fig. 24
NOTE
For illustration and clarity purposes only, the bearing cover illustrations are shown without the surrounding sections.
Screwdriver
10-32 Allen Head Screw
Allen Wrench
Top Bearing Covers
Installation Instructions support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Page 15
Key turned 90°
Roto Top Channel
Guard Plate
Fig. 26
NOTE
When shipped, the keys are attached to the chassis on the inside of the top channel.
The key override switch manually unlocks the turnstile in the desired direction. Key override switches are installed in the top channel, on either side of the roto.
To engage the key override, turn the key 90°.
NOTE
Remove keys when complete and store in a safe location.
If the key override lock will not properly engage, please refer to the 'Troubleshooting' section.
This completes your installation of the MST.
If the MST is electrically controlled, please proceed to the "Electrical Wiring Instructions" section.
Key
Key Override Operation
Final Mechanical Installation Steps
Fig. 25
Drill
649 " Drill Bit
#10 x ¾" Phillips pan head screw
Screwdriver
NOTE
Be sure the guard plate and the yoke are aligned properly and flush before performing the following step(s).
Be sure that the turnstile is level before performing the following step(s). If it is not level, use shims as needed.
1. Ensure that all mounting hardware is tightened. The anchor bolts (11 total) and the top channel mounting bolts should be tightened to 40 ft-lbs using a torque wrench and appropriate sockets.
2. Using a drill and 9/64" drill bit, pre-drill six holes (three along each side of the yoke).
3. Insert and tighten six #10 x ¾" Phillips pan head screws (Figure 25).
4. Test the roto for binding when it is functional. If there is binding, loosen the mounting hardware and adjust as needed.
5. Test the roto for binding. If no binding occurs, retighten all mounting hardware.
Non-Override
Override
NOTE The key will always be parallel to the top channel in the override position.
The key will always be perpendicular to the top channel in the non-override position.
Page 16 support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Installation Instructions
Conduit Instructions
1. OV Installation
Stub-up at the base of the OV and run conduit though the OV and top channel to the junction box. Flex conduit must be run all the way to the junction box. (Figure 27A).
2. Top Channel Cover Installation
Run conduit to the top channel cover in one of the locations shown in (Figure 27B). Punch conduit hole at least 2.5" from the bottom of the top channel lid. Conduit must be run all the way to the junction box.
For electric models, flex conduit can be run through the vertical tube of the OV. Also, conduit may be attached directly to the top channel cover. After completing primary power and access control wiring, plug all unused holes in the top channel.
YokeFig. 27A Fig. 27B
Power Stub-Up
OV
2.5"
.5"
3"
2.5"
Flex Conduit
Conduit Location
Power
ON/OFF
Switch
10"
10"
Installation Instructions support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Page 17
Electrical Wiring Instructions
Use a licensed electrician for the following steps.
1. Remove the top channel cover.
2. Make sure the power on toggle switch is in the OFF position. If it is not, move the toggle switch to the OFF position (Figure 27B).
3. Using a screwdriver, remove the cover of the junction box.
4. Locate the power wires inside the junction box.
5. Run the primary power wires, coming in from either side of the top channel, through the knock-out.
NOTE
The junction box housing has circular knock-outs on the side of the box. Remove the most appropriate knock-out.
6. Secure primary power wires to the provided pig-tail in the junction box and secure with wire nuts. See Figures 28A &B for 110V & 220V configuration.
7. Tuck the excess wire into the junction box and re-attach the junction box cover.
8. Once power has been established, route the access control wires.
NOTE
If your model was purchased with the option of having a card reader installed, please refer to the installation instructions that come packaged with the card reader mounting plate.
110-120VAC, 50/60Hz, 35W (3A Fuse)
220-240VAC, 50/60Hz, 35W (3A Fuse)
To J4
220V Primary
Connect Ground Cable to Ground Stud
Brown Brown Black
Brown Transformer
Blue
To J4
Connect Ground Cable To Ground Stud
Black
White
110V Primary
Transformer
Fig. 28B
Fig. 28A
WARNING
Run permanent AC power wires to the unit. Primary side of transformer DC resistance is rated at 2.6-ohms. Use a licensed electrician to perform this procedure adhering to all local electrical codes.
In the event the transformer needs to be replaced, it must be replaced with Alvarado P/N 10-3008A (110V) or 10-3003F (220V) as specified in UL File BP20972, Projects 4787469780, 4787461699.
Page 18 support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Installation Instructions
Turnstile Control Board Layout Fig. 29
LEGEND
Item Name
A CCW Test Activation Switch (SW7)
B Access Control Activation - CCW
C Access Control Activation CW
D CW Activation Test Switch (SW6)
E DIP Switches (SW4)
F Green LED
G Fire Alarm System Connection - CW
H Fire Alarm System Connection - CCW
Clockwise Fail Lock
Counterclockwise Fail Lock
Timer - See Chart to the Right
Timer - See Chart to the Right
Feedback Pulse - 100ms
JS3 LED Option
STD Optics
AUX (Fire Alarm Input - N.O.)
Clockwise Fail Safe
Counterclockwise Fail Safe
Timer - See Chart to the Right
Timer - See Chart to the Right
Feedback Pulse - 300ms
JS2 LED Option
1st Sensor Optics
AUX (Fire Alarm Input - N.C.)
SW4 Layout
O N
D
IP
A
C G
D
E
J18 J3 J7
J4
J10 J9
J5
J8
J2
SW4
F
X 5 R G Y X 5 R G YCCW CCW CW CW
CCW CW
C C
W -C
N T
C W
-C N
T O
P T
IC
A
L S
E N
S O
R S
C N
T- R
E S
E T
J19
SW3
J11
B H
ACC GND REJ CLS GND OPN CNT COM ACC GND REJ CLS GND OPN CNT COM
TIMED DELAY RESET TIMER (Positions T3 and T4)
T3 T4
5 seconds
10 seconds
15 seconds
20 seconds (Default)
ON ON
ON OFF
OFF ON
OFF OFF
Entry Time Adjusting Control Switch Settings
JP1
J14
JP2
J17
J15
Fig. 29A
Fig. 29B
SW7 SW6
NOTE Default DIP switch settings pictured above are for Fail-lock/Fail-safe configurations.
Installation Instructions support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Page 19
* After approximately 4 seconds, voltage will drop to approximately 2.7VDC connected to the load of the solenoid.
Terminal Descriptions
BOARD NAME DESCRIPTION RATING EXPLANATION
J18 CCW Solenoid VDC wire connection - Counter Clockwise Direction
12 -
15.73VDC*,
1.53A
Connection for Counter Clockwise Solenoid. Universal polarity.
J18 CCW Solenoid VDC wire connection - Counter Clockwise Direction
12 -
15.73VDC*,
1.53A
Connection for Counter Clockwise Solenoid. Universal polarity.
J18 CW Solenoid VDC wire connection - Clockwise Direction
12 -
15.73VDC*,
1.53A
Connection for Clockwise Solenoid. Universal polarity.
J18 CW Solenoid VDC wire connection - Clockwise Direction
12 -
15.73VDC*,
1.53A
Connection for Clockwise Solenoid. Universal polarity.
SW7 CCW
Entry Activation Test Button
Allows user to test turnstile activation - Counter Clockwise Direction
N/A Depressing button simulates input to J3 ACC, “Entry Accept”. If turnstile solenoid “fires” after depressing button AND re-locks after a single rotation of the Roto or upon time out, the turnstile is functioning correctly in the Left Hand/Counter Clockwise Direction.
J3 ACC
Entry Accept
“Card Authorized” input connection from the access control system - Counter Clockwise Direction
0VDC,
18mA
This connection is used to tell the turnstile to unlock.
The ATC will accept a N.O. dry contact signal of .5 seconds to 2 seconds from the access control system and allow one rotation of the Roto before re-locking.
J3 GND
Ground
Ground wire connection from the access control system - Counter Clockwise Direction
0VDC,
18mA
Ground wire connection position for ACC and REJ contact signal.
J3 REJ
Entry Reject
“Card Reject” input connection from the access control system - Counter Clockwise Direction
0VDC,
18mA
This connection is used to tell the turnstile to remain locked. The access control system has determined that the card presented is unauthorized for entry.
J3 CLS
Close Passage
Connection for placing turnstile in locked “CLOSED” status - Counter Clockwise Direction
0VDC,
18mA
Providing a continuous dry contact at this terminal places the turnstile in a locked “CLOSED” mode. This mode overrides the access control system operation. If status lights are installed (Location J19) the red light will be illuminated continuously.
J3 GND
Ground
Ground wire connection for “OPN/CLS” lane control - Counter Clockwise Direction
0VDC,
18mA
Ground wire connection for “OPN/CLS” passage control.
J3 OPN
Open Passage
Connection for Fire Alarm System, or placing turnstile in “OPEN” status - Counter Clockwise Direction.
0VDC,
18mA
Providing a continuous dry contact at this terminal places the turnstile in an “OPEN” mode. Typically, this terminal is used to connect the fire alarm system (normally open type) when the turnstile is configured for counterclockwise rotation in the exit direction.
J3 CNT
Passage Count
Confirmation signal upon turnstile rotation
- Counter Clockwise Direction
0VDC,
18mA
Outputs a dry contact upon rotation of the turnstile.
This feature can be used to output a “count” signal to an external system such as Alvarado’s GateWatch or to provide feedback to the access control system that a turnstile rotation has taken place.
J3 COM
Passage Count
Confirmation signal upon turnstile rotation - Counter Clockwise Direction
0VDC,
18mA
Common dry contact connection for CNT count signal output. See J3 CNT description.
J10 X5RGY-
CCW
Connection for Activation Lights - Counter Clockwise Direction
5VDC,
50mA
Connection for JS2 and JS3 activation lights.
J9 X5RGY-
CW
Connection for Activation Lights - Clockwise Direction
5VDC,
50mA
Connection for JS2 and JS3 activation lights.
J7 ACC
Entry Accept
“Card Authorized” input connection from the access control system - Clockwise Direction
0VDC,
18mA
This connection is used to tell the turnstile to unlock. The ATC will accept a N.O. dry contact signal of .5 seconds to 2 seconds from the access control system and allow one rotation of the Roto before re-locking.
J7 GND
Ground
Ground wire connection from the access control system - Counter Clockwise Direction
0VDC,
18mA
Ground wire connection position for ACC and REJ contact signal.
J7 REJ
Entry Reject
“Card Reject” input connection from the access control system - Counter Clockwise Direction
0VDC,
18mA
This connection is used to tell the turnstile to remain locked.
The access control system has determined that the card presented is unauthorized for entry.
Page 20 support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Installation Instructions
Terminal Descriptions (Cont)
J7 OPN
Open Passage
Connection for Fire Alarm System or placing turnstile in “OPEN” status - Clockwise Direction
0VDC,
18mA
Providing a continuous dry contact at this terminal places the turnstile in an “OPEN” mode. Typically, this terminal is used to connect the fire alarm system (normally open type) when the turnstile is configured for clockwise rotation in the exit direction (default).
J7 CNT
Passage Count
Confirmation signal upon turnstile rotation
- Clockwise Direction
0VDC,
18mA
Outputs a dry contact upon rotation of the turnstile.
This feature can be used to output a “count” signal to an external system such as Alvarado’s GateWatch or to provide feedback to the access control system that a turnstile rotation has taken place.
J7 COM
Passage Count
Confirmation signal upon turnstile rotation - Clockwise Direction
0VDC,
18mA
Common dry contact connection for CNT count signal output. See J3 CNT description.
SW6 CW Entry Activation Test Button
Allows user to test turnstile activation - Clockwise Direction
N/A Depressing button simulates input to J7 ACC, “Entry Accept”. If turnstile solenoid “fires” after depressing button AND re-locks after a single rotation of the Roto or upon time out, the turnstile is functioning correctly in the Clockwise Direction.
J2 CCW-CNT Output of contact closure upon turnstile rotation – Counter Clockwise Direction
1.06VDC,
5µA
Single throw, relay output for connection to Alvarado battery powered, digital counter.
J8 CW-CNT Output of contact closure upon turnstile rotation - Clockwise Direction
1.06VDC,
5µA
Single throw, relay output for connection to Alvarado battery powered, digital counter.
J5 Optical Sensors
Connection for sensors 3.3VDC, 16.5mA
The ATC uses input from the sensors to monitor rotation of the Roto.
J11 CNT-
RESET
Connection for counter reset key switch 1.06VDC, 5µA
N.O. contact connection if counter wires are attached to J2 and/or J8 connections. A 2-position electrical key switch is connected here to provide a reset to the individual counters.
SW3 Reset counters
Local Battery Counter Reset Switch N/A If counter wires are attached to the board (J2 and J8), depressing this button will reset the counters. If two counters are installed and wired, both counters will be reset.
J19 EL Light Boards Connector
Connection for EL light boards 12VDC, 242mA
If red/green status lights are used, the green light signifies that the turnstile is ready to accept an activation for the direction shown. When the CLS and GND connection is closed, the red light will be illuminated and signifies that the turnstile will not accept an activation. Refer to description for CLS on J3 and J7.
J4 Power Input
Connection for low-voltage power 13.5VAC, 4.33A
The ATC accepts 10VAC or 13.5VDC power. If primary power is not run to the turnstile, low-voltage power is connected here. The green ground wire must be grounded to the chassis.
JP1 EL Lights Voltage Jumper
Sets voltage supplied to the EL light boards.
N/A Set voltage to 12VDC.
JP2 JS2/JS3
Lights Voltage Jumper
Sets voltage supplied to the JS2/JS3 light boards.
N/A Set voltage to 5VDC.
J14 N/A Not used. N/A N/A
J15 Program-ming Port
Not applicable to end-users. N/A N/A
J17 N/A Not used. N/A N/A
BOARD NAME DESCRIPTION RATING EXPLANATION
J7 GND
Ground
Ground wire connection for “OPN/CLS” lane control - Clockwise Direction
0VDC,
18mA
Ground wire connection for “OPN/CLS” passage control.
J7 CLS
Close Passage
Connection for placing turnstile in “OPEN” status - Counter Clockwise Direction
0VDC,
18mA
Providing a continuous dry contact at this terminal places the turnstile in a locked “CLOSED” mode. This mode overrides the access control system operation. If status lights are installed (Location J19) the red light will be illuminated continuously.
Installation Instructions support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Page 21
SW4 DIP Switch Descriptions
Sets solenoid control for the Clockwise direction in fail lock configuration. Power is applied to solenoid upon activation signal to release lock arm for rotation.
CWFL FS Sets solenoid control for the Clockwise direction in fail safe configuration. Power is applied to solenoid for locked condition and removed upon activation signal to release lock arm for rotation.
Sets solenoid control for the Counter Clockwise direction in fail lock configuration. Power is applied to solenoid upon activation signal to release lock arm for rotation.
CCWFL FS Sets solenoid control for the Counter Clockwise direction in fail safe configuration. Power is applied to solenoid for locked condition and removed upon activation signal to release lock arm for rotation.
Adjusts automatic re-lock timing. See Figure 28A for settings.
T3 T3ON Adjusts automatic re-lock timing. See Figure 28A for settings.
Adjusts automatic re-lock timing. See Figure 28A for settings.
T4 T4ON Adjusts automatic re-lock timing. See Figure 28A for settings.
Sets Length of time of contact closure on CNT and COM feedback to 100ms.
100 FBPL Sets Length of time of contact closure on CNT and COM feedback to 300ms.
Set switch to left when using Red/Yellow/Green Activation Lights.
JS3 JS2 Set switch to right when using Red/Green Activation Lights.
Sets operation to standard optical sensor configuration for passage feedback after second sensor detection.
STD ROFP Sets operation to custom optical sensor configuration for passage feedback on first sensor detection.
Configures OPN terminals as normally open (N.O.).
OPN inputs are used for fire alarm / free passage modes.
AUX AUX Configures OPN terminals as normally closed (N.C.).
OPN inputs are used for fire alarm / free passage modes.
SW4 Layout (Figure 29A)
LEFT / OFF Switch Position
Switch Position
RIGHT / ON
Page 22 support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Installation Instructions
Print and distribute this page to inform users how to properly operate the turnstile.
NOTES
• Always walk slowly through the turnstile
• Always use caution when using the turnstile
User Activation and Passage Instructions
Follow the steps below on how to use the turnstile.
1. The turnstile should always be in the “Home” position before access is requested (i.e. an access control card is presented to the card reader). If the turnstile is not in the “Home” position, manually reposition the roto section (the arms) to the “Home” position before requesting access (Figure 30).
2. Request access (i.e. present an access control card to the card reader) and activate the turnstile. Listen for the turnstile to unlock (the solenoid will “fire” and make a clicking sound) and (if applicable) look for the green activation light.
3. Immediately step into the turnstile (Figure 31). Keeping your arms extended, gently push on roto arm section “A” and slowly walk through the turnstile (Figure 31).
Stay near the yoke and take short steps. Once you have traveled through the passage area move out of the way of the turnstile arms.
CAUTION
Never grab roto arm section “C” and pull it in front of you. Doing this will result in the roto section stopping suddenly (after rotating 120°) before you are all of the way through the turnstile.
CAUTION
After walking through the turnstile, the turnstile arms will continue to rotate, completing the 120° rotation. Taking long steps could cause the trailing arm section to strike your heels. Heel and arm guards are an option that can be purchased from Alvarado.
4. Step completely out of the turnstile.
CAUTION
If a patron does not complete the full rotation before the predefined delay time-out period, the turnstile will re-lock. Based upon the actual position of the patron when the turnstile re-locks, the patron will either complete the full rotation or will be required to back out of the turnstile and initiate another entry access request.
Fig. 30
"Home" Position
A
Fig. 31
B
C
Installation Instructions support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Page 23
Post-Installation Checklist
1 Electrical
Validate that electrical connections meet local code requirements.
2 Operation
Validate key override operation.
Ensure key overrides are in proper operational position.
Validate turnstile operation in conjunction with the installed access system. Perform multiple activations and rotations in each direction.
Ensure that desired outputs are attached and operational.
3 Attachment
Check that mounting bolts and screws are secure and tightened per the requirements in this manual.
Top and bottom bearing covers are installed.
Top channel cover is in place.
4 Finish
Stainless Steel (uncoated) – wipe down the entire turnstile with clean water or use the Alvarado recommended commercial products (see Cleaning and Maintenance Section).
Stainless Steel (units with optional coating) – wipe down entire turnstile with clean water.
Hot Dipped Galvanized – wipe down the stainless steel top channel as indicated above. Repair any damaged galvanized areas with zinc-rich paint following the manufacturer’s instructions. An explanatory document describing the ASTM recommended repair process is available from the American Galvanizer Association website.
Powder coated - wipe down entire turnstile with clean water. Repair areas that may have been damaged during the installation process. Touch up paint can be purchased from Alvarado.
Acrylic - wipe down acrylic surfaces with Alvarado recommended commercial products (see Cleaning and Maintenance Section).
5 User Instructions
Train responsible personnel on turnstile operation.
Provide the User Activation and Passage Instructions contained in this manual to responsible personnel.
6 Manual Handoff
Provide this manual to responsible personnel.
Page 24 support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Installation Instructions
CWCCW
Troubleshooting
Fig. 32
A Solenoid (Fail-safe) I Solenoid Spring (Fail-lock)
B Solenoid Plunger (Fail-safe) J Return Spring (Fail-lock)
C Return Spring (Fail-safe) K Lock Arm Mounting Bolt (Fail-lock)
D Solenoid Spring (Fail-safe) L Lock Arm (Fail-lock)
E Lock Arm Mounting Bolt (Fail-safe) M Optical Sensors
F Lock Arm (Fail-safe) N Optical Sensor Mounting Plate
G Solenoid (Fail-lock) O Encoder Wheel
H Solenoid Plunger (Fail-lock) P Encoder Flag
Fail-Lock Direction
FAIL-SAFE / FAIL-LOCK CONFIGURATION
Fail-Safe Direction
AB
C
D
E F
G
H
I J
K L
M
N
O
LK
J
I H
F E
C
D
B
O O
N N
M M PP
NOTES
The steps contained in this Troubleshooting section are the most common issues that may arise during the operation of the unit. If the provided steps do not resolve the issue, please contact Alvarado Technical Support (909-591-8431).
The built-in key locks provide override functionality. Verify that locks are not in the override position before performing any troubleshooting procedures. Please see "Key Override Operation" section for instructions.
WARNING
If at any time during the troubleshooting process you will be exposed to live wires (i.e. opening the junction box), ensure the turnstile is powered off at the supply circuit before beginning.
Installation Instructions support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Page 25
Fail-safe direction will not re-lock
Troubleshooting (Cont)
Fail-safe direction will not unlock
Power Issues
Cause Solution Reference
Green LED is OFF 1. Verify that the power switch is in the ON position and that primary power is provided to the turnstile.
2. Check the fuse; replace if bad.
3. Check primary power input contacts (J4) on the control board are secure and tight.
If the above steps above did not resolve the issue, contact Technical Support.
Fig. 21A - Power switch is located on the J-box inside the Top Channel.
Fig. 21A - Fuse is located on the J-box inside the Top Channel.
Fig. 28
Mechanical Issues
Cause Solution Reference
Incorrect springs Verify that the springs on your unit are identical to the springs used in the illustration. Fig. 32 (C) (D)
Springs attached incorrectly Verify that the springs are attached correctly and in the correct mounting holes.
Mounting hole locations on unit should match the locations that are shown in the illustration.
Fig. 32 (C) (D)
Incorrect spring tension Depending on manufacturing date, adjust either the solenoid position or lock arm tab. Appendix E
Lock arm binding or sticking Clean and lubricate (see "Lubrication" section). If the lock arm is still binding, contact Technical Support.
Fig. 32 (F)
Solenoid plunger is binding 1. Check for and remove any debris from the solenoid plunger and cavity area.
2. Use an alcohol-moistened Q-tip to clean the solenoid plunger. Do not use water or lubricate the solenoid plunger. The solenoid is designed for dry operation.
Fig. 32 (A) (B)
Key Override will not engage Confirm key override is fully engaging with lock arm. Adjust as needed. Appendix F
If the steps listed above did not solve the issue, contact Technical Support.
Power Issues
Cause Solution Reference
Fig. 21A - Power switch is located on the J-box inside the Top Channel.
Fig. 21A - Fuse is located on the J-box inside the Top Channel.
Fig. 28
Electronic Issues
Cause Solution Reference
Access Control / Control Board
A. Disconnect all wires from terminal blocks J3 and J7.
B. Press the test switch (SW6 or SW7) and note if lock arm unlocks.
C. If the lock arm unlocks, then the turnstile is operating correctly. The issue is most likely with the access control system. Contact Technical Support.
Fig. 28 (J7) (J3) Fig. 28 (A) (D)
Mechanical Issues
Cause Solution Reference
Incorrect springs Verify that the springs on your unit are identical to the springs used in the illustration. Fig. 32 (C) (D)
Springs attached incorrectly Verify that the springs are attached correctly and in the correct mounting holes.
Mounting hole locations on unit should match the locations that are shown in the illustration.
Fig. 32 (C) (D)
Incorrect spring tension Depending on manufacturing date, adjust either the solenoid position or lock arm tab. Appendix E
Lock arm binding or sticking Clean and lubricate (see "Lubrication" section). If the lock arm is still binding, contact Technical Support.
Fig. 32 (F)
Solenoid plunger is binding 1. Check for and remove any debris from the solenoid plunger and cavity area.
2. Use an alcohol-moistened Q-tip to clean the solenoid plunger. Do not use water or lubricate the solenoid plunger. The solenoid is designed for dry operation.
Fig. 32 (A) (B)
Key Override will not engage Confirm key override is fully engaging with lock arm. Adjust as needed. Appendix F
Page 26 support@alvaradomfg.com +1(909) 591-8431 www.alvaradomfg.com Installation Instructions
Troubleshooting (Cont)
Fail-lock direction will not unlock
If the steps listed above did not solve the issue, contact Technical Support
If the steps listed above did not solve the issue, contact Technical Support.
Fail-safe direction will not re-lock (cont)
Electronic Issues
Cause Solution Reference
Optical sensors are dirty Use an alcohol-moistened Q-tip to clean the optical sensor(s) and retest. Fig. 32 (M)
Optical sensors misaligned Verify that cam flag passes freely through the optical sensor assembly. Fig. 32 (P)
Access Control / Control Board
A. If the ‘OPN’ signal is connected to the access control system, verify that the ‘OPN’ signal is not being provided with a continuous dry contact.
B. Press SW6 and swipe a business card clockwise through the optical sensors.
C. If the unit re-locks, the problem lies with the access control system.
D. If the unit does not re-lock, but re-locks after time out, proceed with optical sensors troubleshooting.
Fig. 28 (J3) (J7) (See Terminal Descriptions - J3 'OPN' on Page 17 J7 'OPN' on Page 18)
Optical sensors are installed incorrectly
A. Press SW6 and swipe a business card clockwise through the optical sensors.
B. The green LED on the control board should turn OFF, and the unit should re-lock.
If the unit re-locks, then optical sensors are installed correctly.
C. If the unit does not re-lock, press SW6 again and swipe a business card counterclockwise through the optical sensors.
D. If the green LED on the control board turns OFF, and the unit re-locks, then the optical sensors are installed incorrectly.
E. Using a Phillips head screwdriver, remove the optical sensors from the optical sensor mounting plate and switch the mounting positions. Repeat step A.
NOTE: The business card must pass through both optical sensors for a correct reading.
Fig. 28 (D) (F) Fig. 32 (M)
Fig. 32 (M) (N)
Optical sensors are bad If the steps above did not resolve the problem, the issue most likely lies with the optical sensors. Please contact Technical Support.
Power Issues
Cause Solution Reference
Fig. 21A - Power switch is located on the J-box inside the Top Channel.
Fig. 21A - Fuse is located on the J-box inside the Top Channel.
Fig. 28
Mechanical Issues
Cause Solution Reference
Incorrect springs Verify that the springs on your unit are identical to the springs used in the illustration. Fig. 32 (I) (J)
Springs attached incorrectly Verify that the springs are attached correctly and in the correct mounting holes.
Mounting hole locations on unit should match the locations that are shown in the illustration.
Fig. 32 (I) (J)
Incorrect spring tension Depending on manufacturing date, adjust either the solenoid position or lock arm tab. Appendix E
Lock arm binding or sticking Clean and lubricate (see "Lubrication" section). If the lock arm is still binding, contact Technical Support.
Fig. 32 (L)
Solenoid plunger is binding 1. Check for and remove any debris from the solenoid plunger and cavity area.
2. Use an alcohol-moistened Q-tip to clean the solenoid plunger. Do not use water or lubricate the solenoid plunger. The solenoid is designed for dry operation.
Fig. 32 (G) (H)
Key Override will not engage Confirm key override is fully engaging with lock arm. Adjust as needed. Appendix F
Electronic Issues
Cause Solution Reference
Access Control / Control Board
A. Disconnect all wires from terminal blocks J3 and J7.
B. Press the test switch (SW6 or SW7) and note if lock arm unlocks.
C. If the lock arm unlocks, then the issue lies with the access control…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .