7.01_Award_N0010421DPC01_N0010426FPC00.pdf

PDF 352 KB Posted

Attached to
CIRCUIT CARD ASSEMB
Solicitation number
N0010426FPC00
Issued by

About this file

This is a Delivery Order for Supplies or Services (DD Form 1155) issued by the Naval Supply Systems Command (NAVSUP) Weapon Systems Support Mechanics division on February 18, 2026, for the repair and evaluation of two circuit card assemblies. The order references contract N00104-26-F-PC00 and is administered by DCMA Southeast in Orlando, Florida. The contractor is Northrop Grumman Systems Corp, located in Charlottesville, Virginia. The order contains two Contract Line Items (CLINs): CLIN 0001 for NSN 7HH 5998-01-331-2321 (3 units at $2,654.82 each, totaling $7,964.46) and CLIN 0002 for NSN 7HH 5998-01-391-3393 (9 units at $3,640.38 each, totaling $32,763.42). The total order value is $40,727.88. Both items require evaluation, repair, and/or modification with delivery scheduled for July 8, 2026. Inspection and acceptance are to occur at the contractor's location at source, with all items shipped to W25G1U (DLA Distribution, New Cumberland, Pennsylvania). Payment terms are net 30 days via Electronic Funds Transfer (EFT), and invoices should be submitted to DFAS Columbus Center.

The repair work must comply with the contractor's standard practices, technical manuals, and approved repair standards in accordance with the original manufacturer's specifications and drawings. Items must be marked per MIL-STD-129 and packaged per MIL-STD-2073. Both items are identified with "A" condition stock designation and carry a Return-to-Availability-Time (RTAT) of 140 days with zero throughput constraint and an induction expiration date of day 237. The order incorporates numerous Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS) clauses addressing cybersecurity, property management, hazardous materials, quality assurance, and compliance requirements. Configuration management provisions require contractor maintenance of equipment baseline configurations and submission of Engineering Change Proposals and Requests for Variance through the cognizant Defense Contract Management Agency office. The order specifies that induction covers a one-year period, with contractor notification of actual induction numbers due within 30 days of the induction deadline and excess quantities and funds to be reduced via modification within 60 days thereafter.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF Form Approved ORDER FOR SUPPLIES OR SERVICES OMB No. 0704-0187

Expires Aug 31, 1992 5. CERTIFIED FOR NA- TIONAL DEFENSE UNDER 2. DELIVERY ORDER NO. 4. REQUISITION/PURCH REQUEST NO. 1. CONTRACT/PURCH ORDER NO. 3. DATE OF ORDER DPAS 15 CRF 700

DO

6. ISSUED BY 7. ADMINISTERED BY (If other than 6) CODE CODE 8. DELIVERY FOB

DEST

OTHER

(See Schedule if other)

11.MARK IF BUSINESS IS FACILITY CODE CODE 10. DELIVER TO FOB POINT BY (Date) 9. CONTRACTOR

SMALL

Q Q 12. DISCOUNT TERMS SMALL DISADVANTAGED NAME AND ADDRESS WOMEN-OWNED

13. MAIL INVOICES TO

Q Q

14. SHIP TO 15. PAYMENT WILL BE MADE BY CODE CODE

MARK ALL PACKAGES AND PAPERS WITH CONTRACT OR

ORDER NUMBER

16. T O DELIVERY This delivery order is issued on another Government agency or in accordance with and subject to terms and conditions of above numbered contract. Y R P D Reference your furnish the following on terms specified herein. E E R PURCHASE O THE CONTRACTOR HEREBY ACCEPTS THE OFFER REPRESENTED BY THE NUMBERED PURCHASE ORDER AS IT MAY PREVIOUSLY HAVE BEEN OR IS NOW ACCEPTANCE. F MODIFIED, SUBJECT TO ALL OF THE TERMS AND CONDITIONS SET FORTH, AND AGREES TO PERFORM THE SAME.

NAME OF CONTRACTOR SIGNATURE TYPED NAME AND TITLE DATE SIGNED

If this box is marked, supplier must sign Acceptance and return the following number of copies:

17. ACCOUNTING AND APPROPRIATION DATA/LOCAL USE

22. 23. 18. 19. 20. 21. QUANTITY ORDERED/ SCHEDULE OF SUPPLIES/SERVICES UNIT AMOUNT ITEM NO. UNIT PRICE ACCEPTED*

Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gatheringand maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection ofinformation, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0187), Washington, DC 20503. Please DO NOT RETURN your form toeither of these addresses. Send your completed form to the procurement official identified in Item 6.

24. UNITED STATES OF AMERICA 25. TOTAL * If quantity accepted by the Government is same as quantity ordered indicate by X. If different, enter 29. actual quantity accepted below quantity ordered and encircle. DIFFERENCES

BY: CONTRACTING/ORDERING OFFICER

27. SHIP. NO. 26. QUANTITY IN COLUMN 20 HAS BEEN 28. D.O. VOUCHER NO. 30. INITIALS RECEIVED ACCEPTED, AND CONFORMS TO THE INSPECTED CONTRACT EXCEPT AS NOTED PARTIAL 33. AMOUNT VERIFIED CORRECT FOR 32. PAID BY

FINAL

31. PAYMENT 34. CHECK NUMBER DATE SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

COMPLETE 36. I certify this account is correct and proper for payment

PARTIAL 35. BILL OF LADING NO.

FINAL SIGNATURE AND TITLE OF CERTIFYING OFFICER DATE

38. RECEIVED BY 40. TOTAL CONTAINERS 41. S/R ACCOUNT NUMBER 42. S/R VOUCHER NO. 37. RECEIVED AT 39. DATE RECEIVED

CONTRACTOR MUST SUBMIT FOUR COPIES OF INVOICE PREVIOUS EDITIONS ARE OBSOLETE EDADD Form 1155, MAY 90

N0010421DPC01 N00104-26-F-PC00 2026 FEB 18 25276-0008

DO-A3

N00104 S1002A

NAVSUP WEAPON SYSTEMS SUPPORT MECH DCMA SOUTHEAST

5450 CARLISLE PIKE 3555 MAGUIRE BLVD

MECHANICSBURG,PA 17050-2411 ORLANDO,FL 32803-3799 X

BUYER: T. ARROYO/N711.17 SCD: B

PHONE: (717) 605-2383

03956

SEE SCHEDULE

NORTHROP GRUMMAN SYSTEMS CORP

ATTN: ALYSON WEST NET 30 DAYS

1070 SEMINOLE TRAIL

CHARLOTTESVILLE,VA 22901-2827

POC: (434) 974-2000 SEE BLOCK 15

HQ0338

SEE SCHEDULE DFAS - COLUMBUS CENTER

SOUTH ENTITLEMENT OPERATIONS

P O BOX 182317

COLUMBUS,OH 43218-2317

EFT:T

X

RFRNC NEGOTIATED AWARD N0010421DPC01 DATED 21 JUN 11

SEE SECTION G

SEE SCHEDULE

$40,727.88

KLMNOPQRSTD. FORD

PAGES

OFPAGEREFERENCE NO. OF DOCUMENT BEING CONTINUED

NAME OF OFFEROR OR CONTRACTOR

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

N00104-26-F-PC00 2 34

NORTHROP GRUMMAN SYSTEMS CORP

EVALUATE, REPAIR AND/OR MODIFY

0001 NSN 7HH 5998-01-331-2321 GL

CIRCUIT CARD ASSEMB SHELF LIFE 0-00

SEE TECHNICAL REQUIREMENTS IN SECTIONS C, D, E, AND ATTACHMENTS

HM QUP ICQ PMT CD PM WM CUD CT UC LP IC UCL SP MK PACK UNIT PKWT UNIT PKCU OPI

N 001 000 GX 1 00 K3 LT B ED A 00 B 39 EFF 1.9 0.206 M

PACKAGING IS IN ACCORDANCE WITH MIL-STD-2073

INSPECT AT SOURCE

ACCEPT AT SOURCE

SHIP TO

0001AA DEL BY: 2026 JUL 08 ACRN: AA TP: 3 W25G1U 3 EA $2,654.82 $7,964.46

PR N00104-26-U-0001 DO-A3

M/F: "A" CONDITION STOCK

NOTE:

RTAT=0140

Throughput Constraint=0000/month Induction Expiration Date=237

0002 NSN 7HH 5998-01-391-3393

CIRCUIT CARD ASSEMB SHELF LIFE 0-00

SEE TECHNICAL REQUIREMENTS IN SECTIONS C, D, E, AND ATTACHMENTS

HM QUP ICQ PMT CD PM WM CUD CT UC LP IC UCL SP MK PACK UNIT PKWT UNIT PKCU OPI

N 001 000 GX 1 00 K3 LT B ED A 00 B 39 EFF 0.5 0.167 M

PACKAGING IS IN ACCORDANCE WITH MIL-STD-2073

NOTE:

INSPECT AT SOURCE

ACCEPT AT SOURCE

SHIP TO

0002AA DEL BY: 2026 JUL 08 ACRN: AA TP: 3 W25G1U 9 EA $3,640.38

PR N00104-26-U-0002 DO-A3 $32,763.42

M/F: "A" CONDITION STOCK

CONTINUED ON NEXT PAGE

PAGES

OFPAGEREFERENCE NO. OF DOCUMENT BEING CONTINUED

NAME OF OFFEROR OR CONTRACTOR

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

N00104-26-F-PC00 3 34

NORTHROP GRUMMAN SYSTEMS CORP

CLIN 0002, NIIN 01-391-3393 CONT.

NOTE:

RTAT=0140

Throughput Constraint=0000/month Induction Expiration Date=237

AWARD NOTES:

This order is issued under and pursuant to the provisions of the Long Term Contract (LTC). The terms and conditions of the LTC are hereby incorporated by reference and, except as provided herein by this order, remain in full force and effect. If any conflict arises in the terms of this order versus the terms in the base contract, the terms of the base contract shall apply.

NIINs not on the Contractor's Mini Stock Point at the time of shipping shallbe shipped to W25G1U.

POC EMAIL: TAYLOR.R.ARROYO2.CIV@US.NAVY.MIL

N00104-26-F-PC00

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

WSSTERMBA00

CONTACT INFORMATION

When a DCMA office is shown on a Contract/Purchase Order, the Administrative Contracting Officer (ACO) is the primary point of contact and all inquiries shall initially be directed to that office for necessary action.

Inquiries and correspondence directed to the Post Award PCO should be addressed as follows:

Code: ( <N711.17> ) Weapon System LRC: ( <BAF> ) Telephone: ( <771-229-2149> ) E-Mail: ( <taylor.r.arroyo2.civ@us.navy.mil> )

In the event that the listed PCO contact information is no longer valid and a follow-on PCO cannot be identified, contact itimp.wss.fct@navy.mil.

PART I - THE SCHEDULE

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

CLIN: 0001

NIIN: 013312321 ACTIVITY USE ONLY: TDP VERSION NO.: 003

ITEM NAME: CIRCUIT CARD ASSEMB

1. SCOPE

1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the

CIRCUIT CARD ASSEMB .

2. APPLICABLE DOCUMENTS

2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.

2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.

2.2

DOCUMENT REFERENCES

SPEC NO. SLASH NO. PART NO REV DATE DISTR CD AMEND CHG NTC SUPP

MIL-STD-129 R 24 MAY 18 A 01

3. REQUIREMENTS

3.1 Cage Code/Reference Number Items - The CIRCUIT CARD ASSEMB repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures.

CAGE___Ref. No.

<03956 1979023>

3.2 Marking - This item shall be physically identified in accordance with <MIL-STD-129> .

3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:

Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number.

Code 2: Assembly (or set or kit) not furnished - Used following detail parts.

Code 3: Part not furnished separately - Use assembly.

Code 4: Part redesigned - Old and new parts are completely interchangeable.

Code 5: Part redesigned - New part replaces old. Old part cannot replace new.

Code 6: Part redesigned - Parts not interchangeable.

3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection.

If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part.

The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard.

If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned.

These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.

Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided:

Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere.

CLIN: 0002

NIIN: 013913393 ACTIVITY USE ONLY: TDP VERSION NO.: 003

ITEM NAME: CIRCUIT CARD ASSEMB

1. SCOPE

1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the

CIRCUIT CARD ASSEMB .

2. APPLICABLE DOCUMENTS

2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.

2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.

3. REQUIREMENTS

3.1 Cage Code/Reference Number Items - The CIRCUIT CARD ASSEMB repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures.

CAGE___Ref. No.

<03956 1980513>

3.2 Marking - This item shall be physically identified in accordance with <MIL-STD-130, REV N, 16 NOV 2012> .

3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:

Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number.

Code 2: Assembly (or set or kit) not furnished - Used following detail parts.

Code 3: Part not furnished separately - Use assembly.

Code 4: Part redesigned - Old and new parts are completely interchangeable.

Code 5: Part redesigned - New part replaces old. Old part cannot replace new.

Code 6: Part redesigned - Parts not interchangeable.

WSSTERMCZ05

CONFIGURATION MANAGEMENT - MARITIME

1.0 Configuration Management

1.1 The cognizant systems command (SYSCOM), Naval Sea Systems Command (NAVSEA) or Naval Information Warfare Systems Command (NAVWAR), Program Manager will maintain configuration control and change authority for all items in this contract.

1.2 In accordance with the configuration management provisions of this contract, the Contractor must maintain the total Equipment baseline configuration of the parts on this contract including, but not limited to, hardware, software and firmware.

NOTE: The latest revisions of the DOD Forms referenced in this term can be found at https://www.esd.whs.mil/dd. The latest revisions of the DIDs referenced in this term can be found at https://quicksearch.dla.mil/.

2.0 Engineering Changes

WSSTERMCZ05 (CONT)

CONFIGURATION MANAGEMENT - MARITIME

2.1 The Government will not be responsible for any contract delay or disruption or any increased costs of performance of the Contractor due to a misclassification of an Engineering Change Proposal (ECP) by the Contractor, including those costs associated with replacement of delivered items resulting from such a misclassification. ECP's are classified as either Class I (Major) or Class II (Minor). For detailed classification criteria refer to DD Form 1692 instructions sheet. ECPs must be prepared in accordance with DI-SESS-80639E, Engineering Change Proposal (ECP).

NOTE: Any ECP or notification of an ECP submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS CM Team at usn.philadelphia.navsupwssphil.mbx.configuration-management@us.navy.mil.

2.1.1 Class I (Major) Changes: The Contractor must coordinate with the cognizant SYSCOM Program Office prior to any Class I ECP submission. The Contractor must notify the Procurement Contracting Officer (PCO) of any pending or approved Class I engineering changes with another Government activity that the Contractor proposes to incorporate under this contract. The cognizant SYSCOM Program Office will approve or disapprove of Class I changes. Any approved Class I change may necessitate contract changes by the PCO, which changes may be handled under the Changes clause of this contract, FAR 52.243-1 The Contractor must not implement a Class I change on this contract until a contract modification is issued by the PCO.

2.1.2 Class II (Minor) Changes: Class II changes must be submitted to the cognizant Defense Contract Management Agency (DCMA) Contract Management Office (CMO), or to the Supervisor of Shipbuilding (SUPSHIP) Groton, for concurrence in classification and may be implemented only upon receiving DCMA, SUPSHIP, or NAVSEA/NAVWAR Technical Warrant Holder (TWH) concurrence. On Navy Special Emphasis Program contracts/purchase orders, the Contractor must submit the Class II (Minor) change to the PCO for approval or disapproval. Class II changes must be made at no additional cost to the Government.

2.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a Class I or Class II ECP.

3.0 Variances

3.1 The Contractor must not deliver any item for acceptance by the Government that incorporates a known departure from product definition information unless a Request for Variance (RFV) has been approved. Authorized variances are a temporary departure from the requirements only and do not authorize a change to the item's configuration baseline.

RFVs are classified as Critical, Major, or Minor. For detailed classification criteria refer to the DD Form 1694 instructions sheet. Variance requests must be prepared in accordance with DI-SESS-80640E - Request for Variance

(RFV).

NOTE: Any RFV submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS RFV Review Team at usn.philadelphia.navsupwssphil.mbx.rfv-review-team@us.navy.mil.

3.1.1 Critical/Major Variances: The Contractor must submit all critical/major variance requests via DCMA or SUPSHIP and the PCO, to the SYCOM Program Office or their delegated representative, for approval or disapproval. All approved critical/major variances require a contract modification by the PCO prior to final inspection and acceptance of the items.

3.1.2 Minor Variances: For minor RFVs, delivery and/or shipment of such items under this contract is not permitted until the request is approved by the cognizant DCMA CMO, SUPSHIP, or SYSCOM TWH. On Navy Special Emphasis Program contracts/purchase orders, the Contractor must submit minor variance requests via DCMA or SUPSHIP and the PCO, to the SYSCOM Program Office or their delegated representative, for approval or disapproval.

3.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a major/critical or minor variance.

(12-23)

PART I - THE SCHEDULE

SECTION D

PACKAGING AND MARKING

CLIN: 0001

NIIN: 013312321 ACTIVITY USE ONLY: TDP VERSION NO.: 003

ITEM NAME: CIRCUIT CARD ASSEMB

5. PACKAGING

5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.

MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

CLIN: 0002

NIIN: 013913393 ACTIVITY USE ONLY: TDP VERSION NO.: 003

ITEM NAME: CIRCUIT CARD ASSEMB

5. PACKAGING

5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.

MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

WSSTERMDZ03

PRESERVATION, PACKAGING, PACKING AND MARKING

The contractor shall preserve, package, pack and mark all items as cited below. Where specifications or standards are cited herein the latest revision of that specification or standard shall apply.

1. PRESERVATION REQUIREMENTS

a. SYSTEM STOCK SHIPMENTS - The contractor shall preserve all items intended to enter the military distribution system for stock in accordance with the MIL-STD-2073-1, "Standard Practice for Military Packaging", Packaging Requirements Code specified in the Section B, Part I of the Schedule. When a Specialized Preservation Code/Method of Preservation (MOP) (Table J-Ia) is specified, and one or more of the following packaging fields (WM, CUD, CT, UC) value is a 00 (numeric), the Specialized Preservation/MOP procedure and materials takes precedence. Contractors should disregard the LP field and third digit of the PACK field and use the Unit Container Level (UCL) to identify the level of packing protection the unit container meets for packing requirements. When HM = D, the item is regulated in accordance with Title 49 Code of Federal Regulations (CFR); when HM = N the item is not regulated for transportation.

1) When a specified packaging material has an associated Qualified Products List (QPL), the contractor shall use only packaging materials produced by a manufacturer listed on the applicable QPL. Barrier materials that have QPLs are MIL-PRF-131, MIL-PRF-81705, MIL-PRF-22191, MIL-PRF-3420 and MIL-PRF-22019. Sources for QPL material can be obtained from the Qualified Products Database at http://qpldocs.dla.mil/.

b. IMMEDIATE USE/INSTALLATION AND PART NUMBER BUY SHIPMENTS - Government PCO or ACO approval is required to use the packaging standards outlined in this paragraph. Any national stock numbered (NSN) item required for immediate use (used or consumed within 7 days of receipt) or direct installation, or part numbered item (authority granted to ship without NSN) shall be preserved and packed in accordance with ASTM D3951-18 (2023), "Standard Practice for Commercial Packaging", for all shipments to a Continental United States (CONUS) government activity or contractor-owned facility. All material destined for overseas shipment (OCONUS) shall be preserved in accordance with MIL-STD-2073-1.

c. GOVERNMENT-OWNED MATERIAL - In the event that the contract expires, is terminated, or completed, and Government-owned material is to be returned to the supply system, the contractor shall preserve and package this material in accordance with the requirements of paragraph 1.a.

2. PROTECTION FROM DEGRADATION DUE TO ELECTROSTATIC (ES)/ELECTROMAGNETIC (EM) FORCES

a. When ASTM D3951-18 (2023) is authorized for packaging and the item is considered Electrostatic Discharge sensitive (ESDS), protection shall be in accordance with ANSI/ESD S20.20-2021, "For the Development of an ESD Control Program for - Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)."

b. When MIL-STD-2073-1 is specified and the preservation method code (PMT) in the solicitation does not specify ESD/EM protection (PMT = GX) and the contractor's proposed item of supply is subject to degradation from ES/EM forces, contractors shall provide recommended packaging data with their proposals/quotes.

WSSTERMDZ03 (CONT)

PRESERVATION, PACKAGING, PACKING AND MARKING

3. PACKING REQUIREMENTS - The contractor shall pack as follows:

Domestic Shipments (CONUS): Level B

Overseas Shipments (OCONUS) (including Navy ships at sea):

Via air, FPO, APO Level B Via freight forwarder Level B Via surface Level A

Exterior shipping containers for Packing Levels A and B are listed in MIL-STD-2073-1, Appendix C, Table C.II.

Long-life reusable containers and wood containers are shipping containers which do not require overpacking for shipment.

4. MARKING REQUIREMENTS - All unit, intermediate and shipping containers shall be marked in accordance with MIL-STD-129. In addition, the following specific requirements apply:

a. ADDITIONAL MARKING FOR SPARES ONLY - Each MIL-STD-129 label shall also include the following:

1) Procurement Instrument Identifier (PIID) - the 13-digit contract order number,

2) Contract Line Item Number (CLIN) - the 4-digit individual line item number (e.g. 0001, 0002, etc.), and

3) SubCLIN - the 6-digit sub line item number (e.g. 0001AA, 0001AB, 0002AA, 0002AB, etc.).

b. DEPOT LEVEL REPAIRABLE (DLR) LABELS

1) Items identified with a Cognizance (COG) Code of either "7" or an even number preceding the NSN, excluding

6A, 6H and 6X COGs (e.g. 7RH 5826-014289999), are defined as Depot Level Repairable (DLR) items. DLR items require that a DLR label be placed on the outside of the unit, intermediate and shipping containers as close to the bar code label as possible.

EXCEPTION: When a DLR item requires use of both a reusable inner unit container and a reusable outer shipping and storage container (excluding wood and fiberboard), only the inner unit container shall be affixed with a DLR label. In these cases only, DLR labels shall NOT be placed on the outer reusable container.

2) Labels are available via the Naval Forms Online website: https://forms.documentservices.dla.mil/order/.

The website will advise the procedures for ordering and establishing an account.

3) NAVSUP WSS authorizes contractors to create and print their own DLR labels. Labels shall follow the standard size and font options listed in below chart. Text shall be in all upper case letters of the same style font. The label used shall be sized proportionate to the size of the container. Labels shall be horizontally printed and consist of yellow "DLR" text font on a solid blue background. Labels shall meet requirements of MIL-STD-129 section 4.2.2. Labels shall be of a water-resistant grade of paper, film, or plastic, coated on one side with water-insoluble, permanent type adhesive. The adhesive shall adhere to metal, plastic, aluminum or fiberboard surfaces under high and low temperatures. Labels shall have a finish suitable for printing and writing on with ink without feathering or spreading, be capable of withstanding normal handling and storage conditions, and remain securely in position. Application specific performance criteria and durability requirements to ensure functionality in various climatic environments should be tailored, if required, using MIL-PRF-61002. MIL-PRF-61002 can be used as an acquisition tool when labels presently being used are not performing satisfactorily or when new conditions or applications require special label stock for those particular situations.

NSN DESCRIPTION QUANTITY APPLICATION FORM NUMBER

PER UNIT

PACKAGE

0108LF5055300 DLR Label 100 Unit NAVSUP 1397-1

2in.x3in. Container 0108LF5055000 DLR Label 100 Intermediate NAVSUP 1397

3inx5in. Shipping Container

c. SPECIAL MATERIAL IDENTIFICATION CODE (SMIC) FOR NAVSUP WSS MARITIME REQUIREMENTS ONLY

1) Certain Program related items are identified by a two-position SMIC, which appears as a suffix to the NSN

(e.g. 1H 4730 009001317 L1), and require special markings. Containers shall be marked or labeled with letters, maximum two inches high on two (2) sides and two (2) ends as follows:

WSSTERMDZ03 (CONT)

PRESERVATION, PACKAGING, PACKING AND MARKING

SMIC MARKINGS COLOR TYPE CONTAINER

L1 LEVEL 1 RED Unit, intermediate and shipping

(size permitting) S1 SURFACE RED Unit, intermediate and shipping

LEVEL 1 (size permitting) D4/D5/D7 DSS-SOC RED Unit, intermediate and shipping

(size permitting) C1* LEVEL 1 SPECIAL Green Unit, intermediate and shipping

CLEAN 02-N2

CP/VG* SPECIAL CLEAN GREEN Unit, intermediate and shipping

02-N2 D0/D6/D8* DSS-SOC Green Unit, intermediate and shipping

SPECIAL CLEAN

O2-N2

VU FBW SFCC VU BLUE Unit, intermediate and shipping

(size permitting) SW FBW SFCC SW BLUE Unit, intermediate and shipping

(size permitting) Q3/Q5 Q3 or Q5 RED Unit, intermediate and shipping *denotes Oxygen Clean requirements in accordance with MIL-STD-1330 "Precision Cleaning and Testing of Shipboard Oxygen, Helium, Helium-Oxygen, Nitrogen, and Hydrogen Systems."

5. PALLETIZATION. Palletization of shipments shall be accomplished in accordance with MIL-STD-147 "DOD Standard Practice: Palletized Unit Loads." Failure to meet these palletization/packaging requirements and measures, without a written waiver from the PCO or ACO, may result in charges back to the contractor for repalletization and/or repackaging of items. Pallets shall conform to the requirements of American National Standards Institute, Material Handling-MH1-2016, Pallets, Slip Sheets, and Other Bases for Unit Loads. MH1-2016 may be obtained at the following website: http://www.mhi.org.

a. General Purpose Unit Loads - When shipping directly to a Navy afloat unit, pallets meeting MH1-2016, Part No.

MH1/9-02SW4048 or MH1/9-10BW4048 for unit loads under 1,500 pounds and MH1/9-03SW4048 for unit loads over 1,500 pounds shall be used.

b. Hazardous Material Unit Loads - Unless otherwise specified in the contract or purchase order hazardous material containers, except cylinders and 55 gallon drums, shall be palletized utilizing MH1-2016 Part No. MH1/9-07SW4848 pallets.

c. Use of nonstandard commercial pallets is prohibited.

6. WOOD PACKAGING MATERIAL (WPM). All shipments destined to the DOD must be treated and marked in accordance with the International Standards for Phytosanitary Measures Guidelines for Regulating Wood Packaging Material in International Trade (ISPM 15).

a. For all WPM furnished under this contract the contractor shall ensure the American Lumber Standards Committee (ALSC) approved mark is applied to every shipment regardless of destination.

b. Failure to comply with the requirements of ISPM 15 may result in refusal of the shipment, destruction or corrective treatment of WPM at the point of receipt and the associated costs charged back to the contractor.

7. NAVY SHELF-LIFE PROGRAM. Navy shelf-life requirements are listed under the item description in a 3-digit alpha/numeric code. Position one (1) is the DOD shelf-life code, defining the type of shelf-life for an item (Type I, non -extendible or Type II, extendible), and the number of months an item can remain ready for issue in a Navy specified package. Positions two (2) and three (3) combined form the Navy-unique shelf-life action codes used by storage activities, and do not impose any requirements on the contractor. The contractor shall use the applicable shelf-life paragraphs and table in MIL-STD-129 to apply either Type I or Type II shelf-life markings to an item's unit, intermediate and shipping containers. Contractors will ensure that at least eighty-five percent (85%) of the Navy shelf-life requirement is remaining when received by the first government activity.

WSSTERMDZ03 (CONT)

PRESERVATION, PACKAGING, PACKING AND MARKING

8. REUSABLE NSN CONTAINERS. An item that has an NSN assigned in the "Container NSN" field (e.g . 8145 012622982) requires shipment in a reusable shipping and storage container.

a. REUSABLE CONTAINERS FOR NAVSUP WSS, MARITIME REQUIREMENTS - Reusable NSN containers for maritime material (designated by a COG Code of "7E", "7G" and "7H") shall be provided as contractor-furnished material (CFM).

b. REUSABLE CONTAINERS FOR NAVSUP WSS, AVIATION REQUIREMENTS - Reusable NSN containers (excluding fiberboard and most wood) for aviation material (designated by a COG Code of "7R", "6K" or "0R") shall be provided as government-furnished material (GFM). Fast pack containers will not be provided as GFM. To obtain GFM reusable containers, the contractor must request via email usn.philadelphia.navsupwssphil.mbx.navsupcrf@us.navy.mil at least 90 days prior to the anticipated shipping date, 30 days prior for repair contracts. If the Navy's Container Management Area (CMA) informs the contractor that containers are unavailable, the following alternate packaging requirements apply. The unavailability of reusable containers shall not be an excusable delivery delay.

ALTERNATE PACKAGING REQUIREMENTS FOR ITEMS ASSIGNED THE FOLLOWING CONTAINERS

Container Container Alternate Packaging Code NSN Part Number (80132) IAW MIL-STD-2073-1 8145 002609548 P069-2 }

8145 002609556 P069-1 } N 001 000 GX 1 00 K3 LT B ED

8145 002609559 P069-3 } UCL = B

8145 002609562 P069-4 } SPMK = 39

8145 010124088 P069-6 } PACK = QFF

8145 010140440 P069-5 } 8145 011644073 P069-7 } 8145 012622982 15450-1 } If MOP/PMT = GX

--------------------------------------} N 001 000 GX 1 00 K3 GH Z ED

8145 012622983 15450-2 } Z= use 1.5" of "GH" cushioning --------------------------------------} between barrier bag and Unit Container

8145 012622984 15450-3 } UCL = B

--------------------------------------} SPMK = 39

8145 012622985 15450-4 } PACK = QFF

8145 012622986 15450-5 } For all other MOPs/PMTs

--------------------------------------} N 001 000 51 1 00 EA GH F ED

8145 012622987 15450-6 } UCL = B

--------------------------------------} SPMK = 03

8145 012622988 15450-7 } PACK = QFF

c. All excess empty reusable shipping and storage containers shall be turned-in to the nearest Container Reuse and Refurbishment Center (CRRC). CRRC locations/points of contact: Program Manager - 215-697-2063

Norfolk, VA-757-445-9099 ext.124 Yokosuka, Japan-011-81-46-816-6304 Cherry point, NC-252-466-2331 Lemoore, CA-559-998-0220 Jacksonville, FL-904-542-1014 Okinawa, JAPAN-011-81-46-816-6304 San Diego, CA-619-545-8360 Iwakuni, JAPAN-011-81-46-816-6304 Puget Sound, WA-360-476-9777 Bahrain-011-318-439-9553

d. The stock-numbered, long-life, reusable containers identified herein as GFM are property of the U.S. Navy and only shall be used to fulfill orders from the Navy and U.S. Marine Corps; these containers shall not be used to fulfill orders from the U.S. Army, U.S. Air Force, any other agency of the U.S. Government or Foreign Military Sales (FMS) customer.

WSSTERMDZ03 (CONT)

PRESERVATION, PACKAGING, PACKING AND MARKING

9. REUSABLE NSN CONTAINERS FOR FOREIGN MILITARY SALES (FMS), JOINT PROGRAM OFFICE (JPO) OR OTHER FOREIGN FORCES

ACQUISITION

a. Reusable shipping and storage containers shall be provided as CONTRACTOR-FURNISHED MATERIAL (CFM), unless otherwise specified.

b. Contractors may tender offers including alternate, non-reusable, packaging methods and be considered responsive.

10. HAZARDOUS MATERIALS. This section applies when items to be delivered under this contract are considered hazardous materials as defined by 49 CFR, FED-STD-313, or by the Government's technical representative.

a. Packaging and marking for hazardous materials shall comply with applicable requirements for Performance Oriented Packaging (POP) contained in 49 CFR and the international modal regulations. All performance test requirements shall be supported by test certificates and reports attesting to the date and the results obtained from performance oriented packaging testing. The contractor shall be responsible for assuring that sources providing performance testing services are registered with the U.S. Department of Transportation (DOT). The contractor's signed certification that the packaged configuration meets the applicable modal regulation shall be incorporated on the Wide Area Workflow Receiving Report (WAWF RR), DD Form 250, Material Inspection and Receiving Report, or other related acceptance documents if a WAWF RR, DD Form 250 is not used. The Shipper's Declaration for Dangerous Goods (SDDG) must be included for all air shipments and uploaded to WAWF. All test certificates, reports and training records shall be available for inspection by authorized Government representatives for a period of three years.

b. When a contract/order for hazardous material requires shipment to a military aerial port or through a military container consolidation point including DODAACs SW3225, SW3123, SW3142, N45627, FB4427, FB9150, FB4497, FY8910, FY9125, FB4418, FY4462, FB4484, FY4494, those shipments shall comply with NAVSUP PUB 505/AFMAN 24-204, Preparing Hazardous Materials for Military Air Shipment.

11. SAFETY DATA SHEETS. As required by clauses FAR 52.223-3 "Hazardous Material Identification and Material Safety Data" and DFARS 252.223-7001 "Hazard Warning Labels" the contractor/offeror is required to list any hazardous material to be delivered under the resultant contract by the submission of Safety Data Sheets (SDSs) and Globally Harmonized System (GHS) compliant product label, when applicable, to the NAVSUP WSS or DLA Contracting Officer prior to award. An electronic copy in PDF format of the SDS and GHS product label must also be emailed to NAVSUP WSS Code N242 at NAVSUPWSSMECH.HAZMAT@US.NAVY.MIL. Please include the NSN, CAGE, Part Number, quantity of hazardous material, contract number, and point of contact for hazardous material questions in the body of the email.

12. REPACKAGING TO CORRECT PACKAGING DEFICIENCIES

a. Notwithstanding inspection and acceptance by the Government of items furnished under this contract, or any condition of this contract concerning the conclusiveness thereof, the contractor guarantees that the preservation, packaging, packing and marking (PPP&M), and the preparation of, and method of shipment of such items will conform to the requirements of this contract.

b. Items that do not conform to the PPP&M requirements of this contract may have a Supply Discrepancy Report (SDR, SF-364) written against the contractor at the time of receipt.

c. The Government may at the option of the PCO or ACO, correct PPP&M deficiencies, without prior contractor notification, and require an equitable adjustment in the contract price to cover labor and material when corrective actions are warranted, or return the non-conforming material to the contractor for repackaging at the contractor's expense.

(12-2025)

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

CLIN: 0001

NIIN: 013312321 ACTIVITY USE ONLY: TDP VERSION NO.: 003

ITEM NAME: CIRCUIT CARD ASSEMB

4. QUALITY ASSURANCE

4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.

4.2 Inspection/Testing Repaired Items - The Contractor shall perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings.

4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.

CLIN: 0002

NIIN: 013913393 ACTIVITY USE ONLY: TDP VERSION NO.: 003

ITEM NAME: CIRCUIT CARD ASSEMB

4. QUALITY ASSURANCE

4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.

4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.

4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.

4.4 Inspection/Testing Repaired Items - The Contractor shall perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings.

WSSTERMEZ05

INSPECTION AND ACCEPTANCE OF SUPPLIES

<x> 1. Inspection of Supplies shall be performed at the contractor location shown on Page One by the Contract Administration Office (CAO) also shown on Page One, unless otherwise specified below:

< > Manufacturing Site at < > by the Manufacturing Site CAO < > .

< > Subcontractor's Sites at < > by the Subcontractor Site CAO < > .

< > Packaging Site at < > by the Packaging Site CAO < > .

< > DCMA Naval Special Emphasis Operations < > .

<x> 2. Final Acceptance of Supplies and Packaging shall be performed at the contractor's location on Page One by the Contract Administration Office (CAO) also shown on Page One, unless otherwise specified below:

< > Manufacturing Site at < > by the Manufacturing Site CAO < > .

< > Subcontractor's Site at < > by the Subcontractor Site CAO < > .

< > Packaging Site at < > by the Packaging Site CAO < > .

< > DCMA Naval Special Emphasis Operations < > < > Destination.

< > 3. Inspection and Acceptance of Supplies will be performed by the consignee at Destination. (4-15)

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

WSSTERMFZ03

CONSIGNEE'S NOTIFICATION TO THE PURCHASING ACTIVITY OF RECEIPT, NONRECEIPT, OR

NONCONFORMANCE

(a) INSPECTION of supplies at destination shall be limited to examination

(1) quantity,

(2) condition and

(3) packaging and marking.

(b) The consignee shall notify the activity cited in Block (6),

(1) within 10 days after receipt of material,

(2) if material is not received within 30 days after delivery date cited in Block (10), or

(3) within 10 days after receiving nonconforming material. If nonconforming material has been received, attach a completed SF 364 Report of Discrepancy to the notification. The SF 364 report is to be used regardless of the unit cost of the material.

NOTE: IN ADDITION, IF MATERIAL IS NOT RECEIVED WITHIN 30 DAYS AFTER

SHIPMENT DATE, IF SUCH DATE IS PROVIDED, NOTIFY THE ACTIVITY

CITED IN BLOCK 6.

NOTE: TO CONTRACTOR/RECEIVING ACTIVITY (APPLIES TO THIS ORDER AND IF

MATERIAL IS TO BE SHIPPED TO A FPO/APO ADDRESS).

FPO/APO SHIPMENTS ARE CONSIDERED OVERSEAS FOR THE PURPOSES OF

RECEIPT, RISK OF LOSS AND CONTRACTOR LIABILITY AND THUS, THESE

FPO/APO SHIPMENTS ARE SUBJECT TO THE 180 DAY NOTICE PROVISION

OUTLINED UNDER FAST PAYMENT PROCEDURE IN CLAUSE 52.213-1 "FAST

PAYMENT PROCEDURE." (11-92)

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

ACRN GN/GRNT BGN/END SYMBL SBHD OBJ BCN SA AAA TT PAA COST-CODE AMOUNT TAC

AA 97 00 XX XX 4930 NC1A 000 81004 0 050120 7T 000000 8RMF00000000 $40,727.88 NN4W

252.232-7006

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document Type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow

(WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, electronic Submission of Payment Requests and Receiving Reports.

252.232-7006 (CONT)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the Webb Based Training link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items--

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

( <Invoice and receiving report (combo)> )(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

( < > )(Contracting Officer: Insert either Invoice 2in1 or the applicable invoicece and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(f) (Note: The Contractor may use a WAWF combo document type to create some combinations of invoice and receiving report in one step.)

(3)Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table Field Name in WAWF Data to be entered in WAWF

252.232-7006 (CONT)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

Pay Official DoDAAC ( <HQ0338> ) Issue By DoDAAC ( <N00104> ) Admin DoDAAC ( <S1002A> ) Inspect By DoDAAC ( <S1002A> ) Ship To Code ( <See schedule> ) Ship From Code ( <03956> ) Mark For Code ( < > ) Service Approver (DoDAAC) ( < > ) Service Acceptor (DoDAAC) ( <S1002A> ) Accept at Other DoDAAC ( < > ) LPO DoDAAC ( < > ) DCAA Auditor DoDAAC ( < > ) Other DoDAAC(s) ( < > )

(Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert See Schedule or Not applicable.)

(Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activitys WAWF point of contact.

( < > )(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

WSSTERMGZ02

NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER

Telephone inquiries should be made only in cases of extreme urgency and must be confirmed in writing within 48 hours.

If the inquiry involves technical questions (drawing, specification, etc.) inquiry should be submitted in accordance with the procurement specification.

( < > ) NOTE FOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .