BGNDRF Booster Pump Repairs Statement of Work Brackish Groundwater National Desalination Research Facility Booster Pump Repairs Part 1 – General Information

1.0 Abbreviations, Acronyms, and Definitions

The following abbreviations and acronyms are used throughout this performance work statement:

AAO -Albuquerque Area Office (BOR)
BGNDRF -Brackish Groundwater National Desalination Research Facility
BOR -Bureau of Reclamation (USBR)
CO -Contracting Officer
COR -Contracting Officer's Representative
DFT -Dry Film Thickness
FAR -Federal Acquisition Regulation
GPM -Gallons per Minute
MDT -Mountain Daylight Time
MILs -Thickness equal to one-thousandth of an inch (0.0254 millimeter)
NAICS -North American Industry Classification System
NTP -Notice to Proceed
OGR -Onsite Government’s Representative
SOW -Statement of Work
UCB -Upper Colorado Basin (Interior Region 7, Reclamation)
U.S.D.O.I. -United States Department of the Interior
1.1Purpose

The Government has determined a need to refurbish/repair an existing Simflo Serial No. 104328B short set booster pump having a design point of 120 gpm at 120 vertical feet. The existing booster pump is located within the boundary of the Brackish Groundwater National Desalination Research Facility in Otero County New Mexico at latitude 32° 53’ 00.3”N, longitude -105° 58’ 35.0” W with street address of 500 La Velle Road, Alamogordo, New Mexico 88310.

1.2 North American Industry Classification System (NAICS)

The NAICS for this work is 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance.

1.3 Standards

The SOW shall follow the standards set-forth in the following paragraphs.

1.3.1American Society for Testing and Materials - International (ASTM):
ASTM A105/A105M-18Carbon Steel Forgings for Piping Applications
ASTM A126-04(2019)Gray Iron Castings for Valves, Flanges, and Pipe Fittings
ASTM A403/A403M-20Wrought Austenitic Stainless Steel Pipe Fittings
ASTM A478-97(2019)Chromium-Nickel Stainless Steel Weaving and Knitting Wire
ASTM A536-84(2019)e1Ductile Iron Castings
ASTM D4417-21Field Measurement of Surface Profile of Blast Cleaned Steel
ASTM F593-17Stainless Steel Bolts, Hex Cap Screws, and Studs
ASTM F594-09(2020)Stainless Steel Nuts
ASTM F837-20Stainless Steel Socket Head Cap Screws
1.3.2American Water Works Association (AWWA)
AWWA A21.10-08American National Standard for Ductile-Iron and Gray-Iron Fittings for Water
AWWA A100-20Water Wells
1.3.3Association for Materials Protection and Performance (AMPP)
NACE No. 2/SSPC-SP 10, Sept. 2019Near White Metal Blast Cleaning
1.4Submittals

Submit the following for Government review or approval:

· Prepare in English.

· Label with contract number and title including Required Submittal Number (RSN).

· Measurement Units: US Customary Units.

· Provide a unique transmittal tracking number for each submittal.

· Drawings and sketches shall follow the U.S. National CAD Standard, Version 6.

· Review of submittals:

· Time required: The Government will require a minimum of 3 days to review each submittal or resubmittal, unless otherwise specified.

· Excess Time: Should the Government require additional review time; the CO may extend the contract completion date to allow completion of work. Time extension will be to the extent that the excess review time caused delay to contract completion.

· Submit the following for Government approval or review.

· Submittal Types: A – Action requiring Government approval and I – Informational requires Government written receipt.

· Submit to COR one electronic (email) copy for review.

Submittal Table

RSN
Required Submittal and Description
Due Date or Delivery Time
Type
S1
Booster Pump repair schedule and listing of key tasks/activities
Within 7 calendar days after contract award.
A
S2
Tnemec Coating System provide product data
Within 5 workdays prior to applying coating systems
I
S3
Warranty Data
Provide with Payment Invoice
I

PART 2 – WORK REQUIREMENTS

2.0 Period of Performance

The Government considers the tasks above be completed within 60 calendar days after contract award has been issued. The Contractor shall provide all labor, management, transportation, equipment, supplies, materials, etc. necessary to perform these activities.

2.1 Repair Tasks

The following summary list of activities/tasks to repair the booster pump as follows:

· Disassembly of the booster pump:

· From disassembly and inspection provide a breakdown on recommendation repairs and replacement of components.

· Blast clean intermediate bowls, impellers, and seal housing.

· Machine out existing wear rings from intermediate bowls and impellers.

· Furnish and Install new wear rings in intermediate bowls and impellers.

· Furnish and Install new bearing set in seal housing.

· Furnish and Install new mechanical seal assembly.

· Furnish and Install new stainless steel bowl shafts throughout pump assembly.

· Coat all exposed surfaces using Government approved Tnemec coating system.

2.2 Coatings

The Contractor shall select one of the following approved Government coating systems for all exposed pump surfaces.

2.2.1Government Option 1 - TNEMEC Pota-Pox, Series 20
Generic Description:Polyamide Epoxy
Color::15BL Tank White
Certifications:NSF International in accordance with NSF/ANSI Standard 61
Final Thickness:10 Mils (± 2 Mils)
2.2.2Government Option 2 - TNEMEC Pota-Pox Plus, Series V140F
Generic Description:Polyamidoamine Epoxy
Color:15BL Tank White
Certifications:NSF International in accordance with NSF/ANSI Standard 61
Final Thickness:10 Mils (± 2 Mils)
2.2.3Surface Preparation
Immersion, Steel:SSPC-SP10/NACE 2 Near-White Blast Cleaning or ISO Sa 2 1/2 Very thorough Blast Cleaning with a minimum angular anchor profile of 1.5 mils.
Cast/Ductile Iron:All external surfaces of ductile iron pipe and fittings shall be delivered to the application facility without asphalt or any other protective lining on the exterior surface. All oils, small deposits of asphalt paint, grease, and soluble deposits should be removed and uniformly abrasive blasted using angular abrasive in accordance with NAPF 500-03-04: External Pipe.
All Surfaces:Must be clean, dry and free of oil, grease and other contaminants.
Surface condition:When viewed without magnification, the exterior surfaces shall be free of all visible dirt, dust, loose annealing oxide, rust, mold coating and other foreign matter. Any area where rust reappears before application shall be re-blasted. The surface shall contain a minimum angular anchor profile of 1.5 mils, reference ASTM D 4417, Method C.
2.2.4Application
Coverage Rates
Suggested
Minimum
Maximum
Dry Mils
6.0
2.0
10.0
Wet Mils
9.0
3.0
15.0
Square Feet per Gallon
182.0
545.0
109

Note: Allow for overspray and surface irregularities. Wet film thickness is rounded to the nearest 0.5 mil or 5 microns. Application of coating below minimum or above maximum recommended dry film thicknesses may adversely affect coating performance. Reference NSF website at www.nsf.org for details on the maximum allowable DFT.

Immersion, Steel:Prepare surfaces according to SSPC-SP10/NACE 2 Near-White Blast Cleaning.
Mixing Coating:Start with equal amounts of Series V140F Parts A and B. Power mix contents of each container separately, making sure no pigment remains on the bottom. Pour a measured amount of Part B into a clean container large enough to hold both components. Add an equal volume of Part A to Part B while under agitation. Continue agitation until the two components are thoroughly mixed. Note: Both components must be above 50°F prior to mixing. For optimum mixing and application properties, the material should be above 60°F.
Thinning Coating:Thin by volume and thoroughly mix. Failure to thoroughly mix the Part A and Part B components prior to thinning can affect product’s gloss and performance. Do not use mixed material beyond pot life limits. Note: For application to surfaces between 35°F to 50°F, allow mixed material to stand 30 minutes and restir before using.
Thinning:Use No. 4 Thinner. Caution: Series V140F NSF certification is based on thinning with No. 4 Thinner only. Use of any other thinner voids NSF/ANSI Std. 61 certification. Note: When using Series V140F, a maximum of 4.5% of No. 4 Thinner may be used to comply with VOC regulations.
Pot Life:Estimated at 2 hours at 50°F, 1 hour at 75°F, and 30 minutes at 100°F.
Spray Life:Estimated at 30 minutes at 75°F. Note: Spray application after listed times will adversely affect ability to achieve recommended dry film thickness.