7 - Attachment B - Price Breakdown Sheet.docx

DOCX document 26 KB Posted

Attached to
640A0-25-100 - Accessible Parking in Lots 100 North and 100 South Palo Alto
Solicitation number
36C26124R0085
Issued by

About this file

This document is an Attachment B: Price Breakdown Sheet for a federal contract opportunity for the update of accessible parking in Palo Alto Lots 100 North and South. The contract, Solicitation Number 36C26124R0085, is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21. The contractor will be required to provide all labor, materials, equipment, tools, and supervision for the work. The Price Breakdown Sheet itemizes the costs for various divisions of work including General Requirements, Existing Conditions, and Equipment. Bidders must provide pricing for materials, labor, equipment, and other costs for each division, as well as overhead, profit, bonds, and insurance to arrive at a total proposal amount. The offeror agrees to perform the work at the prices specified if the offer is accepted by the Government within the stated number of calendar days.

View the file

Other files

File Type Posted
4 - Reference Drawing Post Detail.pdf PDF
1 - 36C26124R0085.docx DOCX document
9 - RFI FORM.docx DOCX document
8 - Attachment C - EMR Sheet.docx DOCX document
3 - Reference Drawings Parking Lot.pdf PDF
6 - Wage Determinations.pdf PDF
2 - Combined Specs Parking Lot.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B: Price Breakdown Sheet, Project No. 640A0-25-100, Accessible Parking Lots 100 North & 100 South

DESCRIPTION
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL

Division 01 -General Requirements

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 02 – Existing Conditions
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 11 – Equipment
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 11 – Equipment
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
SUB TOTAL
$
$
$
$
$
Overhead
$
$
$
$
$
Profit
$
$
$
$
$
Bonds and Insurance
$
$
$
$
$
TOTAL Proposal
$
$
$
$
$

NOTE: All other costs may be included as a separate item and shall be specified in this breakdown.

The offeror agrees to perform the work required at the prices specified above in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due. (Failure to insert any number means the offeror accepts the minimum days in the TORFP letter.)

NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

Signature Date

File details come from the government source that posted it. Updated .