7 - Attachment B - Price Breakdown Sheet.docx
DOCX document 26 KB Posted
- Solicitation number
- 36C26124R0085
About this file
This document is an Attachment B: Price Breakdown Sheet for a federal contract opportunity for the update of accessible parking in Palo Alto Lots 100 North and South. The contract, Solicitation Number 36C26124R0085, is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21. The contractor will be required to provide all labor, materials, equipment, tools, and supervision for the work. The Price Breakdown Sheet itemizes the costs for various divisions of work including General Requirements, Existing Conditions, and Equipment. Bidders must provide pricing for materials, labor, equipment, and other costs for each division, as well as overhead, profit, bonds, and insurance to arrive at a total proposal amount. The offeror agrees to perform the work at the prices specified if the offer is accepted by the Government within the stated number of calendar days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4 - Reference Drawing Post Detail.pdf | ||
| 1 - 36C26124R0085.docx | DOCX document | |
| 9 - RFI FORM.docx | DOCX document | |
| 8 - Attachment C - EMR Sheet.docx | DOCX document | |
| 3 - Reference Drawings Parking Lot.pdf | ||
| 6 - Wage Determinations.pdf | ||
| 2 - Combined Specs Parking Lot.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B: Price Breakdown Sheet, Project No. 640A0-25-100, Accessible Parking Lots 100 North & 100 South
| DESCRIPTION |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
Division 01 -General Requirements
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 02 – Existing Conditions |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 11 – Equipment |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 11 – Equipment |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| SUB TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| Overhead |
| $ |
| $ |
| $ |
| $ |
| $ |
| Profit |
| $ |
| $ |
| $ |
| $ |
| $ |
| Bonds and Insurance |
| $ |
| $ |
| $ |
| $ |
| $ |
| TOTAL Proposal |
| $ |
| $ |
| $ |
| $ |
| $ |
NOTE: All other costs may be included as a separate item and shall be specified in this breakdown.
The offeror agrees to perform the work required at the prices specified above in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due. (Failure to insert any number means the offeror accepts the minimum days in the TORFP letter.)
NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
Signature Date
File details come from the government source that posted it. Updated .