This file contains construction and administration forms for Bid No. 26-01, a nutrient reduction wetland project (Kos972821A) in Kossuth County, Iowa, issued by the Iowa Department of Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality. The project encompasses approximately 17 acres of site development including selective clearing, excavation, grading, steel sheetpile installation, tile installation, water control structure installation, and seeding. Specific deliverables include approximately 12,900 cubic yards of earthwork, 1,444 square feet of steel sheetpile, 515 linear feet of tile installation, 91 linear feet of drawdown pipe, 548 tons of riprap, 108 cubic yards of concrete grout, and 16 acres of buffer seeding. The successful bidder must obtain a Performance Bond and submit a Construction Progress Schedule within fourteen calendar days of the Notice-of-Award dated April 9, 2026. A mandatory Preconstruction Conference must be held within seven days prior to the Construction Start Date. Substantial completion of all construction work except seeding is required by December 31, 2026, with structure seeding due by May 15, 2027, and buffer seeding due by June 30, 2027. Contract execution occurs following receipt and approval of required documents including the Performance Bond and Certificate of Insurance.
The estimated construction cost range is $350,000 to $450,000. Contractors must be registered with the Iowa Department of Inspections, Appeals & Licensing and are required to furnish a bid bond equal to ten percent of the bid amount and a Performance/Payment Bond equal to one hundred percent of the contract price. Contractors are authorized to purchase construction materials tax-free under Iowa Code Sections 422.42(16) and (17), and 422.47(5), with an Iowa Construction Sales Tax Exempt Certificate provided by the Division. Contract amendments and change orders may be processed as needed, requiring approval from the Director of the Division of Soil Conservation and Water Quality. No specific set-aside designations for disadvantaged enterprises are mentioned in the documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX I
CONSTRUCTION & ADMINISTRATION FORMS
Kos972821A Nutrient Reduction Wetland Project DOCUMENT LL Bid No. 26-01 NOTICE-OF-AWARD
LL-1
April 9, 2026
Contractor name and address
Delivery via email: Contractor Email
RE: NOTICE-OF-AWARD – Kos972821A Nutrient Reduction Wetland Project, Contract 26-01
Dear _______________________________, This is to notify you that the Division of Soil Conservation and Water Quality has determined __________________ is the successful bidder for the Kos972821A Nutrient Reduction Wetland Project.
Award is being made for the base bid of $____________.
In accordance with Item #9 of the Instructions to Bidders, Document BB, you have fourteen (14) calendar days from the date of receipt of this notice to obtain the Performance Bond (Document NN), submit your Construction Progress Schedule (Document JJ) for review, and execute the Contract (Document DD). In addition, the Division must be provided with a Certificate of Insurance pursuant to the General Conditions, Insurance and Related Provisions (Document FF, Part 6-01).
Please note that Iowa Code Section 91C.7, requires that all construction contractors awarded a contract to perform work for the state or an agency of the state must be registered with the Iowa Department of Inspections, Appeals & Licensing. The Division of Soil Conservation and Water Quality cannot execute a contract with your firm unless you provide proof of this registration. Be sure to fill in the Department of Inspections, Appeals & Licensing registration number blank on the Contract (Document DD).
Enclosed are the Contract (Document DD), Construction Progress Schedule form (Document JJ), and the Performance Bond (Document NN). Please complete, sign and return scanned electronic copies along with completed Performance Bond. In addition, we must have the Certificate of Insurance pursuant to the General Conditions and/or Special Conditions.
Congratulations on being the successful bidder. We look forward to working with your company on this project. If you have any questions, please contact Tracy Blocker, (515) 344-6279.
Sincerely, Jake Hansen, Chief Water Resources Bureau Division of Soil Conservation and Water Quality
JH/tab Enclosures
CC:
Kos972821A Nutrient Reduction Wetland Project DOCUMENT MM Bid No. 26-01 NOTICE- TO-PROCEED
MM-1
April 9, 2026
Contractor name and address
Delivery via email: Contractor Email
Dear____________________________, The Division of Soil Conservation and Water Quality received the signed construction Contract (Document DD), the completed Performance Bond (Document NN), and the Certificate of Insurance from your company. These documents were found to be in order and the Division executed this contract with __________ dated xx/xx/xxxx. A scanned copy of the executed Contract and Performance Bond are enclosed.
The Division has accepted the Construction Progress Schedule (Document JJ) included here, with a Construction Start Date of xx/xx/xxxx. A Preconstruction Conference, as required in Item 13 of the Instructions to Bidders (Document BB), must be held within seven (7) days prior to the Construction Start Date established in the Construction Progress Schedule, or earlier if mutually agreed. No work may commence on site prior to the Preconstruction Conference. If the Construction Start Date requires adjustment, that needs to be communicated to the Engineer and Division in a timely manner so as to facilitate scheduling of the Preconstruction Conference.
In accordance with the Contract _____________________ must commence work under this contract for the Kos972821A Nutrient Reduction Wetland Project on or before the Construction Start Date scheduled in the Construction Progress Schedule, but not before the Preconstruction Conference. You have until December 31, 2026 to complete all of the work except for seeding, and until May 15, 2027 to complete the structure seeding and June 30, 2027 to complete buffer seeding.
Also attached is a scanned copy of the Iowa Construction Sales Tax Exempt Certificate and Authorization Letter for this project. Pursuant to Iowa Code Section 423.2(80), this allows you to purchase materials tax free for use on this project. Please read the information provided in the authorization letter. You are authorized with this Notice-to-Proceed to purchase necessary materials for this project and request reimbursement for those items that are stored prior to the Construction Start Date.
If you have any questions, please contact Tracy Blocker, (515) 344-6279.
Sincerely, Jake Hansen, Chief Water Resources Bureau Division of Soil Conservation and Water Quality
JH/tab Attachments
CC:
Kos972821A Nutrient Reduction Wetland Project DOCUMENT JJ Bid No. 26-01 CONSTRUCTION PROGRESS SCHEDULE
JJ-1
STATE OF IOWA
DIVISION OF SOIL CONSERVATION AND WATER QUALITY
CONSTRUCTION PROGRESS SCHEDULE
Project ID: Kos972821A Date: _______________________________
Contractor: ___________________________________________________________________________________
Contract End Dates:
All Construction Work Except Seeding: December 31, 2026 Seeding: Structure May 15, 2027 Seeding: Buffer June 30, 2027
Scheduled Dates:
Anticipated Construction Start Date:
Preconstruction Conference Date Range*:
*Preconstruction Conference must be held prior to Construction Start Date, by no more than seven (7) days
Estimated Completion Date of All Work Except Seeding:
Final Walkthrough should be held prior to Contract End Date for all construction work except seeding
Major Construction Work Item(s) Order of Work Estimated Duration of Work
Site Preparation
Drain Tile Investigation
Dam construction
Earthwork
Topsoil Placement
Water Control Structure and Outlet Installation
Sheet Pile Installation
New Tile Installation
Riprap Placement
Grouting
Seeding
Dates established in this schedule may be adjusted as described in Document FF, Paragraph 3-21.
Kos972821A Nutrient Reduction Wetland Project DOCUMENT JJ Bid No. 26-01 CONSTRUCTION PROGRESS SCHEDULE
JJ-2
FOR THE CONTRACTOR
(Company Representative)
(Date)
(Name of Company)
(Address of Company)
(City, State, Zip code
FOR THE DIVISION
Mike Bourland, Water Resources Bureau Division of Soil Conservation and Water Quality
Accepted
Adjustment Requested
If adjustment is requested, describe below:
END OF DOCUMENT JJ
Kos972821A Nutrient Reduction Wetland Project DOCUMENT SS Bid No. 26-01 APPLICATION AND CERTIFICATE FOR PAYMENT
SS-1
Kos972821A Nutrient Reduction Wetland Project DOCUMENT SS Bid No. 26-01 APPLICATION AND CERTIFICATE FOR PAYMENT
SS-2
Kos972821A Nutrient Reduction Wetland Project DOCUMENT HH Bid No. 26-01 CHANGE ORDER REQUEST
HH-1
STATE OF IOWA
CHANGE ORDER REQUEST
Change Order Request No.
Project ID: Kos972821A Date:
Name of Project: Kos972821A
Location of Project: Kossuth County
Name of Contractor:
Architect/Engineer: Ducks Unlimited, Andrew Schippers, P.E.
Contract Plan and Detail Reference:
Change Order Request Drawing No. and Date:
Contract Specification Reference:
Description of Change:
BREAKDOWN OF CHANGE ORDER COST BY BID ITEM:
Item # Description Adjustment
Quantity Unit Cost Total Cost
Adjustment
TOTAL $
BREAKDOWN OF CONTRACT COST:
Original Project Contract Amount: $ 0.00 Approved Contract Amendments No. through $ 0.00 Pending Recommended Change Order Requests No. through $ 0.00 Approved Change Order Requests No. through $ 0.00 This Change Order Request: $ 0.00 Resulting Total Recommended Amount: $ 0.00
Reason for Contract Change:
Change Requested by:
Kos972821A Nutrient Reduction Wetland Project DOCUMENT HH Bid No. 26-01 CHANGE ORDER REQUEST
HH-2
(Signature) (Date)
CONTRACTOR APPROVAL
By:
(Company) (Signature)
(Address) (Date)
IDALS PROJECT REPRESENTATIVE RECOMMENDATIONS
Concur Recommend Rejection (Attach Explanation)
IDALS Project Representative:
(Signature) (Date)
DIVISION OF SOIL CONSERVATION AND WATER QUALITY AUTHORIZATION
Change Order required due to:
Immediate authorization to proceed granted: Yes No
APPROVED: DENIED:
Susan Kozak, Director Susan Kozak, Director Division of Soil Conservation and Water Quality Division of Soil Conservation and Water Quality Iowa Department of Agriculture Iowa Department of Agriculture and Land Stewardship and Land Stewardship
(Date) (Date)
END OF DOCUMENT HH
Kos972821A Nutrient Reduction Wetland Project DOCUMENT II Bid No. 26-01 CONSTRUCTION CONTRACT AMENDMENT
II-1
State of Iowa Iowa Department of Agriculture and Land Stewardship
Kos972821A Nutrient Reduction Wetland Project Construction Contract Amendment
THIS AMENDMENT, made this ______ day of ___________________________, 20____, by and between the State of Iowa, acting through:
Iowa Department of Agriculture and Land Stewardship
Division of Soil Conservation and Water Quality hereinafter called the DIVISION, and
(Name of Company)
(Address)
(City, State, Zip) hereinafter called the CONTRACTOR.
WITNESSETH: That the DIVISION and the CONTRACTOR mutually agree to amend the agreement made the _____day of __________, 20_____, for the Kossuth County Nutrient Reduction Wetland Project (Kos972821A – Bid No. 26-01) in this Amendment Number _________ as described below:
Description of Amendment:
Contract Plan Sheet(s) and Detail Reference(s):
Amendment No._______ Drawing No. and Date:
Contract Specification Reference(s):
Reason for Revision of Contract Completion Date(s):
Original Contract Completion Date for All Work Except Seeding: December 31, 2026 Current Completion Date for All Work Except Seeding:
Revised Completion Date for All Work Except Seeding, This Amendment:
Original Contract Completion Date for Seeding-Structure May 15, 2027 Current Completion Date for Seeding-Structure Revised Completion Date for Seeding-Structure, Original Contract Completion Date for Seeding-Buffer June 30, 2027 Current Completion Date for Seeding-Buffer Revised Completion Date for Seeding-Buffer, Kos972821A Nutrient Reduction Wetland Project DOCUMENT II Bid No. 26-01 CONSTRUCTION CONTRACT AMENDMENT
II-2
BREAKDOWN OF AMENDMENT CONTRACT COST BY BID ITEM:
Item # Description
Quantity Unit Cost
Total Cost
TOTAL $
Original Project Contract Amount: $ 0.00 Approved Contract Amendments No. through $ 0.00 Pending Recommended Change Order Requests through $ 0.00 Approved Change Order Requests No. through $ 0.00 This Amendment Request: $ 0.00 Resulting Total Recommended Amount: $ 0.00
IN WITNESS WHEREOF, the parties hereto have executed this Amendment, in the day and year first above mentioned.
FOR THE DIVISION FOR THE CONTRACTOR
Grant D. Menke, Deputy Secretary Iowa Department of Agriculture and Land Stewardship
(Company Representative)
(Date) (Date)
(Name of Company)
(Address of Company)
(City, State, Zip Code)
CONSENT FROM SURETY
Seal if by a corporation
(Surety Representative)
(Name of Surety)
END OF DOCUMENT II
Kos972821A Nutrient Reduction Wetland Project DOCUMENT QQ Bid No. 26-01 SALES TAX EXEMPTION CERTIFICATE
IOWA
Department of Revenue www.state.ia.us/tax
Designated Exempt Entity Iowa Construction Sales Tax Exemption Certificate
This document may be completed by a designated exempt entity and given to their contractor and/or subcontractor along with an authorization letter. Seller: Keep this certificate in your files. Contractor/Exempt Entity: Keep a copy of this certificate for your records. Do not send this to the Department of Revenue
Designated Exempt Entity Division of Soil Conservation and Water Quality Iowa Department of Agriculture and Land Stewardship Address 1 1305 East Walnut Street Address 2
City Des Moines
State
IA
Zip Code 50319
Construction Project Name Kos972821A Nutrient Reduction Wetland Project Construction Project Number (if used) Job No. 26-01
General Contractor or Subcontractor Name Sample Address 1 123 Construction Ave Address 2 City Dig City
State
IA
Zip Code 55555
Description of contract/subcontract (please print/type clearly)
Construction of Nutrient Reduction Wetland.
The named contractor may purchase building materials used in the contract, exempt from sales tax. This exemption does NOT apply to materials, equipment and supplies consumed by the contractor or subcontractor.
Designated Exempt Entity Authorized Agent ._____________________________________ Date: _____________
Authorization Letter From Division of Soil Conservation and Water Quality - Agriculture and Land Stewardship
Pursuant to Iowa Code Sections: 422.42 (16) & (17), and 422.47 (5), you are authorized to purchase construction materials tax free for the contract specified above.
The exemption certificate (or a copy of the certificate) may be provided to the suppliers of your construction materials and will authorize them to sell you the materials exempt from Iowa sales tax and any applicable local option sales tax and school infrastructure local option sales tax. Complete information on qualifying materials can be found at www.state.ia.us/tax, the Department of Revenue (IDR) website.
It is your responsibility to have records identifying the materials purchased and verifying they were used on this contract. Any materials purchased tax-free and not used on the construction project are subject to sales and applicable local option taxes. Should this occur, the tax must be paid directly by you to IDR in the same calendar quarter the project is completed. E-mail the department at: idrf@idrf.state.ia.us if you have questions on this requirement.
Contractors should be aware that use of the certificate to claim exemption from tax for items not used on this project or that do not qualify for exemption could result in civil or criminal penalties.
31-013 (12/10/02)
END OF DOCUMENT QQ