GSA REGION 6 New Des Moines Courthouse CMc
MARKET RESEARCH QUESTIONNAIRE
(For Informational Purposes Only)
1. Contractor Information:
Firm Name: _______________________________________________________________________________
Address: _______________________________________________________________________________
Name of Primary POC for firm: _______________________________________________________________
Phone Number of Primary POC: _______________________________________________________________
Email Address of Primary POC: _______________________________________________________________
Location:
Does your firm have a office(s) located within Iowa? If no, provide an estimated number of calendar days, from the date of contract award, it would take your firm to establish production capability within the primary geographical area of the project. ☐ Yes ☐ No
__________ Calendar Days
2. Type of Small Business: The North American Industrial Classification System (NAICS) code for this potential procurement is 236220 (Commercial and Institutional Building Construction). The SBA small business size standard is $36.5 Million. Check all that apply.
☐ SBA certified 8(a) ☐ SBA certified HUBZone ☐ ServiceDisabled VeteranOwned Small Business ☐ VeteranOwned Small Business ☐ WomanOwned Small Business ☐ Small Business
3. Experience:
a. Primary experience serving as: ☐ Construction Manager as Contractor (CMc)
☐ Subcontractor
Specify Trade: _______________________
b. Years your firm has been in business: _____________
c. Total number of employees:____________________
d. List the capabilities of the staff that are currently employed (not subcontracted). (i.e. project management, superintendent, electricians, etc.)
e. Does your firm have the capability to selfperform 15% of the cost of contract performance with own forces?
☐ Yes ☐ No If No, specify percentage _____________
f. Is your firm currently capable and experienced in providing all necessary labor, material, equipment, and management to provide PreConstruction phase and Construction phase services for a project of this size and magnitude? ☐ Yes ☐ No
h. Does your firm have experience completing all Preconstruction phase, Construction phase and other related services in accordance with all applicable design / specific facilities standards, excluding residential? ☐ Yes ☐ No
If YES, specify what services were peformed as part of the Preconstruction phase services:
i. Does your firm have experience managing projects equal to or in excess of $105M?
☐ Yes ☐ No
j. Provide the following information on the General Contractor:
● General Construction Contractor
● Bonding Capacity Type: ________________
● Amount per contract $_______________
● Aggregate amount $_______________
j. Provide the number of projects that your firm has completed within the last five (5) years that were consistent with the Type of Work and Services outlined in the Sources Sought announcement and consistent with the referenced NAICS Code:
k. Does your firm have experience providing Preconstruction and Construction phase services utilizing a delivery method that requires teaming with a Design Architect/Engineering team? ☐ Yes ☐ No
l. Does your firm have experience providing construction services for Class A Office Space? ☐ Yes ☐ No
m. Does your firm have experience with the location in the general geographical area of the project and knowledge of locality of the project? ☐ Yes ☐ No
If YES, specify ________________________________________________________________
n. Indicate your firm’s experience providing the type(s) of services consistent with the type of work required for the proposed contract. Check all that apply:
☐ PreConstruction and Construction Project Management Services ☐ Project Scheduling and Phasing ☐ New Construction ☐ Mechanical System Installation ☐ Electrical System Installation ☐ Civil Construction ☐ Structural Construction ☐ Cost Estimating ☐ Shop Drawing Preparation ☐ Value Engineering ☐ Building Envelope Installation ☐ Design Review/Quality Assurance ☐ Design Excellence ☐ Class A Office Space ☐ Construction Administration ☐ Construction Inspection ☐ Elevator Installation ☐ Signage Installation ☐ Construction Quality Control ☐ Seismic and Structural Evaluations
☐ Fire Safety Reviews/Studies ☐ Handicapped Accessibility (ABASS/UFAS) Reviews ☐ Sensitive Acoustical Installation ☐ Security Systems Installation ☐ Surveying (boundary & topographical) ☐ Quality Control Testing/Mock Ups ☐ Air Monitoring ☐ Hazard Assessment ☐ Courthouse Design and Construction ☐ Sustainable Design / LEED ☐ Code Compliance Reviews ☐ Constructability Review
☐ Identification of Acceptable Design Based Solutions (regulated items such as asbestos, PCBs, CFCs, radon, leadbased paint, underground storage tanks, mold investigations, and other various types of testing, monitoring, and quality checks)
Specific Projects Demonstrating your Firm’s 1) Capacity to accomplish the work in the required time 2) Past performance on contracts in terms of cost control, quality of work, and compliance with performance schedules.
If the answer to Question 3a is “Construction Manager as Contractor (CMc)”, complete this form for three (3) projects that your firm has successfully completed within the past five (5) years (as the CMc). Check all that applies to indicate the services provided.
DO NOT complete this section if the answer to Question 3a is “Subcontractor”
Performance Period (calendar days):
Award Date: _____________________
Completion Date Established at Time of Award:
Actual Completion Date: ___________
Initial Contract / Work Order Award Amount:
Final Price (including all options & modifications):
Value of Work Subcontracted:
Type of work: ☐ Renovation ☐ New Construction ☐ Alteration
Project Title: ___________________________________________________________________
Location: ______________________________________________________________________
☐ PreConstruction and Construction Project Management Services ☐ Project Scheduling and Phasing ☐ Mechanical System Installation ☐ Electrical System Installation ☐ Civil Construction ☐ Structural Construction ☐ Cost Estimating ☐ Shop Drawing Preparation ☐ Value Engineering ☐ Building Envelope Installation ☐ Design Review/Quality Assurance ☐ Design Excellence ☐ Class A Office Space ☐ Construction Administration ☐ Construction Inspection ☐ Elevator Installation ☐ Signage Installation ☐ Construction Quality Control ☐ Seismic and Structural Evaluations ☐ Sustainable Design / LEED ☐ Code Compliance Reviews ☐ Constructability Review
☐ Fire Safety Reviews/Studies ☐ Handicapped Accessibility (ABASS/UFAS) Reviews ☐ Sensitive Acoustical Installation ☐ Security Systems Installation ☐ Surveying (boundary & topographical) ☐ Quality Control Testing/Mock Ups ☐ Air Monitoring ☐ Hazard Assessment ☐ Courthouse Design and Construction ☐ Identification of Acceptable Design Based Solutions (regulated items such as asbestos, PCBs, CFCs, radon, leadbased paint, underground storage tanks, mold investigations, and other various types of testing, monitoring, and quality checks)