6c. Elk Creek IRSC CAM-Jade.pdf
PDF 10 MB Posted
- Attached to
- Elk Creek IRSC RMRP Stewardship Call Order
- Solicitation number
- 12363N25Q4191
About this file
This is a contract area map for the Jade IRSC (Integrated Resource Service Contract) timber sale in the Black Hills National Forest, Northern Hills Ranger District, dated July 10, 2025.
The map depicts a forestry contract covering 28 cutting units totaling approximately 1,058 acres across sections in T4N R5E and T5N R5E. The contract involves two primary timber harvest prescriptions: overstory removal (OR=>9") for smaller units and diameter limit plus selection (DxP) for larger units. Units require either whole tree (WT) or whole tree plus slash treatment (WTP), with log forwarder operations required for most DxP units. The contract includes road closure requirements for five forest system roads using gates furnished by the Forest Service, and specifies road reconstruction work per Appendix D. Environmental protection measures are extensive, including protection of wetlands, survey monuments, ephemeral streams, underground and overhead utilities, trails, gates, cattleguards, and electrical utility boxes per various contract clauses. The map shows steep slope areas, mine hazards, special measures areas, and distinguishes between forest system roads, county roads, and other ownership boundaries within the contract area.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ooooo o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o oo o o o o o o o o o o o o o o o o o ooooooooo o o o u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u uuu u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u uu u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u þ þþþ þ þ þ þ þ þ þþ þþþþþ þþ þ þ þ þ þ þ þ þ þ þ þ þþ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þþþ þþ þ þ þ þ þ þ þ þ þþþ þ þ þ þ þ þþþþþ þþþþþþþþþ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þþ þ þ þ þ þ þ þ þ þ þ
ÑôU ÑôU
ÑôU
ÑôU
ÑôU
R
R R
R R
R R
R
R R
R
R
R
R R
R
R R
R R R
R
R
R R
R
R
R
R R
R
R
R
R
R
Þ
Þ
Þ
Þ
Þ
XW
XWXW
XWXW
XW
XW
XW
XW
XWXWXW
XW
XW
XW XW
XWXW
XW
XW
XW
XW
XW
XW
XWXW
XWXW
XW
XW
XW
XW
XW
XW
XW
XW
XW XWXW
XW XW
XWXW
XW
XWXWXWXW
XW
XWXWXW
XW
XW
ã ã
T5N R5E
T4N R5E n6168.2C n6168.2A n6169.1H n6168.3A n6169.1G n6169.1F n6168.1 C n6168.3B n6 168.1B n6139.1 n6139.1 B n6139.1 C n6 169.1A n6168.1A n6139.1 A n6169.1B n6 n6168.3 n6169.
VA
NOCK
ER
CA
NYO
N R D
CT
Y-
3C
29 28
!(22
!(23
!(21
!(09 !(08
!(17
!(27
!(28
!(18
!(55
!(80
!(54
!(29 !(30
!(56
!(31
!(34
!(33
!(20
!(81
!(82
!(12
!(38
!(24 !(25
!(15
!(11
!(10
!(13 òòòòò òòòòò òòòòò òòòòò òòòòò
Sundance
Spearfish
Sturgis
Rapid City
Newcastle
Jade IRSC Contract Area Map
Black Hills National Forest Northern Hills Ranger District
0 0.25 0.5 0.75 1
Miles
40 ft Contour Interval July 10, 2025
Project Area
Road Number Location Closure Method Furnished By In Place
139.1 0.63 mi from junction w/CTY-3C Gate Forest Service Yes
139.1A 0.14 mi from junction w/139.1 Gate Forest Service Yes
168.1A 0.12 mi from junction w/168 Gate Forest Service Yes
168.3 3.48 mi from junction w/CTY-3C Gate Forest Service Yes
169.1 0.16 mi from junction w/168 Gate Forest Service Yes
C5.41# TBC Designation - Roads To Be Closed
Unit Acres Timber Designation Slash Forwarder
08 7 OR=>9" WT
09 4 OR=>9" WT
10 30 DxP WTP Required
11 20 DxP WTP Required
12 39 DxP WTP Required
13 56 DxP WTP Required
15 44 DxP WTP Required
17 28 OR=>9" WTP Required
18 126 DxP WTP Required
20 57 DxP WTP Required
21 21 DxP WTP Required
22 42 OR=>9" WT
23 20 DxP WTP Required
24 8 OR=>9" WT
25 11 DxP WTP Required
27 30 OR=>9" WTP Required
28 33 DxP WTP Required
29 15 OR=>9" WTP Required
30 81 DxP WTP Required
31 18 OR=>9" WT
33 8 OR=>9" WTP Required
34 102 OR=>9" WTP Required
38 121 DxP WTP Required
54 11 DxP WT
55 19 DxP WTP Required
56 11 DxP WT
80 8 DxP WTP Required
81 8 DxP WTP Required
82 20 DxP WT
B2.33 Overstory Removal C2.355# Designation By Prescription
C6.7# Slash Treatment C6.421# - Log Forwarder (LF)
Wetland Area To Protect, Master Agreement, Clause 35
Protect Survey Monument, Master Agreement, Clause 28XW
Ephemeral Streamcourse, Clause 16! !
Protect Underground Utility, Clause 15u
Protect Overhead Utility, Clause 15o
Protect Trail, Claue 15 þ
Protect Electrical Utility Box, Clause 15ÑôU Protect Gate, Clause 15Þ!!
Protect Cattleguard, Clause 15ã
Special Measures Area, Clause 14
Mine Hazard
Specified Road Reconstruction, A7, B5.1, Appendix D"
Forest System Road - Use Restricted, B5.12. C5.12# R
Forest System Road, B5.1, Appendix C
County Road
Discernable Boundary - Two-Track Trail! ! ! ! ! !
Discernable Boundary - Undefined Road
Other Ownership
Steep Slope - C6.411#, C6.42#
Cutting Unit Boundary, B1.1, C2.30#
Contract Area Boundary, B1.1
Protect Resources - Improvements
!(8
File details come from the government source that posted it. Updated .