PF-613 MERLIN DDX SOW 2026 (1).docx

DOCX document 34 KB Posted

Attached to
PF-613 MERLIN Hauling and Coating
Solicitation number
6991PE26Q000005
Issued by

About this file

This is a Statement of Work (SOW) for the hauling, inspection, surface preparation, coating, and repair of the PF-613 MERLIN, a 41-foot aluminum-hulled utility tugboat owned by the Maritime Administration. The vessel requires haul-out at a facility in the San Francisco Bay area (including Sacramento and Stockton upriver areas), hull and topside cleaning using high-pressure fresh water (minimum 3,000 PSI), surface preparation including sanding and spot bare metal power tool cleaning, renewal of four transom aluminum anodes and six clamp-on shaft anodes, and complete recoating of both underwater and freeboard surfaces. Underwater coating work includes application of US Paint etching primer G-9072 or equal, International Intershield 300V or equal, and International Interspeed 6400NA antifouling in red and black. Freeboard coating requires the same primer and intermediate coat followed by one full coat of Interthane 990HS or equal in Caribbean Blue. The SOW also specifies inspection and renewal of port and starboard shaft seals using Duramax seal kits and measurement of bearing clearances. All work must comply with American Bureau of Shipping, U.S. Coast Guard, OSHA, and American Welding Society standards, with contractor responsibility for gas-freeing certification, hazardous waste disposal, debris removal, and vessel cleanliness upon completion.

The related solicitation (6991PE26Q000005) is a combined synopsis and Request for Quotation issued by the Department of Transportation Maritime Administration for this work. The procurement is a total small business set-aside under NAICS code 336611 (Ship Building and Repairing) with a 1,300-employee size standard, and the award will be a firm fixed price purchase order. The period of performance is 60 days after award, with the Government also budgeting up to 100 supplemental labor hours at a fully burdened hourly rate and $20,000 not-to-exceed for supplemental materials and subcontracted services. Questions regarding the solicitation were due to the Contracting Officer (jon.meagher@dot.gov) by April 24, 2026 at 1:00 PM Pacific Time. All work must follow coating manufacturer recommendations under manufacturer representative supervision, and the contractor must provide daily reports on conditions found, inspection results, and any recommendations requiring Contracting Officer approval.

View the file

Other files

File Type Posted
6991PE26Q000005 Combined Synopsis Solicitation Example.docx DOCX document
2. E-Invoicing Instructions.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

GENERAL INFORMATION

PF-613 MERLIN Hauling and Coating

1. The subject vessel is owned by the United States of America acting through the Maritime Administration, Department of Transportation (herein after called MARAD).

2. The contractor shall provide all labor, material, and equipment necessary to make all removals and restorations; remove and replace interference’s; rig and unrig; make all disassembles and subsequent reassemblies to accomplish the work specified herein. All work shall be in compliance with the latest Regulatory Body requirements. The term, “Regulatory Bodies” includes the American Bureau of Shipping, United States Coast Guard, United States Public Health Service, the Department of Labor Occupational Safety and Health Administration, and the Institute of Electrical and Electronic Engineers.

3. If, in the performance of any work required in these Specifications, it becomes necessary to remove or disturb any structural part of the vessel, the contractor shall, upon completion of that work, reinstall or renew if necessary any affected structural part and restore to original conditions of durability, appearance, and seaworthiness. All temporary removals in the way of the work are to be replaced in good order.

4. Any and all removed equipment or parts remain the property of the government and is to be left aboard the vessel. The contractor shall re-deliver the vessel in the same clean and orderly condition as when received.

5. All work specified shall be accomplished and completed in conformity with the highest standards of shipbuilding practices. All items contained in these Specifications must be proved to the satisfaction of the Contracting Officer’s Representative (COR).

6. The term “or equal” means that components, equipment or material shall be equivalent in terms of performance, services required, compatibility with interrelated systems and arrangements and supportability over the service life of the components or equipment. In the case of component or equipment substitution for those components or equipment noted on the Contract Guidance Drawings or Specification, the Contractor shall submit a written request delineating the design and the performance data on both the specified and substituted piece of equipment for COR approval and if approved, the Contractor shall take full contractual and technical responsibility for ensuring installation of components or equipment’s or both and compatibility with interrelated systems.

7. The terms “Replace” or “Renew” mean to remove the existing unit, equipment, or systems, including all interferences and to install a new unit, equipment or system which is either identical to or equal to that which was removed; the installation shall include at a minimum all hook-up, supports, and adapters which are required to effect a fully operational installation complete in all respects.

8. Any repairs or other work resulting from recommendations or other discoveries after the vessel is docked are to be brought to the attention of the COR immediately by use of a contractor generated inspection report. Any such additional work will be subject to a delivery order. Additional work to be accomplished ONLY WHEN AUTHORIZED IN WRITING.

9. Because this craft is not considered deep-seaworthy, all work must be performed on this vessel in the San Francisco Bay area, such area to include the up-river areas of Sacramento and Stockton. The craft will be delivered to the contractor’s/sub-contractor’s work site prior to the commencement of work and picked up at the same facility upon completion of work by the Maritime Administration’s Reserve Fleet personnel. The contractor shall be responsible for shifting the vessel to and from drydock/travel-lift/marine railway and within the contractor’s facility during the course of work.

10. The contractor shall gas-free or inert all spaces affected by the work described in this Specification and is responsible for determining all spaces requiring gas freeing. All safety precautions contained in the United States Department of Labor Safety and Health Regulations for Ship Repairing, Title 29 CFR Parts 1501.10, 1501.11, 1501.12, 1501.14, and 1501.15 must be strictly observed. A copy of the gas-free certificate is to be presented to the COR before beginning work on the repairs. Initial Certificates are to be issued by a Certified Chemist, as will recertification if conditions change which will affect the Certificate. Gas-Free Certificates shall be updated daily by competent persons.

11. All welding shall meet ABS and USCG requirements and conform to American Welding Society (AWS) standards. All welds shall be cleaned prior to painting. All surfaces which have been cut, drilled, welded, or otherwise modified shall be cleaned, free of grease, slag and foreign matter; and painted in accordance with the coating sections of these Specifications. Prior to any surface preparations the contractor will conduct a joint inspection of the welding repairs with the COR.

12. All dirt and debris resulting from the work required by these Specifications shall be removed from the vessel and disposed of at contractor’s expense. All affected areas shall be left clean and in good order at the end of the dry-docking period.

13. The PF-613 MERLIN is an ex-US Coast Guard 41 ft. UTB built in 1977. The hull and deck are of aluminum construction. The cabin and cuddy are a single fiberglass unit bolted to the deck. The boat was re-engined to Tier 3 requirements in 2015. Vessel particulars are as follows:

· Length:40’ 08”
· Beam:13’ 05”
· Draft:4’ 02” max
· Displacement:28,500 lbs.
· Fuel Capacity:480 gal.
· Propulsion:Two Cummins QSB6.7 T3 Marine Diesels, each driving

a Twin Disc MGX-5065A Marine Transmission and a Michigan Wheel Dyna-Quad 26” x 26” NIBRAL propeller

· Horsepower:2 x 318 BHP
· Max Speed:26 Knots

· Existing coating above waterline: International Intershield 300V, Interthane 990HS

· Existing coating below waterline: International Intershield 300V, Interspeed 6400NA

14. To the maximum extent possible and consistent with the Federal Acquisition Regulations Part 23, the Government requires during the performance of the work under this Statement of Work (SOW) the Contractor to provide or use products that are: energy efficient (ENERGY STAR® or Federal Energy Management Program (FEMA)-designated); water-efficient; biobased; environmentally preferable (e.g., EPEAT-registered, or non-toxic or less toxic alternatives); non-ozone depleting; or made with recovered materials. Unless otherwise identified in this SOW, each recovered materials or biobased product provided and delivered must meet, but may exceed, the minimum recovered materials or biobased content of an EPA- or USDA-designated product. The sustainable acquisition requirements specified herein apply only to products that are required to be: (1) delivered to the Government during contract performance; (2) acquired by the contractor for use in performing services (including construction) at a Federally-controlled facility; (3) furnished by the contractor for use by the Government; or (4) specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance.”

Specifics for the PF-613 MERLIN

0001.0 Core Services

The intent of this specification is to haul out the vessel, prepare hull surfaces for recoating by sanding, recoat hull, and renew all anodes, and perform other miscellaneous repairs.

0001.1 HAUL OUT AND LAUNCHING

A. Haul out the vessel for inspection, coating and service as described herein. Provide suitable blocking and support under the hull. At the completion of the required work, launch the vessel. Inspect interior to assure there is no leakage.

B. Fleet the vessel for 100% coverage of new coatings.

0001.2 HULL AND TOPSIDE CLEANING AND INSPECTION

A. Secure all openings to prevent the ingress of wash water, including doors, hatches, vents, windows, speed sensor, transducer, engine cooling water intakes, overboards and wet exhausts. High pressure water-wash the hulls and topsides using high-pressure fresh water at a minimum of 3000 PSI to remove dirt, growth and salts. Exercise care to not remove any intact coatings. Examine the hull and topside for apparent damage and coating failure. Submit a written report within twenty-four (24) hours of conditions found showing discrepancies found and their location to the COR.

B. Handling, storage and disposal of hazardous waste, if any, generated as a result of the cleaning operation shall be the responsibility of the contractor, as being the generator. Disposal of any hazardous waste shall be at the contractor’s expense and in accordance with all local, state and federal regulations.

0001.3 ANODES

A. Remove 4 ea. Aluminum anodes from the transom, clean and renew after completion of coatings.

B. Renew 3 ea. clamp-on anodes from EACH propeller shaft.

0001.4 UNDERWATER HULL SURFACE PREPARATION

A. Notations of Hull Markings.

B. Sand the hull (both submerged and freeboard) with a dual action sander. Remove remnants of marine growth on submerged hull. Feather edge areas where coating has failed. Assume 10% of hull coatings exhibit failure.

C. Abrade 100%.

D. Solvent Wipe

E. Upon completion of sanding, the Contractor is to make a visual inspection of the entire hull. Contractor is to submit a written report of the conditions found during this inspection and make recommendations, if any to the COR.

F. Handling, storage and disposal of hazardous waste, if any, generated as a result of the blasting operation shall be the responsibility of the contractor, as being the generator. Disposal of any hazardous waste shall be at the contractor’s expense and in accordance with all local, state and federal regulations.

0001.5 FREEBOARD SURFACE PREPARATION

A. Spot bare metal power tool clean to SSPC-SP 3, any areas that are showing Active corrosion, pitting or loose paint. Feather back intact paint where adjacent to bare metal.

For bidding purposes, assume 10% of the total square footage of the underwater hull in scattered areas will require SSPC-SP 3 and feathering.

B. Abrade the freeboard coating to remove any loose paint and to roughen up the existing coating surface in preparation for recoating. Do not remove intact coating.

C. Solvent wipe the abraded coatings to remove any dust.

D. Upon completion this surface preparation, the Contractor is to make a visual inspection of the freeboard. Contractor is to submit a written report of the conditions found during this inspection within twenty-four (24) hours and make recommendations, if any to the COR.

E. Handling, storage and disposal of hazardous waste, if any, generated as a result of the blasting operation shall be the responsibility of the contractor, as being the generator. Disposal of any hazardous waste shall be at the contractor’s expense and in accordance with all local, State and Federal regulations.

0001.6 UNDERWATER HULL COATING

Contractor shall accomplish all coating processes in accordance with the coating manufacturer’s recommendations and under the supervision of the coating manufacturer’s representative. Final color scheme shall match original as delivered.

A. Mask the waterline and fendering.

B. Apply one (1) spot coat of US Paint etching primer G-9072 or equal to any bare metal areas.

C. Apply two (2) spot coats of International Intershield 300V or equal to any bare metal areas. Use contrasting colors to assure complete coverage of each coat.

D. Apply two (2) coats of International Interspeed 6400NA antifouling or equal, first coat Red, second coat Black.

0001.7 FREEBOARD COATING

Contractor shall accomplish all coating processes in accordance with the coating manufacturer’s recommendations and under the supervision of the coating manufacturer’s representative. Final color scheme shall match original as delivered.

A. Mask the waterline.

B. Apply one (1) spot coat of US Paint etching primer G-9072 or equal to any bare metal areas.

C. Apply two (2) spot coats of International Intershield 300V or equal to any bare metal areas. Use contrasting colors to assure complete coverage of each coat.

D. Apply one (1) full coat of Interthane 990HS or equal, Caribbean Blue.

0001.8 SHAFTING

A. Inspect shafting, strut bearings, stern tube bearings and mechanical shaft seals.

B. Measure and record bearing clearances. Provide a report of all findings to the COR within 2 days after completion of inspection.

C. Renew Port and Stbd shaft seal kits with the Duramax seal kit.

D. Any repairs required will be the subject of a change order.

0002.0 SUPPLEMENTAL WORK

The Contractor shall provide additional labor and materials, if requested by the Government, to address any emergent work which may arise throughout the contract period. These supplemental requirements shall be identified by a “Request for Pricing” issued by the COR or by a “Condition Found Report” issued by the Contractor. If a fair and equitable price can be agreed upon by both parties to perform the supplemental work, the COR and/or Contracting Officer (CO) may issue a Delivery Order to the Contractor which authorizes the Contractor to perform that work.

The total amount of Supplemental Labor and Materials/Subcontractor labor/services ordered shall be at the discretion of the COR and/or CO.

0002.1 Supplemental Labor

Supplemental Labor is considered labor performed by direct employees of the Contractor. (It does not include subcontracted labor/services). The Government has estimated a not to exceed of 100 supplemental labor hours for this service. The Contractor shall propose a fully burdened hourly yard-wide labor rate to perform supplemental labor. This rate shall be applicable 24 hours per day, seven (7) days per week and shall not be increased for overtime or penalty time and will be utilized in negotiating a fixed price Delivery Order for subsequent supplemental labor.

0002.2 Supplemental Material/Subcontractor Requirements

Supplemental Material/Subcontractor Requirements are materials and/or subcontracted labor or services which either the Contractor or the Government requires. The Government has provided a not to exceed amount of $20,000.00 for supplemental Materials. All costs for supplemental materials and supplemental subcontracted labor/services shall be a pass-through cost without any markup by the Contractor. (Note: Labor which the Contractor provides, using their own personnel, to procure and deliver supplemental materials aboard the ship or in support of subcontracted labor/services, is considered Supplemental Labor). All supplemental material and supplemental subcontracted labor/services which exceed $200.00 shall be supported by hard copies of vendor quotations, paid invoices and/or receipts, if requested by the COR.