6991PE22Q000011 ATTCH 1-SOW TSGB Golden Bear General Services Support 2022-2023(Revised 9-7-22).pdf

PDF 178 KB Posted

Attached to
6991PE22Q000011-0001 Amendment-Combined Synopsis Solicitation RFQ for TSGB Golden Bear General Services Support
Solicitation number
6991PE22Q000011
Issued by

About this file

This document is a combined synopsis/solicitation for general services support for a federal vessel. The solicitation seeks proposals for labor, materials, equipment and services to perform annual maintenance, repairs, inspections, calibrations, transportation, crane services and other general vessel support work. The work will be performed on board the MARAD GOLDEN BEAR DPO located in Vallejo, California, from October 2022 through September 2023. A site visit is available by appointment from September 12-15 and 19-21, 2022. Questions are due by September 21, 2022 and proposals are due by September 23, 2022 to the Department of Transportation Maritime Administration. Attachments include the statement of work, vendor price sheet, contractor past performance form, and applicable service contract wage determinations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TITLE: TSGB Golden Bear General Services Support Annual Contract SOW 2022‐2023

Dated: 9/7/22

Period of Performance: 10/1/22 to 9/30/23 or Not‐to Exceed 1 Year

OVERVIEW:

The intent of this work package is to provide labor, materials and equipment to accomplish and assist with annual maintenance, repairs, inspections, calibrations, transportation, crane service and other general vessel annual support.

Vendors must be on site where the ship is located to provide services. Contractor is to coordinate with various vendors as required to accomplish all items listed in this work package, as following:

Item 1: SR 0304923 ‐ Ship's Crane; Annual Maintenance and Repairs

Item 2: SR 0304924 – MES Crane and Labor Support

Item 3: SR 0304925‐ Regulatory Crane and Trucking Assistance

Item 4: SR 0304926 ‐ OWS Annual Inspections and Repairs

Item 5: SR 0304927‐ OCMs Annual Calibration

Item 6: SR 0304928 ‐ Torque Wrenches and Test Gauges; Annual Calibration

Item 7: SR 0304931 ‐ Sanitary Construction Toilet Services Provide

Item 8: SR 0304929 ‐ Deck Repairs Provide

Item 9: SR 0304929 ‐ Equipment and Parts Transportation Provide

Item 10: SR 0304931‐ Vessel Stores Crane Assist (boom truck Assist)

Item 11: SR 0304931‐ CSUM Parking

OPTION Item 12: SR 0304930 ‐ Interior and Exterior Door Repairs

OPTION Item 13: Supplemental Labor and Materials

A ship check is not required for bidding purposes. A ship check can be scheduled if contractor requests to visit the vessel.

ITEM 1

SR 0304923: Ship's Cranes; Annual Maintenance and Repairs

1.0 ABSTRACT

1.1 The intent of this work order is to furnish the services of a qualified crane technician to perform needed maintenance and repairs for the Aft EBI crane and the vessel stores crane annually prior to the start of the Golden Bear's cruise.

2.0 REFERENCES

2.1 Blueprints in ship's library.

3.0 ITEM LOCATION / DESCRIPTION.

3.1 EBI Crane, Main Deck.

3.1 Stores Crane, Main Deck

4.0 GOVERNMENT FURNISHED EQUIPMENT / MATERIALS / SERVICES

4.1 None

5.0 STATEMENT OF WORK

5.1 EBI Crane:

5.1.1 Contractor is responsible for all labor, transportation, rigging, and materials to complete the repairs and weight test as noted in the contract.

5.1.2 Contractor to supply two independent qualified crane technicians, one, Pacific Crane Certification or Equivalent and the other, an OEM crane representative who can supply proof of experience of having worked on at least three (3) similar cranes on ships or shore side installations.

5.1.3 Contractor’s primary focus is to do a complete inspection and survey of the crane with both the independent technician and the OEM crane representative and submit a Condition Found Report (CFR) stating any deficiencies.

Repairs will be done through the CFR process. Any future requirements and or recommendations are to also be addressed thru the CFR process and or developed into report for inclusion into next annual servicing requirements.

5.1.4 Upon completion of the repairs, the Contractor is to supply necessary weights and manpower to conduct the weight test. All weight testing will be conducted in the presence of the Chief Mate or his designee, with a five (5) day advance notice to the Chief Mate prior to the test date.

5.1.5 For the weight test procedure, contractor to perform an operational load test on the crane. The jib to be tested to 5,000 lbs. at 52 degrees. The main boom to be tested to 17,000 lbs. at 52 degrees. All weight testing to be witnessed to the satisfaction of the Chief Mate and or vessel representative, OEM and Pacific Crane Certification Representative or equivalent.

5.1.6 Contractor is to provide labor material and equipment to replace grease fittings and prove grease passages and grease lines are flowing free for the crane and associated blocks and sheaves. Contractor is to coordinate with vessel crew and crane technicians for type of grease and proper greasing procedures. Contractor is to clean up any excess grease developed from the greasing process.

5.1.7 After completion of all repairs and weight testing, the crane will be tested by the Chief Mate or his designee to prove acceptable performance and operation.

5.2 Stores Crane:

5.2.1 Due to recent stores crane installation this item to be minimal.

5.2.2 Contractor is to provide labor material and equipment for third party, Pacific Crane Certification or Equivalent to inspect the crane and submit a Condition Found Report (CFR) stating any deficiencies. Repairs will be done through the

CFR process.

5.2.3 Contractor is to provide labor material and equipment to grease the crane and associated blocks and sheaves.

Contractor is to coordinate with vessel crew and crane technicians for type of grease and proper greasing procedures.

Contractor is to clean up any excess grease developed from the greasing process.

6.0 PERFORMANCE CRITERIA / DELIVERABLES

6.1 Performance:

6.1.1 The period of performance shall be from the date of contract award to the required performance completion date. Items must reach completion before the vessel goes on cruise, if at all possible. If for any reason the Contractor feels that the requirement cannot be met before the cruise period, any changes must be agreed upon in writing between the COR and the Contractor.

6.2 Deliverables:

6.2.1 Contractor is responsible for submission of a final report upon completion of repairs and weight testing of the crane. Report to include but is not limited to the following: condition found, certificates, repairs completed, weight testing results, signed off work sheets for all work accomplished, and recommended additional repairs or maintenance needed to be completed by the crew in the future.

6.2.2 Two (2) each of the reports to be in hard copy, bound format for one (1) each to be submitted to the Chief Mate and Chief Engineer. Electronic copies to be submitted to the Chief Mate, Chief Engineer, and Maritime Administration

(MARAD) Marine Surveyor/Port Engineer.

ITEM 2

SR 0304924: MES Crane and Labor Support

1.1 This item describes the requirement for the contractor to supply a crane to support Marine Evacuation Slide (MES) lifts and associated labor to assist with the annual servicing requirements for the vessel two (2) MES systems.

2.1 None

3.0 ITEM LOCATION / DESCRIPTION

3.1 After part of the Forward House Port and Starboard sides of the vessel

3.2 Vessel Pier

4.0 GOVERNMENT FURNISHED EQUIPMENT / MATERIAL / SERVICES

5.1 Contractor to coordinate and provide a crane with height and capacity to reach and service the port and starboard MES systems. Contractor to verify height, reach, and weight requirements with the vessel. Contractor to note that crane size requirements on various days may be different, as servicing of the pier side MES will not require reach from the pier across the vessel to the unit.

5.2 Contractor to coordinate and provide the appropriate crane size to meet MES servicing requirements for that specific days activities. Contractor to provide crane service for four (4) separate days. Contractor to coordinate with PE and OEM Representative for specific days which the crane will be required. For pricing purposes contractor is to price three (3) days for a crane sized to reach the across the vessel and one day for which the crane will reach the pier side

MES.

5.3 Contractor is to provide labor material and equipment including rigging to assist with servicing both the port and starboard side MES’s. One unit is to be moved from one side of the vessel to the other for deployment, lowering to the water then brought pier side and back up onto the dock and packaged for shipping. Once certified the other unit is to be placed in the outboard locker. Once the deployed unit returns it is to be placed in the pier side locker. Upon completion both units are to be left in an at sea ready for use condition. For pricing purposes contractor is to supply four (4) qualified individuals for a total of six (6) days, ten (10) hours per day for a total of 240 hours. Contractor is to coordinate labor requirements with PE and OEM representative and note that not all days and hours will be consecutive.

6.0 DELIVERABLES

6.1 Contractor to provide documentation in the form of a CFR report documenting crane and labor use requirements

6.2 Contractor is to provide a CFR if additional labor, materials and or lifting support is required.

ITEM 3

SR 0304925: Regulatory Crane and Trucking Assistance

1.1 This item describes the Contractor Crane assisting removal, testing and reinstallation of lifeboats to allow for

OEM regulatory inspections, service, weight test, releases, and repairs to both the davits and the lifeboats as required.

Contractor is to coordinate with OEM representative for dates and times crane service is required. Contractor is to plan for a minimum of four (4) separate dates and is to plan for four (4) full days of labor and equipment to support which is to include a crane and a truck to secure the boat to and transport from the dock as required for this work.

2.1 Life boats Technical manuals and drawings.

3.1 Item Location Port side of ship – dock area

3.2 Item description: Provide labor, material and equipment and a properly sized crane to assist life boat OEM and crew to remove, test and re‐install life boats #2 and #4 from the davits and life boats #1, #3 from the water.

3.3 Weights of boats:

a) #1 and #2 boat = Contractor to verify with vessel

b) #3 and #4 boat = Contractor to verify with vessel

5.1 Supply a crane capable of handling the weight and height of the life boats to and from their davits and from the water. Contractor to supply rigging or a strong back to connect and support boat safely to/from the davits and the water. Contractor is to supply labor material and equipment to transport the boats from the dock and return them to the dock following necessary repairs and or testing.

5.2 Supply a crane operator who is a licensed crane operator and has made at least 3 similar lifts with same reach and weight of what is detailed in this proposal.

#1 and #2 boat = Contractor to verify with vessel

#3 and #4 boat = Contractor to verify with vessel

5.3 Contractor is responsible for determining the type of crane and lift capabilities during the ship check for this work and what type of rigging is necessary for the lifts. OEM is to be consulted as to the proper way to lift the boats without causing damage, Ref OEM David Jones – Palfinger – Cell 337‐577‐6045

5.4 Contractor needs to take into account the following:

5.4.1 Weight and reach of each lift

5.4.2 Crane footprint and available dock space

5.4.3 Any Rigging needed to safely handle the boats

5.5 Contractor is to supply labor material and equipment to place the boats on a truck, secure them and move them as needed to the parking lot, and or to a location for testing. Contractor is to plan for four (4) non‐consecutive separate moves and is to plan for four (4) full days of labor and equipment to support which is to include a crane and a truck to secure the boat to and transport from the dock as required for this work.

5.6 Contractor is to Coordinate this work to be done with Chief Mate or equivalent vessel crew with whom the

Contractor will have to arrange for dock availability and entry to and from the dock

5.5 Contractor is to plan for a minimum of four (4) separate dates for this work and is to provide labor material and equipment for four (4) full work days. Contractor is to assume that the dates will not be consecutive. Any additional days required are to be submitted via CFR and are subject to approval.

6.1 Supply ship and COR with the crane and rigging specifications that Contractor will use for future use in electronic format to Chief Engineer and Chief Mate and COR

ITEM 4

SR 0304926: OWS ‐ Annual Inspections and Repairs

1.1 The intent of this work order is to test and report any deficiencies while operating the oily water separator annually prior to the start of the Golden Bear's cruise.

2.1 OEM technical manuals in ship's library.

3.1 Ecostream, Sigma manufacturer, Engine Room.

5.1 Contractor to provide the services of a factory trained and certified technician or equivalent to inspect, test, and certify the correct operation prior to the USCG COI normally planned for the last two (2) weeks of March.

5.2 Contractor to supply all labor and materials necessary to do the testing and inspection of the OWS units, two (2) each of different manufacturers. Crew will assist as necessary. All shutdown and alarm functions to be tested and reported as satisfactory and proven to the First Assistant Engineer or Chief Engineer.

5.3 Contractor to have permission from the Chief Engineer before operating the OWS and to log the exact dates and times of such to allow necessary reporting in the ship’s Oil Record Book.

5.4 Contractor can use ship’s spares to expedite the possible repairs of any of the two (2) OWS’s. Parts used are to be presented as a CFR and are only to be supplied upon written approval of said CFR.

6.1 The period of performance shall be from the date of contract award to the required performance completion date. Items must reach completion before the vessel goes on cruise, if at all possible. If for any reason the Contractor feels that the requirement cannot be met before the cruise period, any changes must be agreed upon in writing between the COR and the Contractor.

6.2 Contractor to supply inspection report to be used for the USCG COI and ABS survey.

ITEM 5

SR 0304927: OCMs ‐ Annual Calibration

1.1 The intent of this work order is to perform a calibration of the oil content meters (OCMs) annually prior to the start of the Golden Bear's cruise.

2.1 Manufacturer technical manuals in ship's library.

3.1 Two (2) Shimadzu Model ET‐35A Oil Content Meter for the Sigma Oily Water Separator, port side, engine room.

3.2 One (1) Deckma Hamburg Type OMD‐2005 Measuring Cell for the Alfa Laval Oily Water Separator, starboard side of engine room.

4.1 There is one (1) Shimadzu Oil Content Meter in service and one (1) spare for the Sigma Oily Water Separator ‐ both are calibrated annually.

4.2 There is one (1) Deckma Hamburg Measuring Cell in service and three (3) spares for the Alfa Laval Oily Water

Separator and all four (4) are calibrated every five (5) years as required by the International Oil Pollution Prevention

(IOPP) certificate, unless a failure occurs requiring immediate service.

5.1 Contractor to receive three (3) each OCM from the First Engineer or Chief Engineer.

5.2 Contractor to transport three (3) OCM to/from the shop for recalibration and perform repairs as determined after opening and inspecting upon receipt from the repair shop.

5.3 Each of the OCMs are to be recalibrated and affixed with a stamp clearing indicating the date of calibration and the shop that performed the repairs/calibration. The job will not be considered completed until this stamp is affixed and witnessed by the First Engineer or Chief Engineer.

5.4 Each of the OCMs are to have a letter stating the calibration procedures performed and the resultant readings to be used for regulatory purposes. The job will not be considered completed until this documentation is received by the ship.

6.1.1 The period of performance shall be from the date of contract award to the required performance completion date. Items must reach completion before the vessel goes on cruise, if at all possible. If for any reason the Contractor feels that the requirement cannot be met before the cruise period, any changes must be agreed upon in writing between the COR and the Contractor.

6.2 Deliverables:

6.2.1 Each OCM to have certificates, stating date and calibration results, given to the ship to be used for Port State

Control.

6.2.2 Electronic copy of each to be given to the COR.

ITEM 6

SR 0304928: Torque Wrenches and Test Gauges; Annual Calibration

1.0 ABSTRACT:

1.1 The intent of this item is to provide labor, material, and equipment to accomplish the following to ensure compliance with the ISM code and chapter IX of SOLAS, the ship is required to establish the accuracy and reliability of a certain inventory of instruments, on which further calibration of the ship’s stock of instruments can be accomplished.

Contractor is to provide labor material and equipment for annual calibration of the equipment listed.

2.0 REFERENCES:

3.0 LOCATION OF WORK:

3.1 N/A

4.0 OWNER FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 Gauge Pressure Tester, Model 3112, Serial # 11469 ‐ King Nutronics Corporation, Van Nuys, California.

4.2 Mechanical Torque Wrench,3/4‐inch drive ‐ Stanley Proto. (quantity 2)

4.3 Digital Torque Wrench, 1/2‐inch drive ‐ CDI Torque Products Model 2503CF3

4.4 Digital Torque Wrench, 3/8" drive ‐ Armstrong Industrial

4.5 Digital Torque Wrench, 3/8" Drive ‐ CDI Torque Products Model 1002CF3

4.6 Winters Gauge, 0‐160 psi

4.7 Wika Gauge, 0‐100 psi, S/N: 03061705

4.8 Ashcroft Gauge, 0‐30 inHg, S/N: 8232

4.9 Ashcroft Gauge, 0‐300 psi, S/N: 8234

4.10 Marsh Gauge, 0‐30 psi, S/N: 6981

4.11 Marsh Gauge, 0‐600 psi, S/N: 6282

4.12 USG Gauge, 0‐1000 psi, S/N: 6279

5.0 STATEMENT OF WORK:

5.1 The instruments in Item 4 are to be picked up from vessel and calibrated provided with documentation consistent with ANSI/NCSL standard Z‐540 and ISO standard 10012. Return to vessel upon completion of calibration.

Contractor shall coordinate with the Chief Engineer for pick‐up and redelivery.

6.0 CONTRACTOR DELIVERABLES:

6.1 Provide Port Engineer an electronic copy of a service report describing all test results and work performed under this work order. Note that the service report must be received ASAP after completion of work and must be received prior to invoicing.

ITEM 7

SR 0304931: Sanitary Construction Toilet Services Provide

1.1 The intent of this work order is for the contractor to supply sanitary construction style temporary toilets and hand washing station for use during the general services contract. Contractor is to supply regular service of rental toilets to set‐up for operation, periodic weekly service cleaning and subsequent removal once the vessel has left the pier for its annual cruise.

3.1 California Maritime Academy Pier Area

5.1 Contractor is to provide labor, material and equipment, to transport and perform all operations necessary to supply, service, and relocate portable toilets and hand washing station. Contractor is to coordinate with vessel crew for location and servicing of portable toilets.

5.2 Contractor is to provide regular service to include delivery of rental toilets and hand washing station, set‐up for operation, periodic weekly service cleaning and subsequent removal from location. Cleaning shall also include any minor repairs and parts discovered at time of servicing the unit. All portable toilets are to be graffiti‐free and constructed of poly‐plastic or heavy‐duty type fiberglass and to be of sufficient height to prevent it from being blown over.

5.3 Contractor is to include vandalism insurance which must be included in the unit cost of the portable toilets. The contractor shall be responsible for any vandalism to the portable units and there shall not be any additional charges for vandalism repairs. All vandalism insurance shall be included in the weekly rental fee for the portable toilets.

5.4 Contractor is to provide for any portable toilet delivered in an unserviceable condition, or any unit rendered unserviceable by defect, vandalism, acts of mischief, or acts of nature and all shall be the responsibility of the contractor to supply a toilet in serviceable condition within forty‐eight (48) hours of report, at no additional cost.

6.1.1 The period of performance shall be from the date of contract award to when the vessel has left for its annual cruise (anticipated mid May 2023.)

6.2 Deliverables:

6.2.1 Contractor is responsible for submission in the form of CFR for invoicing purposes. Contractor is to invoice for costs on a quarterly (3 month) basis as well as a final CFR upon completion of the general services contract.

6.2.2 Contractor to provide cost breakdowns as they relate to labor, material, sub‐contractors and travel costs, if applicable. Supplementary costs must be approved by the COR by written CFR, RFP Pricing Quotation, and Delivery

Order process.

ITEM 8

SR 0304929: Deck Repairs Provide

1.1 Various locations on the ship have internal decks that need to be repaired/renewed. Total area to be dealt with is approximately 600 square feet of deck that needs to be removed and the underlayment inspected. If the underlayment has failed, then it must be removed and the steel deck scaled to SP11 and primed and coated then new underlayment installed.

3.0 LOCATION

3.1 Six (6) separate locations TBD in the Aft and Forward houses and the Galley Area. Contractor to coordinate with vessel crew to determine exact locations.

4.0 DESCRIPTION

4.1 Contractor responsible for making repairs to flooring such that patched areas have a smooth transition and are no longer considered a safety hazard. Minimum requirements are stated below but not limited to:

4.1.1 Removal of all damaged deck flooring down to the steel deck and dispose of properly the old deck materials.

4.1.2 Inspect the steel deck and submit CFR to MARAD Surveyor for those areas that need repairs prior to laying in new underlayment and top coat and sealer

4.1.3 Scale and clean the steel to SP3 in preparation painting same to seal prior to laying in underlayment. Contractor is responsible for tenting off living areas and providing ventilation to remove dust fumes from being drawn into the house areas

4.1.4 All materials to be epoxy based for the underlayment and top coat and sealer. Contractor to get approval from

Chief Mate prior to beginning the installation of the underlayment to make sure that the deck steel is prepared properly.

4.1.5 Once the underlayment is ready to be installed it must be keyed into the remaining deck materials so that there is no seam that will allow moisture or water to enter areas under the deck coating. This will be a function of the deck preparation and epoxy underlayment and top coat and sealer where they join the existing/remaining deck coating

4.1.6 Contractor shall match surrounding areas to the extent possible supplying and installing similar products.

Contractor is responsible for all interference removal and reinstallation necessary to gain access to the affected decking.

Contractor is to supply all necessary labor, materials, transportation and rigging and disposal of removed materials and debris. The job scope has to be scheduled and coordinated with Chief Mate for locations where cadets are currently housed.

5.1 All work must be in accordance with standard marine practice and be in compliance with ABS and USCG rules.

5.2 Contractor must have done the same type of work on at least 3 ships or multiple jobs aboard the same ship within the last 3 years and supply proof of that experience with a point of contact for each ship or the multiple jobs aboard one or more ships.

5.3 Contractor responsible for all labor, materials, transportation, rigging and disposal of debris and old decking to be disposed of properly.

5.4 Contractor to cover or tent all areas being repaired to prevent dust and debris from being drawn into the ship interior or adjacent rooms by tenting or cover and ventilation supplied by Contractor

5.5 Contractor to remove all interferences that are necessary to insure success of the new decking coating and same interferences to be returned to as found or better condition. If damage is found that requires repairs, bring that to the attention of the attending Marine Surveyor via CFR with costs for materials and labor to repair same

Contractor is responsible for the actual measurements of the job as estimated is approximately 600 square feet.

Contractor to complete their work to the satisfaction of the Chief Mate and attending MARAD Surveyor.

5.6 Contractor to remove as required all deck covering and below underlayment and dispose of properly per local, state and federal regulations.

5.7 Contractor to fill in with an epoxy underlayment to insure that there are no “tripping hazards” and to assure that any irregularities in the steel deck are prepared properly for the top coat and sealer.

5.8 Contractor to supply all labor and materials and transportation and rigging to install any needed steel coaming or trim needed to support the Epoxy decking materials.

5.9 Contractor to supply all necessary Epoxy to cover the new prepared deck steel and underlayment with at least 1/8” or more thickness and then two (2) coats of sealer with some “nonskid”

5.10 Contractor to reinstall all interferences, including supplying new contractor supplied rubber / vinyl wall cove base to match removed / existing.

5.11 Contractor is to supply labor material and equipment to patch the areas within the statement of work with similar and matching surrounding materials. Contractor is to verify what materials are to be used and that they are to be of marine grade.

5.12 Contractor is to supply labor material and equipment to cover any areas needing cure time which may be required to walk on prior to proper curing.

6.1.1 The period of performance shall be from the date of contract award to the required performance completion date. Items must reach completion before the vessel goes on cruise, if at all possible. If for any reason the Contractor feels that the requirement cannot be met before the cruise period, any changes must be agreed upon in writing between the COR and the Contractor.

6.2 Deliverables:

6.2.1 Contractor to supply a list of materials used including color of the Epoxy underlayment and top coat and sealer.

6.3 Contractor is responsible for submission of CFR’s for any additional locations.

6.3.1 Contractor to provide cost breakdowns as they relate to labor, material, sub‐contractors and travel costs, if applicable. Supplementary costs must be approved by the COR by written CFR, RFP Pricing Quotation, and Delivery

ITEM 9

SR 0304931: Equipment and Parts Transportation Provide

1.1 The intent of this work order is for the contractor to supply labor rigging and transportation services to move spare parts to and from the vessel, including from the vessel’s engine room. Contractor is to supply equipment and crane service to move vessel parts from the vessel to the MARAD warehouse located in Alameda, CA and return to the vessel located in Vallejo, CA.

3.2 MARAD Warehouse located in Alameda, CA

3.3 Vessel Engine Room

5.1 Contractor is to provide labor, material and equipment, including cranes service to transport four (4) main engine heads to and from the vessel engine room, vessel pier and MARAD warehouse.

5.2 Contractor is to provide labor, material and equipment, including crane service to make four (4) additional day trips to the vessel warehouse with contractor supplied flatbed truck to and from the vessel, vessel pier and MARAD warehouse for misc. warehouse items, ie, washers, dryers, spare parts etc. this is to include items which are to be taken from the ship to the warehouse. Contractor is to coordinate with vessel crew and warehouse so as items are moved as efficiently as possible minimizing the amount of moves that are needed, ie. if a trip is to be coordinated such that items are to be both dropped off and picked up at the warehouse.

6.1.1 The period of performance shall be from the date of contract award to when the vessel has left for its annual cruise (anticipated mid May 2023.)

6.2 Deliverables:

6.2.1 Contractor is responsible for submission in the form of CFR for invoicing purposes and tracking of the number of trips. If additional trips are required Contractor is to submit CFR for additional trips and they will be subject to approval.

6.2.2 Contractor to provide cost breakdowns as they relate to labor, material, sub‐contractors and travel costs, if applicable. Supplementary costs must be approved by the COR by written CFR, RFP Pricing Quotation, and Delivery

ITEM 10

SR 0304931: Vessel Stores Crane Assist (Boom Truck 5 Lifts)

1.1 This item describes the boom truck and shore side crane assistance to support vessel operations and repairs ongoing until the vessel departs on cruise estimated to be in May of 2023. Contractor is to provide labor, material, equipment, and an operator for boom truck service from the pier to the vessel’s deck area from September of 2022 thru

May of 2023. Contractor is to provide for five (5) half days of lifts with a boom truck including operator and labor support.

3.1 Vessel Main Deck

3.2 CSUM Vessel Pier

3.3 Vessel Stores Hatch and Lower Stores Area

5.1 Contractor to supply a boom truck with reach and weight capacity to move palatized materials and equipment from the dock to the vessel’s main deck area. Contractor is to supply labor, rigging and support to move materials and equipment. Contractor is to estimate five (5) half days (4 hours) of boom truck assistance lifts including operator and labor support. Contractor is to coordinate with vessel crew and COR for scheduling of days in which the boom truck will be required. Also, contractor is to note that days required for crane use may not be sequential.

5.3 Contractor is to provide pricing for one (1) half days (4 hours) of boom truck assistance lifts including operator and labor support. Contractor is to track use via CFR and is to provide a credit if boom truck is not used., If more boom truck support is required contractor is to submit additional support as a CFR and they will be subject to the CFR approval process.

6.1 Contractor to supply the ship and COR with information on the boom truck particulars and shore side crane particulars that Contractor will use. This information will be used for price comparison and for future use. Contractor to submit in electronic format to Chief Engineer and Chief Mate and COR.

6.2 CFR’s for actual boom truck and shore side crane use.

ITEM 11

CSUM Campus Parking Permits

1.1 The intent of this work order is for the contractor to purchase CSUM Parking Permits in support of the above listed work items for access to the pier and for parking in the area in or about the pier. Contractor is to price costs for 5 permits in support of 5 vehicles for 8 months. If additional months and or passes are required they are to be submitted thru the CFR process. If CSUM facility alters parking situation, such that contractor access to the vessel is allowed without a pass. Contractor is to supply a credit for any passes not purchased.

5.1 Contractor is to provide labor, material and equipment, to meet CSUM parking requirements and is to provide 5 permits in support of 5 vehicles for 8 months.

5.1.1 Contractor is to show line item estimated pricing for this item in bid submittal.

5.2 Contractor is to provide a CFR if additional parking is required.

5.3 Contractor is to provide a credit for any unpurchased parking permits if CSUM alters dock parking area such that a parking permit is not required for access to the vessel.

6.1 Contractor to provide CFR if additional parking passes are required.

OPTION ITEM 12

SR 5196012 Interior and Exterior Doors Repairs

1.1 The intent of this work order is to make various door repairs throughout the vessel. Doors include interior and exterior doors with issues ranging from door deterioration, frame deterioration, hinges, latching and closing mechanisms which are broken and or worn out and no longer functioning properly. Contractor is to refer to the door report spreadsheet PDF and is to supply hinges, door closure mechanisms and is make repairs to doors and door frames as identified to repair to normal working conditions. Contractor is to coordinate with vessel crew to supply materials for replacement of door handle and associated latching mechanism. All other materials are to be supplied by the contractor.

If door handle and latching mechanism materials are unavailable on the vessel contractor is to supply CFR for approval to have contractor supply the materials.

2.1 Refer to Training Ship Golden Bear Ship Doors Report

3.1 All Vessel Doors, Various locations thru out the vessel.

3.2 Refer to Training Ship Golden Bear Ship Doors Report

5.1 Contractor is to provide labor, material and equipment, to repair doors as described and noted in the Training

Ship Golden Bear Ship Doors Report. Contractor is to supply all materials for repair with exception to handle and latching mechanism. Contractor is to supply labor material and equipment to change out hinges to new if they are bent, broken and or missing. This is to include modifications to the door and or door frame for installation of the new hinges.

Contractor is to supply and install new door closures for closures which are not working properly, this is to include any modifications and associated hardware for mounting of the door closure to ensure proper operation.

5.2 Contractor is to coordinate with vessel crew for latching mechanism materials and spare parts. If latching mechanism parts are not available, contractor is to provide a CFR subject to approval for contractor to supply the parts required.

5.3 Contractor is to note that any doors impacting the deck which cannot be adjusted and require the deck to be redone are to be noted in a CFR and addressed thru the CFR process. Decking repairs may be accomplished via a separate SR subject to approval and CFR process.

5.4 Contractor is to provide line item pricing for this individual item and is to note that this item is subject to availability of funds and may or may not be utilized during the contract period of performance. As such it is listed as an option item. If additional this item is utilized and additional time to accomplish this item is required contractor is submit

CFR to request date extension.

6.1 Contractor to provide CFR for any additional door repairs as required.

OPTION ITEM 13

Supplemental Labor and Materials

1.1 This work package includes contractor support for general items in support of annual regulatory required testing, calibration and repairs and maintenance of associated equipment and vessel maintenance deficiencies. Any additional items that are required and are considered to be within the scope of work, however, were not listed in the statement of work (SOW) above are to be submitted as a CFR. The CFR is to be approved prior to the contractor incurring any additional costs for associated CFR.

3.1 Various Throughout Vessel

5.1 Contractor is to provide a written condition found report (CFR) for work items as denoted above which will require additional costs to complete the requirements of the work package which were not stated in the original statement of work (SOW.)

5.2 Contractor is not to proceed with a CFR until it is approved by the ACO or COR with ACO permission.

5.3 If approved, the contractor is to provide labor material and equipment to accomplish the CFR.

5.4 Contractor is to supply a predetermined supplemental labor rate for any CFR’s required.

6.0 ADDITIONAL WORK AND SUPPLEMENTARY

6.1 Contractor to submit a written Condition Found report (CFR) to the Contracting Officer Representative (COR) for any additional work outside the SOW. Approval for additional work must be approved by either the COR ($10,000.00 or less) or the Contracting Officer (over $10,000.00)

6.2 Contractor to provide cost breakdowns as they relate to labor, material, subcontractors and travel costs, if applicable. Supplementary costs must be approved by COR by written CFR, RFQ, Quotation and Delivery Order process.

17 A) Supplementary Labor = 300 hrs @ $____/Hr. = Total $___________. The Government is estimating 300 hours of supplemental labor for this project. The quoter shall provide a fully burdened hourly labor rate x 300 hours to arrive at a projected amount for labor for this project.

17 B) Supplementary Material = $24,000. The Government will provide a not to exceed amount of $24,000.00 for supplemental material.