QnA 3.27.23.pdf
PDF 89 KB Posted
- Attached to
- UT FLAP 2016(1) Lion Boulevard Federal contract opportunity
- Solicitation number
- 6982AF23B000011
About this file
This document contains questions and answers regarding a federal solicitation for a transportation project. The solicitation is for the UT FLAP 2016(1) Lion Boulevard project, which involves widening approximately 0.30 miles of Lion Boulevard in Springdale, Utah to provide additional parallel on-street parking, curb, gutter, sidewalk, and ADA ramps. The scope of work also includes permanent striping, installation of conduit and pull boxes for future utilities, and fence work. Bidders should assume the project requires replacement of two standard MUTCD sign panels with single, 2-inch square tubular steel posts, as contingency quantities approved by the Contracting Officer. The completion date is October 13, 2023, with a Notice to Proceed date of May 30, 2023.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tabulation of Bids UT FLAP 2016(1) Lion Boulevard.pdf | ||
| Bid Opening Summary Lion Blvd.pdf | ||
| Lion Blvd Interested Vendors 4.3.23.pdf | ||
| A001.pdf | ||
| 6982AF23B000011.pdf | ||
| UT FLAP 2016(1)_100 Plans_stamped rev.pdf | ||
| FP-14.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for UT FLAP 2016(1) Lion Boulevard
March 27, 2023
Questions Answers 1 I see the bid item - A0740 - SIGN SYSTEM - 2 EACH. However, I can't see anywhere in the plans where it lists the types of signs being used for this project and where they are to be installed. I see the detailed section where it shows all the different types , I just do not know what type we are using.
As noted on plan sheet B5, the 2 signs are shown as a contingency quantity as approved by the CO. The Town recently installed 2 signs that may or may not need to be replaced as part of this project. For bidding purposes, assume the signs will be replaced and that they are standard MUTCD sign panels with single, 2” square tubular steel posts.
Going through the bid documents, in the Solicitation, Offer and Award section, it does not give us a time frame to have the project completed by.
On page A-1, section 11 - it has an asterisk where the number of calendar days to complete the work should be. It references section 108.01 - but then it still has no length of time listed in that section either, but I do see penalty amounts listed at the end of section 108.
The completion date is in Section 108.01, on page E-11 of the IFB. It is listed as October 13, 2023.
FAR Clause 52.211-10 on page C-3 of the IFB provides a Notice to Proceed Date by May 30, 2023.