Bid Opening Summary.pdf

PDF 237 KB Posted

Attached to
CA FTFW MODO VARIOUS ROUTES Routes 010, 900, 901, 300
Solicitation number
6982AF21B000014
Issued by

About this file

This bid opening summary document outlines bids received for a federal highway construction project in Modoc National Wildlife Refuge in California. The project involves pavement preservation work, gravel rehabilitation on multiple routes, and accessibility improvements at several locations within the refuge. Seven contractors submitted bids by the June 24, 2021 deadline. Eagle Peak Rock & Paving provided the lowest schedule and total bid at $1,453,286 and $1,686,686 respectively. The second lowest bidder was Hooker Creek, Inc. The engineer's estimate for total cost of the project was $1,247,500. Construction is anticipated to take place between July and October 2021 to improve routes 010, 900, 901, and 300 in the refuge.

View the file

Other files

File Type Posted
Tabulation of Bids.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
6982AF21B000014.pdf PDF
CA_FTFW_MODO_VariousRoutes_Plans_100_4-22-21.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Opening Summary

Project Number: CA FTFW MODO VARIOUS ROUTES Time: 2:00 p.m. MST Bid Opening Officer: Craig Holsopple

Project Name: Routes 010, 900, 901, 300 Bid Opening Date: 6/24/2021 Bid Opening Location: Lakewood, CO

Amendments: (1) 06/03/2021 (2) _____________(3) (4)

Bidder’s Name Schedule A Option X Option Y BID TOTAL

1. Eagle Peak Rock &

Paving, Alturas, CA $1,453,286.00 $145,940.00 $87,640.00

$980,200.00

2. Hooker Creek, Inc., Red Bluff, CA

3.

4.

5.

6.

7.

8.

Engineer’s Estimate $1,093,350.00 $96,910.00 $57,240.00 $1,247,500.00

$1,686,686.00

$796,850.00 $124,040.00 $59,310.00

06/17/2021