Bid Opening Summary.pdf

PDF 87 KB Posted

Attached to
CO ERFO 250(1) Alamosa Canyon Road
Solicitation number
6982AF21B000010
Issued by

About this file

This bid opening summary documents the bids received for the CO ERFO 250(1) Alamosa Canyon Road project. The project involves replacement of one damaged drainage structure with a concrete box culvert, as well as debris removal, timber decking construction, and pedestrian bridge rail construction. The project is located in Rio Grande County, Colorado within the Rio Grande National Forest.

Three bids were received by the June 3, 2021 deadline. Robins Construction, LLLP provided the lowest bid at $575,035, followed by Meridian Engineering at $665,460, and Siete, Inc. at $545,990. The engineer's estimate for the project was $512,643.50. The award has not yet been made.

View the file

Other files

File Type Posted
6982AF21F000010.pdf PDF
CO_ERFO250(1)_All_Sheets.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Opening Summary

Project Name: Alamosa Canyon Road Project Number: CO ERFO 250(1) Bid Opening Date: 6/3/2021 Time: 1:00 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: Craig Holsopple

Amendments: (1) (2) _____________(3) (4)

Bidder’s Name Schedule A BID TOTAL

1. Robins Construction, LLLP

Antonito, CO

$575,035.00

$575,035.00

2. Meridian Engineering Tucson, AZ

$665,460.00

$665,460.00

3. Siete, Inc.

Rye, CO

$545,990.00

$545,990.00

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

Engineer’s Estimate

$512,643.50 $512,643.50

File details come from the government source that posted it. Updated .