This document contains questions and answers from a pre-bid meeting for the WY FLAP 30400(1) Gros Ventre Road federal contract opportunity. The project consists of safety improvements along approximately 3.75 miles of Gros Ventre Road in Wyoming, including minor widening, resurfacing, drainage work, and optional paving of pull-offs and parking lots. Key details addressed in the questions and answers include clarification that plug pipe refers to culvert abandonment per specification FP-14 203.04(b); confirmation that estimated quantities in the tabulation include 2100 cubic yards of sub-excavation, 500 cubic yards of Type 1 sub-excavation, 1000 cubic yards of ditch excavation, and that geogrid will be installed per detail 204-B at 12-inch vertical spacing; and confirmation that material from the US Forest Service pit is available for use at the contractor's discretion for riprap production.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for WY FLAP 30400(1), Gros Ventre Road
May 22, 2020
Questions Answers 1 I can’t find anything in the specs on what PLUG PIPE is? What type of plug do we need Please refer to FP-14 203.04 (b) for abandoning culvert requirements.
2 Sub-excavations payment says you only pay for ex out portion, do we need to include geogrid and import from FS Pit, how do we calculate geogrid by the cy WASTE ITEM 3600cy = 2100cy SUB-EXCAVATION Type 1, 500cy SUB-EXCAVATION, 1000cy DITCH EXCAVATION, is this correct, and where is the waste site?
These numbers reflect what is shown in the Tabulation of Quantities and are the estimated quantities for the project. Geogrid will be required to be installed per detail 204-B at 12-inch vertical spacing. Waste material per FP and SCR Section 203.05.
3 Can we make RIPRAP in the forest service pit The material is available for use. Use of the USFS pit material is at the discretion of the contractor