QnA_9.30.2019.pdf

PDF 202 KB Posted

Attached to
CO FLAP SUM 91(1), Fremont Pass Trail
Solicitation number
6982AF19B000006
Issued by

About this file

QnA 9.30.2019

View the file

Other files

File Type Posted
Bid_Tabulation.pdf PDF
Bid_Opening_Summary_.pdf PDF
QnA_10.18.19.pdf PDF
A003_-_Plan_Sheet_B5.pdf PDF
QnA_10.16.2019_.pdf PDF
QnA_10.15.2019__.pdf PDF
Amendment_002.pdf PDF
QnA_10.10.19.pdf PDF
QnA_10.7.19.pdf PDF
QnA_10.4.19.pdf PDF
QnA_10.3.19.pdf PDF
Amendment_A001_.pdf PDF
QnA_09.23.19.pdf PDF
SUM91-1-Final_Hydraulics.pdf PDF
CO_FLAP_SUM_91(1)_Fremont_Trail_-_Final_Pavement_Tech_Memo.pdf PDF
6982AF19B000006.pdf PDF
CO_FLAP_SUM91(1)_Plans_-_Final.pdf PDF
CO_FLAP_SUM91(1)_XS_-_Final.pdf PDF
Final_Geotechnical_Report.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for CO FLAP SUM 91(1) Fremont Pass Trail

September 30, 2019

Questions Answers 1 Can you tell me if there is a prebid walk through on this project? Please see FAR 52.236-27 Site Visit (Construction) on page B-24 within the Solicitation.

2 On drawings RG3118-K, the Typical Bridge Section calls out for a 5/4 x 6 Timber hardwood handrailing. What species of hardwood? Also does it need to be treated? How are these attached to the metal assembly?

As this is a prefabricated bridge we are only showing generic details so we can’t give specific answers to the question as these may vary depending on the fabricator. That said, we have noted that IPE has been used as hand railing material and does typically not require pressure treatment. The connection is typically by “L” bracket attached to the truss members.

3 In this computer age, autocad files and/or digital terrain models for the existing conditions and proposed grades allow contractors to better prepare cost estimates. Will you provide these files?

Yes.

4 Where can we get a list of plan holders, preferably General contractors?

After logging into FBO.gov, there is a tab labeled Interested Vendors List. Contractors can see and be seen using this list.

5 Can WOSB contractors bid on this project as prime?

No, only SDVOSB can bid as prime.