QnA_10.10.19.pdf
PDF 400 KB Posted
- Attached to
- CO FLAP SUM 91(1), Fremont Pass Trail
- Solicitation number
- 6982AF19B000006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Tabulation.pdf | ||
| Bid_Opening_Summary_.pdf | ||
| QnA_10.18.19.pdf | ||
| A003_-_Plan_Sheet_B5.pdf | ||
| QnA_10.16.2019_.pdf | ||
| QnA_10.15.2019__.pdf | ||
| Amendment_002.pdf | ||
| QnA_10.7.19.pdf | ||
| QnA_10.4.19.pdf | ||
| QnA_10.3.19.pdf | ||
| Amendment_A001_.pdf | ||
| QnA_9.30.2019.pdf | ||
| QnA_09.23.19.pdf | ||
| SUM91-1-Final_Hydraulics.pdf | ||
| CO_FLAP_SUM_91(1)_Fremont_Trail_-_Final_Pavement_Tech_Memo.pdf | ||
| 6982AF19B000006.pdf | ||
| CO_FLAP_SUM91(1)_Plans_-_Final.pdf | ||
| CO_FLAP_SUM91(1)_XS_-_Final.pdf | ||
| Final_Geotechnical_Report.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for CO FLAP SUM 91(1) Fremont Pass Trail
October 10, 2019
Questions Answers 1 582.02(d) requires forged couplings.
Would welded couplings be acceptable?
No. Specification to remain as is.
2 582.03 requires that helical pile components shall be manufactured by an ISO 9001 compliant facility.
Is the ISO 9001 compliance necessary?
Yes. Specification to remain as is.
File details come from the government source that posted it.