QnA_10.18.19.pdf

PDF 113 KB Posted

Attached to
CO FLAP SUM 91(1), Fremont Pass Trail
Solicitation number
6982AF19B000006
Issued by

View the file

Other files

File Type Posted
Bid_Tabulation.pdf PDF
Bid_Opening_Summary_.pdf PDF
A003_-_Plan_Sheet_B5.pdf PDF
QnA_10.16.2019_.pdf PDF
QnA_10.15.2019__.pdf PDF
Amendment_002.pdf PDF
QnA_10.10.19.pdf PDF
QnA_10.7.19.pdf PDF
QnA_10.4.19.pdf PDF
QnA_10.3.19.pdf PDF
Amendment_A001_.pdf PDF
QnA_9.30.2019.pdf PDF
QnA_09.23.19.pdf PDF
SUM91-1-Final_Hydraulics.pdf PDF
CO_FLAP_SUM_91(1)_Fremont_Trail_-_Final_Pavement_Tech_Memo.pdf PDF
6982AF19B000006.pdf PDF
CO_FLAP_SUM91(1)_Plans_-_Final.pdf PDF
CO_FLAP_SUM91(1)_XS_-_Final.pdf PDF
Final_Geotechnical_Report.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for CO FLAP SUM 91(1) Fremont Pass Trail

October 18, 2019

Questions Answers 1 Please confirm that contractor is responsible for the cost of relocating the underground electric and fiber optic. If encountered during the installation of the precast box culvert, please also confirm that there are no other locations where the contractor will be responsible for relocating of any underground or overhead utilities.

The contractor will be responsible for coordinating with the utilities, uncovering the utilities and encasing the utilities in concrete, once the utility companies have placed the utilities in conduit at the specified box culvert location. There are on other locations where conflicts are expected. As always, it will be the contractor’s responsibility to confirm that no conflicts exist prior to digging. See SCR 107.02.

2 Please confirm that the contract is not required to have a designated Site Safety & Health Professional on site. If one is required, can the contractor’s superintendent fill the role along with his superintendent role

The contract does not require a designated Site Safety & Health professional on site.

3 Will the Q&A responses be incorporated into the project through an amendment, or do they carry full contract weight as provided

At times a question may warrant an amendment (i.e., plan revision, SCR revision), but the entire Q&A list will not be incorporated into an amendment.

4 Will there be any additional Amendments forthcoming? None planned at this time.

5 Will the bid date stay, or will the bid date be moved by a week? There is no intention of changing the bid date.