CO_FLAP_SUM91(1)_Plans_-_Final.pdf
PDF 27 MB Posted
- Attached to
- CO FLAP SUM 91(1), Fremont Pass Trail
- Solicitation number
- 6982AF19B000006
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Tabulation.pdf | ||
| Bid_Opening_Summary_.pdf | ||
| QnA_10.18.19.pdf | ||
| A003_-_Plan_Sheet_B5.pdf | ||
| QnA_10.16.2019_.pdf | ||
| QnA_10.15.2019__.pdf | ||
| Amendment_002.pdf | ||
| QnA_10.10.19.pdf | ||
| QnA_10.7.19.pdf | ||
| QnA_10.4.19.pdf | ||
| QnA_10.3.19.pdf | ||
| Amendment_A001_.pdf | ||
| QnA_9.30.2019.pdf | ||
| QnA_09.23.19.pdf | ||
| SUM91-1-Final_Hydraulics.pdf | ||
| CO_FLAP_SUM_91(1)_Fremont_Trail_-_Final_Pavement_Tech_Memo.pdf | ||
| 6982AF19B000006.pdf | ||
| CO_FLAP_SUM91(1)_XS_-_Final.pdf | ||
| Final_Geotechnical_Report.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
A2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
STATE PROJECT
P
M N C
O s u m R o a d w a y C
A D
D S h e e ts A G e n s h t\
S Y
M S
U M
.d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
A3
Fens
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts A G e n s h t\
S Y
M S
U M
.d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .k e e le
NUMBER
SHEET
CO
A4
SURVEY CONTROL
STATE PROJECT
P
M N C
O s u m R o a d w a y C
A D
D S h e e ts A G e n s h t\
C T
L S
U M
.d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts A G e n s h t\
S I T
E S
U M
.d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .k e e le
NUMBER
SHEET
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
SITE MAP
Scale in Feet
1000' 2000'
CO 91
FREMONT PASS TRAIL
Recreation Path
Ten Mile Canyon
Existing
19 Miles
To Leadville
FOREST
NATIONAL
RIVER
WHITE
A5
0 4
120+
+00
0+
Access Road
Climax Mine LIMAX MINEC
Copper Mountain Far East Parking Lot
Tenmile Creek
0+
Station 0+40.00
Begin Schedule A
Station 163+70.00
Begin Option X
End Schedule A
FOREST
NATIONAL
RIVER
WHITE
Colorado Trail
Maintain access to
MP 21
CO 91
MP 20
CO 91
MP 19
CO 91
Station 172+37.25
End Option X
Pedestrian boardwalk
Pedestrian bridge
See Sheet T23
Mitigation Area 2
See Sheet T22
Mitigation Area 1
See Sheet T24
14 Miles
To Offsite Mitigation Area
0.6 Miles
To I-70
Station 400+00.00
Begin Ramp to SH 91
Schedule A
Station 403+75.11
End Ramp to SH 91
Schedule A
9.5' 9.5'
Station to Station (ft)
Bridge
Hinge point
Cut slope
(variable) first asphalt lift)
(applied prior to
Prime coat asphalt lifts)
(applied between
Tack coat and seeding limits
Topsoil and seeding limits
Topsoil
SubgradeSubgrade
Traveled way Traveled way ditch
Graded Shldr.
NO SCALE
NOTE:
pavement)
(top of
Profile grade
Shldr.
1.
3.
2.
DETAIL A
See Detail A cut slope
Rounded
MAINLINE
TYPICAL SECTIONS
limit stake
Slope
30° - 35° sides of roadway)
(Detail applies to both right and left
Shoulder up with aggregate base
Construct 30° - 35° pavement edge (safety edge)
Clearing and construction limits
Asphalt concrete pavement
Placed in two lifts concrete pavement
3" Asphalt limit
Slope stake
Existing ground
6' 6'2'
1:2
4%
2'
4%
2'
1.8% 1.8%
B=5'F=5'
(ft)
Boardwalk
(ft)
Trail
A6
Station to Station
TOTAL (mi)
TOTALS (ft)
(ft)
Bridge
(ft)
Boardwalk
0.09
(ft)
Trail
LENGTH OF PROJECT - SCHEDULE A
LENGTH OF PROJECT - OPTION X
0.05
TOTAL (mi)
TOTALS (ft)
9.5' 9.5'
Hinge point
Cut slope
(variable) first asphalt lift)
(applied prior to
Prime coat asphalt lifts)
(applied between
Tack coat and seeding limits
Topsoil and seeding limits
Topsoil
SubgradeSubgrade
Traveled way Traveled way ditch
Graded Shldr.
pavement)
(top of
Profile grade
Shldr.
1.
3.
2.
See Detail A cut slope
Rounded limit stake
Slope
Clearing and construction limits
Placed in two lifts concrete pavement
3" Asphalt limit
Slope stake
Existing ground
6' 6'2'
1:2
4% 1:2
2'
4%
2'
1.8% 1.8%
B=5'F=5'
4.
4" Roadway aggregate
4" Roadway aggregate
5. 5.
5.
4.
3.
2.
1.
first asphalt lift)
(applied prior to
Prime coat asphalt lifts)
(applied between
Tack coat
Traveled way Traveled way pavement)
(top of
Profile grade
Placed in two lifts concrete pavement
3" Asphalt
3' 3'
1:2 1:2
1.8% 1.8%
4" Roadway aggregate
171+80 to 172+37.25
TYPICAL SECTION
7" Roadway aggregate of length.
Reduce shoulder width to 1' when shown in the plans. Taper the width over 20' shoulder width to 4'. See the cross sections for details.
Only pave 3' traveled way on either side of centerline for ramp to CO 91. Increase reduce the B and F dimensions to the actual cut height.
Round all earth slopes and all rippable rock slopes. For cut heights less than B, See the cross sections for cut and fill slope ratios.
slope ratios may be adjusted by the CO to assure adequate drainage and stability.
The gradient and width of roadway ditches and the excavation and embankment
400+00 to 403+75.11
47+66 to 163+79.8
0+40 to 43+06
TYPICAL SECTION
400+00 to 403+75.11
47+66 to 163+70
43+06 to 47+66
0+40 to 43+06
166+39.8 to 172+37.25
163+79.8 to 166+39.8
163+70 to 163+79.8
3.08
16245.11
375.11
11605
0.12
607.25
597.45
9.8
166+39.8 to 171+80
TYPICAL SECTION
1:2 (typ)
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P S
U M
.d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .k e e le
NUMBER
SHEET
CO
Sheet and Description
B5 B6 B7 - B9 S2 S14
Grading Summary
Drainage Summary
Miscellaneous Summary
Pedestrian Boardwalk
CO 91
Pedestrian Overpass
Allowance Bid Schedule
A0050 15101-0000 MOBILIZATION LPSM ALL
A0100 15214-1000 SURVEY AND STAKING, BRIDGE LPSM All ALL
A0150 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 17 17
A0200 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL MILE 3.077 3.077
A0250 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 6.153 6.153
A0300 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0350 15401-0000 CONTRACTOR TESTING LPSM ALL
A0400 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0450 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 18,913 387 19,300
A0500 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 154 6 160
A0550 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT EACH 3 3
A0600 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0650 20101-0000 CLEARING AND GRUBBING ACRE 10.1 0.4 10.5
A0700 20420-0000 EMBANKMENT CONSTRUCTION CUYD 16,515 785 17,300
A0750 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 32 3 35
A0800 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 31 2 33
A0850 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 CUYD 236 9 245
A0900 25201-0000 SPECIAL ROCK EMBANKMENT CUYD 1,333 67 1,400
A0950 25210-0000 ROCKERY SQFT 2,185 115 2,300
A1000 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 7,919 381 8,300
A1050 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 3,748 102 3,850
A1100 41102-1000 PRIME COAT, METHOD 1 SQYD 22,947 553 23,500
A1150 41105-0000 BLOTTER TON 33
A1200 41201-0000 TACK COAT TON 9.8 0.2 10.0
A1250 55601-1300 BRIDGE RAILING, TIMBER LNFT 922 922 Contract Quantity
A1300 55701-2000 STRUCTURAL TIMBER AND LUMBER, TREATED MFBM 18 18 Contract Quantity
A1350 55706-2000 STRUCTURAL TIMBER AND LUMBER, TREATED (PEDESTRIAN RAILING) LPSM All ALL
A1400 58202-0000 HELICAL PILE, IN PLACE EACH 94 94
A1450 58405-1000 FIBERGLASS REINFORCED PLASTIC, GRATING (1 1/2" DEEP PANELS) SQFT 5,520 5,520 Contract Quantity
A1500 60103-0000 CONCRETE, HEADWALL (8 FT x 4 FT BOX) EACH 2 2
A1550 60103-1960 CONCRETE, HEADWALL FOR 36-INCH EQUIVALENT DIAMETER PIPE CULVERT EACH 1 1
A1600 60103-1980 CONCRETE, HEADWALL FOR 42-INCH EQUIVALENT DIAMETER PIPE CULVERT EACH 1 1
A1650 60103-2000 CONCRETE, HEADWALL FOR 48-INCH EQUIVALENT DIAMETER PIPE CULVERT EACH 1 1
A1700 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT LNFT 239 11 250
A1750 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT LNFT 47 3 50
A1800 60202-0700 42-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT LNFT 78 7 85
A1850 60202-0800 48-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT LNFT 50 5 55
A1900 60211-0800 END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT EACH 18 18
MileStone: 100% Date Completed: In Progress Report Date: 03/12/19
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-M ar
-2
1:
P
M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated Quantities
N
C O
\s um
(1
R oa dw ay
\C
AD
D _S he et s\ B -S um m
\S pr ea ds he et s\ [s um m ar y.
xl sm
]S he et
STATE PROJECT
B1CO FLAP SUM91(1)
FREMONT PASS TRAILCO
SHEET
NUMBER
Grading Summary
Drainage Summary
Miscellaneous Summary
Pedestrian Boardwalk
CO 91
Pedestrian Overpass
Allowance Bid Schedule
A1950 60211-1000 END SECTION FOR 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT EACH 3 3
A2000 60211-1100 END SECTION FOR 42-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT EACH 5 5
A2050 60211-1200 END SECTION FOR 48-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT EACH 3 3
A2100 60220-1800 8 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT LNFT 26 26
A2150 60520-0000 GRANULAR BACKFILL (ROCK DRAIN) CUYD 3,067 133 3,200
A2200 61901-0000 FENCE LNFT 69 69
A2250 61904-0000 BOLLARD POST EACH 2 2
A2300 61920-2000 REMOVE AND RESET GATE EACH 2 2
A2350 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 100
A2400 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH HOUR 100
A2450 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 100
A2500 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 16
A2550 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 100
A2600 62301-0000 GENERAL LABOR HOUR 40
A2650 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 24
A2700 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (BIOLOGICAL SURVEYS) LPSM ALL
A2750 62406-0400 PLACING CONSERVED TOPSOIL, 6-INCH DEPTH ACRE 2.0 2.0
A2800 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 2.0 2.0
A2850 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 2.0 2.0
A2900 62520-0000 FERTILIZER ACRE 2.0 2.0
A2950 62901-0300 ROLLED EROSION CONTROL PRODUCT, TYPE 1.C SQYD 765 35 800
A3000 63301-0000 SIGN SYSTEM EACH 11 11
A3050 63309-0900 DELINEATOR, TYPE FLEXIBLE EACH 7 7
A3100 63401-0900 PAVEMENT MARKINGS, TYPE E, SOLID LNFT 68 68
A3150 63403-1300 PAVEMENT MARKINGS, TYPE BIKE LANE SURFACE SQFT 640 640
A3200 63405-0050 PAVEMENT MARKINGS, SYMBOLS EACH 1 1
A3250 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A3300 63701-0000 FIELD OFFICE EACH 1
A3350 64701-1000 MITIGATION, WETLANDS MITIGATION LPSM ALL
A3400 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 16 16
-M ar -2
1:
P M
MileStone: 100% Date Completed: In Progress Report Date: 03/12/19
N
C O
\s um
(1
R oa dw ay
\C
AD
D _S he et s\ B -S um m
\S pr ea ds he et s\ [s um m ar y.
xl sm
]S he et
2) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B2CO FLAP SUM91(1)
FREMONT PASS TRAILCO
Grading Summary
Drainage Summary
Miscellaneous Summary
Pedestrian Boardwalk
CO 91
Pedestrian Overpass
Allowance Bid Schedule
X0050 15101-0000 MOBILIZATION LPSM ALL
X0100 15214-1000 SURVEY AND STAKING, BRIDGE LPSM All ALL
X0150 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 1 1
X0200 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL MILE 0.115 0.115
X0250 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 0.230 0.230
X0300 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0350 15401-0000 CONTRACTOR TESTING LPSM ALL
X0400 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0450 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 532 18 550
X0500 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 6 6
X0550 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT EACH 1 1
X0600 20101-0000 CLEARING AND GRUBBING ACRE 0.4 0.4
X0650 20302-1300 REMOVAL OF GUARDRAIL, CONCRETE BARRIER LNFT 10 50
X0700 20420-0000 EMBANKMENT CONSTRUCTION CUYD 845 55 900
X0750 20801-0000 STRUCTURE EXCAVATION CUYD 130 130 Contract Quantity
X0800 20803-0000 STRUCTURAL BACKFILL CUYD 90 90 Contract Quantity
X0850 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 4 4
X0900 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 393 7 400
X0950 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 187 13 200
X1000 41102-1000 PRIME COAT, METHOD 1 SQYD 1,144 56 1,200
X1050 41105-0000 BLOTTER TON 2
X1100 41201-0000 TACK COAT TON 0.5 0.5
X1150 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 129 129 Contract Quantity
X1200 55231-0000 CONCRETE COLOR AGENT LB 1,420 1,420
X1250 55235-0000 EXPANSION JOINTS LNFT 36 36 Contract Quantity
X1300 55401-1000 REINFORCING STEEL LB 7,000 7,000 Contract Quantity
X1350 55401-2000 REINFORCING STEEL, EPOXY COATED LB 4,200 4,200 Contract Quantity
X1400 55504-0000 PRE-FABRICATED STEEL BRIDGE (TWO SPAN MODULAR STEEL PEDESTRIAN
BRIDGE) LPSM All ALL
X1450 55706-2000 STRUCTURAL TIMBER AND LUMBER, TREATED (PEDESTRIAN RAILING) LPSM All ALL
X1500 56501-0600 DRILLED SHAFT, 48-INCH DIAMETER LNFT 63 63
X1550 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT LNFT 36 4 40
X1600 60211-0800 END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT EACH 2 2
X1650 61301-0000 SIMULATED STONE MASONRY SURFACE TREATMENT SQYD 78 78
X1700 61904-0000 BOLLARD POST EACH 3 3
X1750 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 8
X1800 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH HOUR 8
X1850 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 8
-M ar -2
1:
P M
MileStone: 100% Date Completed: In Progress Report Date: 03/12/19
N
C O
\s um
(1
R oa dw ay
\C
AD
D _S he et s\ B -S um m
\S pr ea ds he et s\ [s um m ar y.
xl sm
]S he et
3) SUMMARY OF QUANTITIES - Schedule X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B3CO FLAP SUM91(1)
FREMONT PASS TRAILCO
Grading Summary
Drainage Summary
Miscellaneous Summary
Pedestrian Boardwalk
CO 91
Pedestrian Overpass
Allowance Bid Schedule
X1900 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 8
X1950 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 8
X2000 62301-0000 GENERAL LABOR HOUR 16
X2050 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 16
X2100 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (BIOLOGICAL SURVEYS) LPSM ALL
X2150 62406-0400 PLACING CONSERVED TOPSOIL, 6-INCH DEPTH ACRE 0.1 0.1
X2200 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 0.1 0.1
X2250 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 0.1 0.1
X2300 62520-0000 FERTILIZER ACRE 0.1 0.1
X2350 62901-0300 ROLLED EROSION CONTROL PRODUCT, TYPE 1.C SQYD 187 13 200
X2400 63301-0000 SIGN SYSTEM EACH 4 1 5
X2450 63401-0900 PAVEMENT MARKINGS, TYPE E, SOLID LNFT 252 252
X2500 63403-1300 PAVEMENT MARKINGS, TYPE BIKE LANE SURFACE SQFT 240 240
X2550 63405-0050 PAVEMENT MARKINGS, SYMBOLS EACH 2 2
X2600 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
-M ar -2
1:
P M
MileStone: 100% Date Completed: In Progress Report Date: 03/12/19
N
C O
\s um
(1
R oa dw ay
\C
AD
D _S he et s\ B -S um m
\S pr ea ds he et s\ [s um m ar y.
xl sm
]S he et
4) SUMMARY OF QUANTITIES - Schedule X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B4CO FLAP SUM91(1)
FREMONT PASS TRAILCO
GRADING SUMMARY
B5
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts B S u m m Q u a n ti ti e s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .k e e le
NUMBER
SHEET
CO
DRAINAGE SUMMARY
B6
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts B S u m m Q u a n ti ti e s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .k e e le
NUMBER
SHEET
CO
MISCELLANEOUS SUMMARIES
B7
Sheet 1 of 3
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts B S u m m Q u a n ti ti e s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .k e e le
NUMBER
SHEET
CO
Sheet 2 of 3
MISCELLANEOUS SUMMARIES
B8
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts B S u m m Q u a n ti ti e s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .k e e le
NUMBER
SHEET
CO
B9
Sheet 3 of 3
MISCELLANEOUS SUMMARIES
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts B S u m m Q u a n ti ti e s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .k e e le
NUMBER
SHEET
CO
BH-01
P O
T
.0
P C
.7
P R
C
.9
P T
.3
P C
.6
P R
C
.4
P T
.6
P C
.7
P T
.4
P C
.0
P R
C
.1
P T
.2
P C
.3
P T
.3
P C
.4
P T
.5
0 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00
C1
0%
6.0%
-6.0%
6.0%
0%
-6.0%
LT EOP
RT EOP
Profile grade and axis of rotation
Profile grade
Existing ground
Curve = TRAIL-1
PI 0+35.66
D
R = 60.00'
T = 24.91'
L = 47.23'
Curve = TRAIL-2
PI 0+78.94
D
R = 60.00'
T = 20.97'
L = 40.35'
Curve = TRAIL-3
PI 1+90.78
D
R = 700.00'
T = 74.16'
L = 147.77'
Curve = TRAIL-4
PI 3+27.05
D
R = 1,400.00'
T = 62.66'
L = 125.23'
Curve = TRAIL-5
PI 5+68.71
D
R = 1,400.00'
T = 78.92'
L = 157.68'
Curve = TRAIL-6
PI 7+08.58
D
R = 300.00'
T = 11.57'
L = 23.12'
Curve = TRAIL-7
PI 7+77.28
D
R = 1,000.00'
T = 57.14'
L = 114.15'
Curve = TRAIL-8
PI 10+49.68
D
R = 902.26'
T = 89.29'
L = 178.00'
Curve = TRAIL-9
PI 13+60.03
D
R = 5,000.00'
T = 124.55'
L = 249.04'
Station 0+40.00
Begin Project
Schedule A condition after construction.
Restore slopes to original truck turn around.
Potential construction
R = 44'
V P I
E L
,7
.4
+5.3 73%
+4.60 0%
,7
.3
V P I
E L
,7
.8
60' VC
K = 15
SSD = 293'
V P I
E L
,7
.4
+0.500% +1.700%
100' VC
K = 83
V P I
E L
,7
.2
3+1.700%
+4.80 0%
115' VC
K = 37
V P I
E L
,7
.4
+4.80 0%
+0.500%
100' VC
K = 23
SSD = 301'
V P I
E L
,7
.3
+0.500% +2.000%
100' VC
K = 67
-2.91%
0.91% 1.80%
-1.80%
1.80%
-1.80% -1.80%
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .k e e le
NUMBER
SHEET
Superelevation Diagram
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
Rock drain Rock drain
W O
O D
Install 14 LNFT of fence
A F
R A
M E W
O O
D
Install 27 LNFT of fence
Remove existing fence
Remove and reset gate
P I P
E
G A
S M
A R
K E
R
C O T
R A I L
R E P L
M
C O
N C 3
X
X
W O
O D
WOOD
S
TE
EL
W O
O D
S T
E E
L
G A
S M
A R
K E
R
1FT WIDE
G A
S M
A R
K E
R
1FT W
IDE 9
G A
S M
A R
K E
R
6" Hig h Pres sure G as Exc el
200'100'0
Scale in Feet
E 2820670.95
N 1606674.10
R ip r a p c la s s
R t.
E n d s e c ti o n
L t.
a n d R t.
I n s ta ll x x
C M
P
R ip r a p c la s s
R t.
E d s e c ti o n
R t.
H e a d w a ll
L t.
I n s ta ll x x
C M
Ten Mile Creek
14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00
C2
0%
6.0%
-6.0% -6.0%
0%
6.0%
LT EOP
RT EOP
Profile grade and axis of rotation
Profile grade
Existing ground
Curve = TRAIL-10
PI 18+62.17
D
R = 1,000.00'
T = 26.66'
L = 53.30'
Curve = TRAIL-11
PI 19+51.42
D
R = 1,000.00'
T = 27.22'
L = 54.43'
Curve = TRAIL-12
PI 21+91.68
D
R = 2,000.00'
T = 88.84'
L = 177.56'
Curve = TRAIL-13
PI 25+36.83
D
R = 700.00'
T = 183.03'
L = 358.04'
Curve = TRAIL-14
PI 27+89.74
D
R = 700.00'
T = 37.74'
L = 75.40'
BH-02
PH-01
P T
.5
P C
.5
P T
.8
P C
.2
P T
.6
P C
.8
P T
.4
P C
.8
P T
.8
P C
.0
P T
.4
P C
.9
P R
C
.6
V P I
E L
,7
.3
2+2.000% +3.100
100' VC
K = 91
V P I
E L
,7
.4
+3.100
+2.700%
100' VC
K = 250
SSD = 2747'
V P I
E L
,8
.9
9+2.700%
+5.00 0%
100' VC
K = 43
V P I
E L
,8
.6
+5.00 0%
+0.900%
100' VC
K = 24
SSD = 313'
V P I
E L
,8
.9
+0.900%
V P I
E L
,8
.9
+0.900%
152' VC
K = 37
1.80%
-1.80%
1.80%
-1.80% -1.80%
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .k e e le
NUMBER
SHEET
Superelevation Diagram
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
Rock drain
5 G
A S M
A R
K E
R
G A
S M
A R
K E
R
W
IR
E H
T
.5
F T
G A
S
G A
S M
A R
K E
R
6" H igh Pr es su re
Ga s E xc el
200'100'0
Scale in Feet
28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00
C3
0%
6.0%
-6.0%
6.0%
0%
-6.0%
200'100'0
Scale in Feet
LT EOP
RT EOP
Profile grade and axis of rotation
Profile grade
Existing ground
Curve = TRAIL-15
PI 29+48.85
D
R = 200.00'
T = 12.88'
L = 25.72'
Curve = TRAIL-16
PI 30+34.90
D
R = 1,100.00'
T = 73.21'
L = 146.20'
Curve = TRAIL-17
PI 33+30.68
D
R = 500.00'
T = 21.48'
L = 42.94'
Curve = TRAIL-18
PI 34+77.63
D
R = 800.00'
T = 70.29'
L = 140.22'
Curve = TRAIL-19
PI 35+65.45
D
R = 300.00'
T = 17.89'
L = 35.73'
Curve = TRAIL-20
PI 36+35.13
D
R = 300.00'
T = 16.04'
L = 32.06'
Curve = TRAIL-21
PI 38+82.21
D
R = 400.00'
T = 41.07'
L = 81.85' after construction.
Match existing grading truck turn around.
Potential construction
50' x 10' with 20' long taper and Rt. for utility access
Construct aggregate widening Lt. (7" depth)
Area 1
See Wetland Mitigation Plans
BH-03
P T
.8
P C
.0
P T
.4
P C
.9
P R
C
.6
P T
.8
P C
.2
P T
.1
P C
.3
P R
C
.5
P T
.3
P C
.0
P T
.1
P C
.1
P T
.9
P C
.1
P R
C
.9
P T
.4
V P I
E L
,8
.9
+2.800%
V P I
E L
,8
.1
5+2.800%
+4.30 0%
100' VC
K = 67
V P I
E L
,8
.7
+4.30 0%
+3.200
100' VC
K = 91
SSD = 1031'
V P I
E L
,8
.9
8+3.200
+4.10 0%
V P I
E L
,8
.9
+5.00 0%
152' VC
K = 37
V P I
E L
,8
.8
+5.00 0%
+2.800%
100' VC
K = 45
SSD = 540'
V P I
E L
,8
.1
5+2.800%
+4.30 0%
100' VC
K = 67
1.80%
-1.80%
1.80%
-1.80% -1.80%
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .k e e le
NUMBER
SHEET
Superelevation Diagram
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
Rock drainReduce shoulders to 1', Lt. and Rt.
Shoulder Stabilization, Rt.
G A S M
A R
K E
R
G A S M
A R
K E
R
G A S
0 9855
G A S M
A R
K E
R
G A S
6" Hig h Pres sure G as Exc el
R ip r a p c la s s
R t.
E n d s e c ti o n
L t.
a n d R t.
I n s ta ll x x
C M
P
R ip r a p c la s s d s e c ti o n
R t.
H e a d w a ll
L t.
I n s ta ll x x
C M
P
Ten Mile Creek through for construction access.
Do not disturb fens or cross
42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00
C4
0%
6.0%
-6.0% -6.0%
0%
6.0%
200'100'0
Scale in Feet
LT EOP
RT EOP
Profile grade and axis of rotation
Profile grade
Existing ground after construction.
Match existing grading truck turn around.
Potential construction
Curve = TRAIL-22
PI 42+03.62
D
R = 170.00'
T = 37.52'
L = 73.86'
Curve = TRAIL-23
PI 42+66.90
D
R = 170.00'
T = 26.94'
L = 53.44'
Curve = TRAIL-24
PI 47+94.85
D
R = 170.00'
T = 13.87'
L = 27.67'
Curve = TRAIL-26
PI 49+50.78
D
R = 500.00'
T = 22.15'
L = 44.27'L = 29.17'
Curve = TRAIL-25
PI 48+23.28
D
R = 170.00'
T = 14.62'
Curve = TRAIL-27
PI 51+13.74
D
R = 900.00'
T = 73.75'
L = 147.17'
Curve = TRAIL-28
PI 52+42.09
D
R = 1,400.00'
T = 42.25'
L = 84.48'
Curve = TRAIL-29
PI 55+30.13
D
R = 3,000.00'
T = 87.97'
L = 175.89'
50' x 13' with 15' tapers for utility access
Construct aggregate widening Lt. (7" depth) through for construction access.
Do not disturb fens or cross
Area 1
See Wetland Mitigation Plans
BH-03
BH-04
P C
.1
P R
C
.9
P T
.4
P C
.9
P R
C
.6
P T
.8
P C
.6
P T
.9
P C
.9
P T
.1
P C
.8
P T
.3
P C
.1
P T
.0
V P I
E L
,8
.9
+4.10 0%
V P I
E L
,9
.5
+4.10 0%
+3.300
V P I
E L
,9
.5
+3.300
+4.10 0%
100' VC
K = 125
VPI 55+77
EL 9,931.49
+4.10 0%
+2.200%
100' VC
K = 53
SSD = 618'
1.80%
-1.80%
1.80%
-1.80% -1.80%
0.00%
-1.80%
1.80%
47+66 47+80
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .k e e le
NUMBER
SHEET
Superelevation Diagram
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
Rock drain
BoardwalkRockery, Rt. Rockery, Rt.
L O
G R
A
IL
G A
S
E N
D W
E T A
R E
A
B E
G I N W
E T A
R E
A
X
X
L O
G R
A I L
G A
S M
A R
K E
R
B E
G I N W
E T A
R E
A
U G T
E L E C
A B
L E
9930 G A
S M
A R
K
56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00
C5
0%
6.0%
-6.0%
6.0%
0%
-6.0%
200'100'0
Scale in Feet
LT EOP
RT EOP
Profile grade and axis of rotation
Profile grade
Existing ground after construction.
Match existing grading truck turn around.
Potential construction
R = 6,000.00'
Curve = TRAIL-30
PI 59+48.00
D
T = 250.04'
L = 499.80'
Curve = TRAIL-31
PI 62+91.31
D
R = 300.00'
T = 26.07'
L = 52.02'
Curve = TRAIL-32
PI 63+49.86
D
R = 400.00'
T = 32.61'
L = 65.07'
T = 10.21'
Curve = TRAIL-33
PI 64+38.90
D
R = 300.00'
L = 20.41'
Curve = TRAIL-34
PI 65+32.04
D
R = 300.00'
T = 15.53'
L = 31.04'
T = 13.65'
Curve = TRAIL-35
PI 66+01.15
D
R = 300.00'
L = 27.28'
Curve = TRAIL-36
PI 69+14.14
D
R = 500.00'
T = 33.76'
L = 67.42'
BH-05
P T
.0
P C
.9
P T
.7
P C
.2
P R
C
.2
P T
.3
P C
.6
P T
.1
P C
.5
P T
.5
P C
.5
P T
.7
P C
.3
P T
.8
P C
.0
+2.200%
100' VC
K = 53
SSD = 618'
V P I
E L
,9
.5
3+2.200% +2.800%
100' VC
K = 167
V P I
E L
,9
.5
8+2.800%
+4.90 0%
100' VC
K = 48
VPI 66+85
EL 9,974.78
+4.90 0%
+1.500%
388' VC
K = 114
SSD = 511'
VPI 69+50
EL 9,978.75
+1.500% -0.500%
100' VC
K = 50
SSD = 590'
-0.500%
1.80%
-1.80%
1.80%
-1.80% -1.80%
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .k e e le
NUMBER
SHEET
Superelevation Diagram
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
Rock drain Rock drain
Reduce shoulders to 1', Lt. and Rt.
Shoulder Stabilization, Rt.
G A
S M
A R
K E
R
G A
S M
A R
K E
R
9960 9965
W O
O D
X
C e n tu r y L in k F ib e r o p ti c
G A
S V
A L
V E
G A
S M
A R
K E
R
70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 84+00
10000
10010
10020
10000
10010
10020
C6
0%
6.0%
-6.0%
6.0%
0%
-6.0%
200'100'0
Scale in Feet
LT EOP
RT EOP
Profile grade and axis of rotation
Profile grade
Existing ground after construction.
Match existing grading truck turn around.
Potential construction
See Wetland Mitigation Plans
Curve = TRAIL-37
PI 71+02.39
D
R = 220.00'
T = 30.36'
L = 60.33'
Curve = TRAIL-38
PI 72+72.75
D
R = 400.00'
T = 80.11'
L = 158.13'
Curve = TRAIL-39
PI 75+56.46
D
R = 400.00'
T = 25.61'
L = 51.14'
R = 500.00'
Curve = TRAIL-40
PI 77+51.62
D
T = 26.80'
L = 53.54'
Curve = TRAIL-41
PI 80+42.04
D
R = 500.00'
T = 123.87'
L = 242.86'
Curve = TRAIL-42
PI 83+31.67
D
R = 200.00'
T = 40.36'
L = 79.66'
Curve = TRAIL-43
PI 83+95.87
D
R = 200.00'
T = 24.90'
L = 49.55'
BH-06
PH-02
P T
.8
P C
.0
P T
.3
P C
.6
P T
.7
P C
.8
P T
.0
P C
.8
P T
.3
P C
.1
P T
.0
P C
.3
P R
C
.9
P T
.5
P C
.7
-0.500%
SSD = 590'
VPI 70+97
EL 9,978.01
-0.500% +2.600%
163' VC
K = 53
V P I
E L
,9
.9
+2.600% +1.300%
100' VC
K = 77
SSD = 880'
V P I
E L
,9
.3
7+1.300% +4.60
0%
122' VC
K = 37
V P I
E L
,9
.9
+4.60 0%
+3.69 0%
100' VC
K = 110
SSD = 1236'
1.80%
-1.80%
1.80%
-1.80% -1.80%
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .k e e le
NUMBER
SHEET
Superelevation Diagram
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
Rock drain
Reduce shoulders to 1', Lt. and Rt.
Reduce shoulders to 1', Lt. and Rt.
Reduce shoulders to 1', Lt. and Rt.
Stabilization, Rt.
Shoulder
Stabilization, Rt.
Shoulder
Shoulder Stabilization, Rt. Shoulder Stabilization, Rt.
C e n tu r y L in k F ib e r o p ti c
99759975
B E
G I N W
E T A
R E
A
U
U
U
U
O L
D L
O G C
A B I N
G A
S M
A R
K E
R
U
U
U
U
U
10000
10000
D I R O
N L
Y
U
W O
O D
X
G A
S V
A L
V E
D I R O
N L
Y
10005
10005
10005
D I R O
N L
Y
G A
S M
A R
K E
R
U
U
U
U
U
1001010010
10010
10015
U
U
U
G A
S M
A R
K E
R
U
U
U
6" H ig h
Pr es su re G as E xc el
R ip r a p c la s s
R t.
E n d s e c ti o n
L t.
a n d R t.
I n s ta ll x x
C M
P
R ip r a p c la s s
R t.
E n d s e c ti o n
L t.
a n d R t.
I n s ta ll x x
C M
P
R ip r a p c la s s d s e c ti o n
H e a d w a ll
L t.
I n s ta ll x x
C M
84+00 85+00 86+00 87+00 88+00 89+00 90+00 91+00 92+00 93+00 94+00 95+00 96+00 97+00 98+00
10010
10020
10030
10040
10050
10060
10010
10020
10030
10040
10050
10060
C7
0%
6.0%
-6.0%
6.0%
0%
-6.0%
200'100'0
Scale in Feet
LT EOP
RT EOP
Profile grade and axis of rotation
Profile grade
Existing ground after construction.
Match existing grading truck turn around.
Potential construction
Reduce shoulders to 1', Lt. and Rt.
PI 85+75.02
Curve = TRAIL-44
D
R = 1,200.00'
T = 46.29'
L = 92.54'
Curve = TRAIL-45
PI 89+44.41
D
R = 480.00'
T = 270.16'
L = 492.14'
Curve = TRAIL-46
PI 94+68.28
D
R = 3,600.00'
T = 99.36'
L = 198.68'
Curve = TRAIL-47
PI 96+18.44
D
R = 300.00'
T = 11.65'
L = 23.30'
R = 200.00'
Curve = TRAIL-48
PI 96+76.66
D
T = 13.41'
L = 26.79'
Curve = TRAIL-49
PI 97+50.66
D
R = 200.00'
T = 15.72'
L = 31.37'
BH-07
PH-02
PR
C .9
P T
.5
P C
.7
3 P T
.2
P C
.2
P T
.3
P C
.9
P T
.5
P C
.7
P T
.0
P C
.2
P T
.0
P C
.9
P R
C
.3
P T
.4
V P I
E L
,0
.9
+3.69 0%
+0.500%
100' VC
K = 31
SSD = 388'
V P I
E L
,0
.0
+0.500% +1.000%
100' VC
K = 200
V P I
E L
,0
.6
+1.000% +4.10
0%
115' VC
K = 37
+4.10 0%
1.80%
-1.80%
1.80%
-1.80% -1.80%
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .k e e le
NUMBER
SHEET
Superelevation Diagram
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
Rock drain
Reduce shoulders to 1', Lt. and Rt. Reduce shoulders to 1', Lt. and Rt.
Shoulder Stabilization, Rt.
Stabilization, Rt.
Shoulder
Shoulder Stabilization, Rt.
U
U
U
G A
S M
A R
K E
R
C e n tu r y L in k F ib e r o p ti c
U
U
U
10025
10025
U
B E
G I N W
E T A
R E
A
E N
D W
E T A
R E
A
E N
D W
E T A
R E
A
E N
D W
E T A
R E
A
U
E N
D W
E T A
R E
A
B E
G I N W
E T A
R E
A
B E
G I N W
E T A
R E
A
U
U
G A
S M
A R
K E
R
B E
G I N W
E T A
R E
A
E N
D W
E T A
R E
A
G A
S
W O
O D
X
G A
S M
A R
K E
R
1003010
10030
10030
10030
10030
B E
G I N W
E T A
R E
A
U
U
E N
D W
E T A
R E
A
B E
G I N W
E T A
R E
A
U
U
U
S P
R I N
G
E N
D W
E T A
R E
A
U
U
10040
U
U
10045
10045
G A
S M
A R
K E
R
10050
10050
U
U
U
U
U
U
10055
10055
6" H ig h
Pr es su re G as E xc el
R ip r a p c la s s
R t.
E n d s e c ti o n
L t.
a n d R t.
I n s ta ll x x
C M
P
R ip r a p c la s s
R t.
E n d s e c ti o n
L t.
a n d R t.
I n s ta ll x x
C M
98+00 99+00 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00
10050
10060
10070
10080
10090
10100
10050
10060
10070
10080
10090
10100
C8
200'100'0
Scale in Feet
0%
6.0%
-6.0%
6.0%
0%
-6.0%
LT EOP
RT EOP
Profile grade and axis of rotation
Profile grade
Existing ground after construction.
Match existing grading truck turn around.
Potential construction
Curve = TRAIL-50
PI 98+22.04
D
R = 600.00'
T = 55.72'
L = 111.12'
Curve = TRAIL-51
PI 100+64.74
D
R = 200.00'
T = 39.58'
L = 78.15'
Curve = TRAIL-52
PI 101+30.29
D
R = 200.00'
T = 26.98'
L = 53.63'
T = 22.72'
Curve = TRAIL-53
PI 102+55.82
D
R = 500.00'
L = 45.42' L = 300.48'
Curve = TRAIL-54
PI 104+78.19
D
R = 5,000.00'
T = 150.29'
Curve = TRAIL-55
PI 107+69.44
D
R = 381.71'
T = 83.39'
L = 164.20'
D
Curve = TRAIL-56
PI 110+48.80
R = 900.00'
T = 62.49'
L = 124.78'
20' x 8' with 10' tapers for rest area, Rt.
Construct aggregate widening (7" depth)
PH-
P C
.9
P R
C
.3
P T
.4
P C
.1
P R
C
.3
P T
.9
P C
.1
P T
.5
P C
.9
P T
.3
P C
.0
P T
.2
P C
.3
P T
.0
P C
.3
P T
.9
V P I
E L
,0
.9
+4.10 0%
+3.500
100' VC
K = 167
SSD = 1848'
V P I
E L
,0
.0
+3.500
+4.70 0%
198' VC
K = 165
V P I
E L
,0
.7
+4.70 0%
+1.000%
300' VC
K = 81
SSD = 442'
V P I
E L
,0
.7
+1.000%
+5.4 00%
163' VC
K = 37
VPI 111+54
EL 10,103.47
+5.4 00%
+3.000
100' VC
K = 42
SSD = 500'
1.80%
-1.80%
1.80%
-1.80% -1.80%
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .k e e le
NUMBER
SHEET
Superelevation Diagram
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
Rock drain
Rock drain
Reduce shoulders to 1', Lt. and Rt.
Shoulder Stabilization, Rt.
Shoulder Stabilization, Rt.
10050
U
U
U
U
U
U
10055
10055
U
10060
10060
10060
W E
T A
R E
A
U
U
10065
W E
T A
R E
A
10070
U 4G
A S M
A R
K E
R
10075
U
C e n tu ry L in k F ib e ro p ti c
10080
G A S
U
U 2 U
U
U
U
U
10085
10085
10085
10085
10085
U
U
U
G A S M
A R
K E
R
10090
U
10095 U
U
U
U
R ip r a p c la s s
R t.
E n d s e c ti o n
L t.
a n d R t.
I n s ta ll x x
C M
P
R ip r a p c la s s
R t.
E n d s e c ti o n
L t.
a n d R t.
I n s ta ll x x
C M
112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00 126+00
10100
10110
10120
10130
10140
10150
10100
10110
10120
10130
10140
10150
C9
200'100'0
Scale in Feet
0%
6.0%
-6.0%
6.0%
0%
-6.0%
LT EOP
RT EOP
Profile grade and axis of rotation
Profile grade
Existing ground after construction.
Match existing grading truck turn around.
Potential construction
Curve = TRAIL-57
PI 112+51.64
D
R = 180.00'
T = 12.33'
L = 24.63'
T = 12.11'
Curve = TRAIL-58
PI 113+57.96
D
R = 400.00'
L = 24.21'
Curve = TRAIL-59
PI 116+02.24
D
R = 260.00'
T = 97.16'
L = 185.97'
Curve = TRAIL-60
PI 118+33.36
D
R = 200.00'
T = 19.73'
L = 39.33'
T = 43.23'
Curve = TRAIL-61
PI 119+35.95
D
R = 500.00'
L = 86.24'
Curve = TRAIL-62
PI 121+68.86
D
R = 430.62'
T = 148.56'
L = 286.11'
T = 16.87'
Curve = TRAIL-63
PI 124+18.15
D
R = 400.00'
L = 33.73'
T = 21.30'
Curve = TRAIL-64
PI 124+87.79
D
R = 400.00'
L = 42.56'
B H -0
P T
.0
P C
.3
P T
.9
P C
.8
P T
.0
P C
.0
P T
.0
P C
.6
P T
.9
P C
.7
P T
.9
P C
.3
P T
.4
P C
.2
P T
.0
P C
.4
P T
.0
P C
.1
P R
C
.6
P T
.3
P C
.2
P
T
.1
+3.000
SSD = 500' V
P I
E L
,1
.8
+3.000
+8.0
185' VC
K = 37
V P I
E L
,1
.1
+8.0
+1.500%
123' VC
K = 19
SSD = 228'
V
P I
E L
,1
.6
3+1.500%
+5.00 0%
130' VC
K = 37
V P I
E L
,1
.7
+5.00 0%
+0.700%
200' VC
K = 47
SSD = 351'
V P I
E L
,1
.9
+0.700% +5.00
0%159' VC
K = 37 +5.00
0%
1.80%
-1.80%
1.80%
-1.80%
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .k e e le
NUMBER
SHEET
Superelevation Diagram
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
Reduce shoulders to 1', Lt. and Rt. Reduce shoulders to 1', Lt. and Rt.
Rock drain
Reduce shoulders to 1', Lt. and Rt.
Shoulder Stabilization, Rt.
Shoulder Stabilization, Rt.
Shoulder Stabilization, Rt.
10110
10110
G A S M
A R K E R
S T
A R
T W
E T
10125
10125
10125
FT
G A S
10130
G A S M
A R K E R
10135
C en tu ry L in k
Fi be ro pt ic
FT
10140
10150
G A S M
A R K E R
6" High Pressure Gas Excel
R ip r a p c la s s
R t.
E n d s e c ti o n
L t.
a n d R t.
I n s ta ll x x
C M
P
Ten M ile Creek
126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00
10140
10150
10160
10170
10180
10190
10140
10150
10160
10170
10180
10190
C10
LT EOP
RT EOP
Profile grade and axis of rotation
200'100'0
Scale in Feet
0%
6.0%
-6.0%
6.0%
0%
-6.0%
Profile grade
Existing ground
R ip r a p c la s s
R t.
E n d s e c ti o n
L t.
a n d R t.
I n s ta ll x x
C M
P
R ip r a p c la s s
R t.
E n d s e c ti o n
L t.
a n d R t.
I n s ta ll x x
C M
P after construction.
Match existing grading truck turn around.
Potential construction
Ten Mile Creek
PI 126+00.40
Curve = TRAIL-65
D
R = 500.00'
T = 25.28'
L = 50.52'
Curve = TRAIL-66
PI 126+57.05
D
R = 500.00'
T = 31.42'
L = 62.75'
T = 10.48'
Curve = TRAIL-67
PI 127+14.69
D
R = 180.00'
L = 20.93'
Curve = TRAIL-68
PI 128+27.29
D
R = 300.00'
T = 22.06'
L = 44.05' L = 58.42'
Curve = TRAIL-69
PI 128+78.57
D
R = 300.00'
T = 29.30'
Curve = TRAIL-70
PI 131+17.84
D
R = 1,000.00'
T = 133.53'
L = 265.49'
Curve = TRAIL-71
PI 133+16.87
D
R = 300.00'
T = 15.87'
L = 31.70' L = 25.63'
Curve = TRAIL-72
PI 134+57.18
D
R = 500.00'
T = 12.82'
Curve = TRAIL-73
PI 135+93.91
D
R = 600.00'
T = 25.01'
L = 49.99'
R = 200.00'
Curve = TRAIL-74
PI 136+73.22
D
T = 36.63'
L = 72.46'
Curve = TRAIL-75
PI 138+22.51
D
R = 300.00'
T = 55.23'
L = 109.23'
Curve = TRAIL-76
PI 139+92.40
D
R = 1,000.00'
T = 25.85'
L = 51.69'
P C
.4
P T
.0
P C
.1
P R
C
.6
P T
.3
P C
.2
P
T
.1
P C
.2
P R
C
.2
P T
.6
P C
.3
P T
.8
P C
.0
P
T
.7
P C
.3
P T
.0
P C
.9
P T
.8
P C
.5
P T
.0
P C
.2
P T
.5
P C
.5
P T
.2
P C
.2
P T
.3
+5.00 0%
V P I
E L
,1
.7
+5.00 0%
+2.900
100' VC
K = 48
SSD = 564'
V P I
E L
,1
.2
3+2.900
+4.30 0%
200' VC
K = 143
V P I
E L
,1
.5
+4.30 0%
+2.800%
200' VC
K = 133
SSD = 819'
V P I
E L
,1
.3
+2.800% +2.000%
200' VC
K = 250
SSD = 1449'
V P I
E L
,1
.5
0+2.000%
+4.60 0%
100' VC
K = 38
+4.60 0%
1.80%
-1.80%
1.80%
-1.80%
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .k e e le
NUMBER
SHEET
Superelevation Diagram
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
Reduce shoulders to 1', Lt. and Rt. Reduce shoulders to 1', Lt. and Rt.Reduce shoulders to 1', Lt. and Rt.
Shoulder Stabilization, Rt. Shoulder Stabilization, Rt.
Shoulder Stabilization, Rt.
Stabilization, Rt.
Shoulder
C e n tu ry L in k F ib e ro p ti c
U
U
U
U
U
10150
G A S M
A R
K E R
U
U
10155
10155
U
U
U
10160 U
0 U 6 U
U
10165
U
U
G A S
10170
G A S M
A R
K E R
U
U
U
U
U
U
U
U
U
U
U
10180
10180
10180
U
10185
10185
U
U
U
U
U
U
U
U
U
U 6U
U
10190
10190
U
U
U
U
U
G A S M
A R
K E R
10195
U
6" H igh Pr es su re G as Ex ce l
140+00 141+00 142+00 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00 153+00 154+00
10190
10200
10210
10220
10230
10240
10190
10200
10210
10220
10230
10240
C11
LT EOP
RT EOP
Profile grade and axis of rotation
200'100'0
Scale in Feet
0%
6.0%
-6.0%
6.0%
0%
-6.0%
Profile grade
Existing ground after construction.
Match existing grading truck turn around.
Potential construction
Curve = TRAIL-77
PI 140+89.82
D
R = 1,000.00'
T = 41.62'
L = 83.19'
Curve = TRAIL-78
PI 142+78.33
D
R = 300.00'
T = 45.98'
L = 91.26'
PI 143+93.63
Curve = TRAIL-79
D
R = 500.00'
T = 37.09'
L = 74.04'
Curve = TRAIL-80
PI 145+81.30
D
R = 300.00'
T = 20.91'
L = 41.75' L = 25.39'
Curve = TRAIL-81
PI 146+42.44
D
R = 300.00'
T = 12.70' T = 20.97'
Curve = TRAIL-82
PI 148+90.97
D
R = 500.00'
L = 41.92' L = 74.08'
Curve = TRAIL-83
PI 149+74.51
D
R = 900.00'
T = 37.06'
Curve = TRAIL-84
PI 151+12.40
D
R = 1,000.00'
T = 20.99'
L = 41.97' L = 36.90'
Curve = TRAIL-85
PI 153+47.58
D
R = 1,000.00'
T = 18.45'
B H -0
P C
.5
P T
.2
P C
.2
P T
.3
P C
.3
P T
.6
P C
.5
P T
.5
P C
.3
P T
.1
P C
.7
P
T
.1
P C
.0
P T
.9
P C
.4
P T
.5
P C
.4
P T
.3
P C
.1
P T
.0
P C
.8
P T
.9
P C
.1
V P I
E L
,1
.5
+4.60 0%
100' VC
K = 38 V P I
E L
,1
.5
+4.60 0%
+1.600%
57' VC
K = 19
SSD = 388'
V P I
E L
,2
.1
+1.600%
+5.00 0%
126' VC
K = 37
V P I
E L
,2
.8
+5.00 0%
+3.70 0%
100' VC
K = 77
SSD = 880'
V P I
E L
,2
.6
+3.70 0%
+2.800%
200' VC
K = 222
SSD = 1299'
V P I
E L
,2
.2
0+2.800%
+4.70 0%
100' VC
K = 53
1.80%
-1.80%
1.80%
-1.80%
STATE PROJECT
A
M .1
.2
.2 p r o je c ts C
O s u m R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .k e e le
NUMBER
SHEET
Superelevation Diagram
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
Reduce shoulders to 1', Lt. and Rt. Reduce shoulders to 1', Lt. and Rt.
Rock drain
Shoulder Stabilization, Rt. Shoulder Stabilization, Rt. Shoulder Stabilization, Rt.
C e n tu ry L in k F ib e ro p ti c
10195
10215
10215
10220
G A S M
A R
K E R
10225
10230
10245
U G T
E L
G A S M
A R
K E R
10250
6" H igh Pr es su re G as Ex ce l
10255
R ip r a p c la s s
R t.
E n d s e c ti o n
L t.
a n d R t.
I n s ta ll x x
C M
P
Ten Mile Creek
S e e S h e e t
D
R ip r a p c la s s
R t.
C o n c r e te H e a d w a ll
L t.
R t.
r is e b o x c u lv e r t
I n s ta ll
L
N F T s p a x
B
-1
B H -1
B H -1
P C
.1
P T
.0
P C
.8
P T
.9
P C
.1
P T
.5
P C
.5
P T
.8
P C
.0
P T
.4
P C
.7
P T
.2
P C
.4
P T
.6
P C
.2
P T
.3
P C
.7
P R C
.4
PT 163+79.77
5+
PC
6+ .65
P T
.7
P C
.5
PT 171+30.23
PC 171+73.62
P R
C
.0
POT 172+37.25
V P I
E L
,2
.8
+4.70 0%
+1.900%
200' VC
K = 71
SSD = 485'
V P I
E L
,2
.7
+1.900% +0.600%
200' VC
K = 154
SSD = 930'
V P I
E L
,2
.4
+0.600% -2.000%
100' VC
K = 38
SSD = 465'
V P I
E L
,2
.7
-2.000% +0.500%
93' VC
K = 37 V P I
E L
,2
.7
+0.500% -5.000%
104' VC
K = 19
SSD = 248'
1.80%
-1.80%
1.80%
-1.80%
1.80%
-1.80% -1.00%
1.00%
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .k e e le
NUMBER
SHEET
Superelevation Diagram
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
154+00 155+00 156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00
10230
10240
10250
10260
10270
10280
10230
10240
10250
10260
10270
10280
C12
200'100'0
Scale in Feet
LT EOP
RT EOP
Profile grade and axis of rotation
0%
6.0%
-6.0%
6.0%
0%
-6.0%
Profile grade
Existing ground
168+00
E 2818321.77
N 1592292.96
Station 163+70.00
Begin Option X
End Schedule A
Remove and reset gate
Install 14 LNFT of fence
Install 14 LNFT of fence See Sheet C14
Ramp to SH 91
Curve = TRAIL-86
PI 154+74.94
D
R = 300.00'
T = 19.06'
L = 38.07' L = 42.47'
Curve = TRAIL-87
PI 155+28.39
D
R = 300.00'
T = 21.27'
Curve = TRAIL-88
PI 156+36.20
D
R = 500.00'
T = 12.70'
L = 25.39'
T = 22.32'
Curve = TRAIL-89
PI 157+39.32
D
R = 200.00'
L = 44.45'
T = 31.29'
Curve = TRAIL-90
PI 158+74.03
D
R = 500.00'
L = 62.49'
Curve = TRAIL-91
PI 159+92.55
D
R = 300.00'
T = 12.15'
L = 24.29'
Curve = TRAIL-92
PI 161+26.93
D
R = 400.00'
T = 39.66'
L = 79.06'
Curve = TRAIL-93
PI 163+31.72
D
R = 23.00'
T = 5.96'
L = 11.66' L = 42.35'
Curve = TRAIL-94
PI 163+67.67
D
R = 23.00'
T = 30.25'
Curve = TRAIL-95
PI 166+77.38
D
R = 27.00'
T = 27.72'
L = 43.13'
20' x 10' with 10' long tapers
Construct aggregate widening for rest area, Rt. (7" depth)
Reduce shoulders to 1', Lt. and Rt. CO91 Pedestrian Overpass Bridge to 1', Lt. and Rt.
Reduce shoulders
Shoulder Stabilization, Rt. Shoulder Stabilization, Rt.
10222.6
8 FT CONC
10225
10225
10225
CONC
10230
10230
10230
10235
10235
10235
10235
10240
10240
10240
10240
10240
10240
N O P
A R
K I N
G
10245
10245
10245
10245
10245
10245
U G T
EL
FI
B
ER
O
PT
IC
N O P
A R
K I N
G
.0
T E L E
N O P
A R
K I N
G
G
AS
M
AR
K
ER
VEN
T
M I N
E N
O T
R E S
P A
S S
G
AS
M
AR
K
ER
10250
10250
10250
10250
10250
10250
S C
E N
IC
B
Y W
A Y
STOP
G
AS
M
AR
K
ER
6" High Pressure Gas Excel
C en tu ry L in k
Fi be ro pt ic
S C
E N I C B
Y W
A Y
10255
10255
10255
10255
10255
3X
3X
3X
3X 3 3X
5X
10260
10260
10260 10260
10260
10260
10260 10260
10260
2X
G
AS
M
AR
K
ER
2X 3 2X
S T
E E
L G
AS
M
AR
K
ER
10265 10265
10265
10265
510265
10270
10270
10270
10275
10275
10280
U
TI
LI
TY
PE
D
ES
TAL
6X
FT
G
AS
SH
BH-
BH-
BH-
P C
.7
P R
C
.4
PT 163+79.77
165+00
PC 166+49.65
P T
.7
P C
.5
PT
.2
3 PC
1+
.6
PR
C 172+
07.00
PT 172+31.70
POT 17
2+37.2
-5.000%
V P I
E L
,2
.5
-5.000%
66' VC
K = 10
VPI 171+80
EL 10,247.67
+1.600%
VPI 171+95
EL 10,248.27
+4.02 5%
VPI 172+20
EL 10,249.88
+6.4 60%
VPI 172+30
EL 10,250.77
+8.8
.1
,2
.7
-1.80%
1.80% 0.83%
-0.50%
STATE PROJECT
A
M N C
O s u m R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .k e e le
NUMBER
SHEET
Superelevation Diagram
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
168+00 169+00 170+00 171+00
10230
10240
10250
10260
10270
10280
10230
10240
10250
10260
10270
10280
C13
200'100'0
Scale in Feet
RT EOP
LT EOP
Profile grade and axis of rotation
0%
6.0%
-6.0%
6.0%
0%
-6.0%
Profile grade
Existing ground
Climax Mine Driveway
Perform no work along
Curve = TRAIL-97
PI 171+92.82
D
R = 27.00'
T = 19.20'
L = 33.38'
Curve = TRAIL-98
PI 172+20.29
D
R = 27.00'
T = 13.28'
L = 24.69'
Curve = TRAIL-96
PI 171+06.95
D
R = 50.00'
T = 28.45'
L = 51.73'
172+00
22.
8 FT
CONC
10225
CONC
10230
10230
34.
10235
10235
10235
10240
10240
10240
10240
N O P
A R
K I N
G 10245
10245 10245
10245
10245
10245
F
IB
E R O
P T
IC
P
N O P
A R
K I N
G
.0
T E
L E
K-
RAI
L
N O P
A R
K I N
G of concrete barrier
Remove approx. 40'
G A S M
A R
K E
R
M I N
E N
O T
R E S
P A
S S
V E
N T
M I N
E N
O T
R E S
P A
S S
10250
10250
10250
10250
10250
10250
10250
10250
10250
S C
E N I C B
Y W
A Y
STOP
G A S M
A R
K E
R
6" High Pressure Gas Excel
S C
E N I C B
Y W
A Y
10255
10255
10255
10255
10255
10255
X
X
X
X
X
X
10260
10260
10260
10260
10260
10260
X
X
X
S T E E L
G A S M
A R
K E
R
10265
10265
10265
10265
10265
10265
10270
10270
10270
10270
10270
10275
10275
10275
10275
10275
10280
10280
U T
IL
IT
Y
P E
D E S
T A
L
X F
T
G A S
E 2817938.15
N 1591970.71
Station 172+37.25
End Option X R ip r a p c la s s
L t.
E n d s e c ti o n
L t.
a n d R t.
I n s ta ll x x
C M
P
M N C
O s u m R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .k e e le
NUMBER
SHEET
Superelevation Diagram
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
B H -1
B H -1
B H -1
+00
10220
10222.6
8 FT CONC
10225
10225
10225
CONC
10230
10230
10230 10230
10230
10234.3
10235
10235
10235
10235 10235
10235
10240
10240
10240
10240 10240
10240 10240
N O P
A R
K I N
G
10245
10245
10245
10245
10245
10245 10245
10245
10245
F
IB
E R O
P T
IC
P
N O P
A R
K I N
G
.0
T
E L E
K-R
AIL
N O P
A R
K I N
G
G A S M
A R
K E R
M I N
E N
O T
R E S
P A
S S
V E N T
M I N
E N
O T
R E S
P A
S S
10250 10250 10250
10250
10250
10250
10250
10250
10250
10250
10250
S C
E N I C B
Y W
A Y
STOP
G A S M
A R
K E R
6" High Pressure Gas Excel
S C
E N I C B
Y W
A Y
10255 10255 10255
10255
5 10255
10255
10255
10255
10255
X
X
X 2 3
X 3 3 X
X
10260
10260
10260 10260 10260
10260
10260
10260
10260
10260
10260
X 3 2 X 3 2 X
S T
E E
L
G A S M
A R
K E R
10265
10265
10265
10265 10265
10265
10265
10270 10270
10270
70 10270
10270
10275
10275
10275
10280
U T
IL
IT
Y
P E D E S T A L 6
X F
T G
A S
10285
10290
P O
T
.0
P C
.4
P T
.9
P C
.7
P T
.1
,2
.9
V P I
E L
,2
.0
+0.500% +4.80
0%
43' VC
K = 10 V P I
E L
,2
.0
+4.80 0% -8.000%
38' VC
K = 3
SSD = 103'
V P I
E L
,2
.5
-8.000%
+2.000%
43' VC
K = 4
,2
.0
1.80%
-1.80%
1.80%
-1.80%
403+50
403+50
3.80%
-0.30%
200'100'0
Scale in Feet
400+00 401+00 402+00 403+00 404+00
SH 9
RT EOP
LT EOP
Profile grade and axis of rotation
10,240
10,220
10,260
10,250
10,230
10,270
0%
10,220
10,260
10,250
10,240
10,230
10,270
6.0%
-6.0% -6.0%
0%
6.0%
Trail Mainline
Profile grade
Existing ground
C14
E 2818324.01
N 1592292.86
E 2818038.29
N 1592059.39
E n d s e c ti o n s
L t.
a n d R t.
I n s ta ll x x
C M
P
Curve = RAMP-1
PI 401+22.40
D
R = 200.00'
T = 28.98'
L = 57.56'
Curve = RAMP-2
PI 403+33.44
D
R = 225.00'
T = 42.67'
L = 84.33'
R
R
Station 400+00 = Trail Station 163+67.76
Begin Ramp To SH 91 - Schedule A
Station 403+75.11
End Ramp to SH 91 - Schedule A
PI 500+16.59
Curve = AP0068-1
D
R = 20.00'
T = 6.57'
L = 12.70'
0+
AP0068500+00 501+00
E 2820663.75
N 1606646.99
E 2820639.47
N 1606646.96
Proposed grade
Existing ground
100'50'0
Scale in Feet
1. Match typical section on A6
NOTE:
D1
Station 500+00.00 = Trail Station 0+68.15
Begin AP0068
Schedule A
Station 500+25.00
End AP0068
Schedule A
P O
T
.0
P C
.0
P T
.7
P O
T
.0
3X3X2
STATE PROJECT
P
M N C
O s u m R o a d w a y C
A D
D S h e e ts D
M in o r P
P A
P .d g n
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
V P I
E L
,7
.3
-0.750%
,7
.4
V P I
E L
,7
. 1
+4.89 7%
+2.122%
,7
.2
A
M .1
.2
.2 p r o je c ts C
O s u m R o a d w a y C
A D
D S h e e ts T A
O P P
N P .d g n
U s e r k e ll y .k e e le
NUMBER
SHEET
CO
FREMONT PASS TRAIL
CO FLAP SUM91(1)
D2
Existing Ground
0 10 20 30 40 50-40 -30 -20 -10
20'10'0
Scale in Feet
Backfill
N.T.S.
8"
.0
CONCRETE BOX CULVERT TYPICAL SECTION
8"
Centerline
Pathway
Wingwall A
Wingwall B Wingwall D
Wingwall C
CL
El. 10218.45
Wingwall A & B
Toe wall (typ.)
Elev. 10215.34
Stream Inlet
PLAN
V a r ie s
1'
1'
Headwall (typ.)
3.
Edge of Path Way
Low flow channel 3.
3.Streambed material 1
10220
10215
8' span x 4' rise concrete box culvert
5.3% line
Fiber optic
Gas line
108°
Pay Length = 26'
13'13'
10225
10230
10235
10240
10210
10205
10200
10195
Elev. 10214.67
Box Culvert Inlet Invert
Elev. 10213.29
Box Culvert Outlet Invert
Wingwall B El. 10215.45
Wingwall A El. 10215.45
El. 10219.84
Wingwall C & D
Wingwall D El. 10216.84
Wingwall C El. 10216.84
STA. 145+68.63
ELEVATION
E m b e d m e n t
Streambed material channel Low flow haunch (typ.)
8" x 8"
3.4
3'
Foundation fill
8.0' gas line
Underground fiber line
Underground
8'
8'
90°
10219.8 Profile Grade El.
Sta. 145+68.63
' (ty p
(typ.)
Concrete headwall m a x
18' (max.)
(3' min. depth)
Class 4 riprap
+3.00%-3.03% -5.10%
-2.43% 1:2
:1 .4 streambed channel.
4. Shape constructed channel to blend with natural
3. See Sheet T8 for AOP details.
Headwall. See Special 601-A for details.
and paid for according to item 60103-0000, Concrete,
2. Headwalls, toewalls, and wingwalls will be constructed for box culvert requirements.
1. See Section 602 of the Special Contract Requirements
NOTES:
Elev. 10213.95
Stream Outlet
E1
200'100'0
Scale in Feet
200'100'0
Scale in Feet sheet for erosion and sediment control symbols.
2. Refer to the Conventional Plan Symbols and Abbreviations
1. Erosion and sediment control devices not to scale.
NOTE:
0+00 TO 28+00
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
P
M N C
O s u m R o a d w a y C
A D
D S h e e ts E E
C P
E .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
CO
E2 sheet for erosion and sediment control symbols.
2. Refer to the Conventional Plan Symbols and Abbreviations
1. Erosion and sediment control devices not to scale.
NOTE:
200'100'0
Scale in Feet
200'100'0
Scale in Feet 28+00 TO 56+00
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
P
M N C
O s u m R o a d w a y C
A D
D S h e e ts E E
C P
E .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
CO
10000
10000
10005
10005
10005
10010
10010
10010
10015
9960 9965
E3 sheet for erosion and sediment control symbols.
2. Refer to the Conventional Plan Symbols and Abbreviations
1. Erosion and sediment control devices not to scale.
NOTE:
56+00 TO 84+00
CONTROL
EROSION AND SEDIMENT
200'100'0
Scale in Feet
200'100'0
Scale in Feet
STATE PROJECT
P
M N C
O s u m R o a d w a y C
A D
D S h e e ts E E
C P
E .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
CO
10050
10055
10055
10060
10060
10060
10065
10070
10075
10080 1 0 10085
10085
10085
10085
10085
10090
10095
10025
10025
10030
10030
10030 10030
10030
10040
10045
10045
10050
10050
10055
10055
10060
E4
200'100'0
Scale in Feet
200'100'0
Scale in Feet sheet for erosion and sediment control symbols.
2. Refer to the Conventional Plan Symbols and Abbreviations
1. Erosion and sediment control devices not to scale.
NOTE:
84+00 TO 112+00
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
P
M N C
O s u m R o a d w a y C
A D
D S h e e ts E E
C P
E .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
CO
10150
10155
10155
10160
10165
10170
10180
10180
10180
10185
10185
10190
10190
10110
10110
10125
10125
10125
10130
10135
10140
E5
200'100'0
Scale in Feet
200'100'0
Scale in Feet sheet for erosion and sediment control symbols.
2. Refer to the Conventional Plan Symbols and Abbreviations
1. Erosion and sediment control devices not to scale.
NOTE:
112+00 TO 140+00
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
P
M N C
O s u m R o a d w a y C
A D
D S h e e ts E E
C P
E .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
CO
10225
10225
10225
10230
10230
10230
10235
10235
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.