21-697DCK-25-R-00405-0002.pdf
PDF 1 MB Posted
- Attached to
- SEA ATCT, TRACON, ARTCC Grounds Maintenance
- Solicitation number
- 697DCK-25-R-00405
About this file
This is a federal solicitation (Amendment 0002) for SEA ATCT, TRACON, and ARTCC Grounds Maintenance services issued by the Federal Aviation Administration (FAA) in Fort Worth, Texas. The contract covers landscaping and grounds maintenance for three FAA facilities in the Seattle area: Seattle ATCT (Air Traffic Control Tower), TRACON (Terminal Radar Approach Control), and ARTCC (Air Route Traffic Control Center). The period of performance is from 01/01/2026 to 12/31/2030, with services including grass cutting, edging, fertilization, tree and shrub pruning, irrigation maintenance, and vegetation management. The maintenance frequency varies by facility, with the ATCT and TRACON requiring services every two weeks from April to September and monthly from October to March, while the ARTCC requires weekly service from April to September and monthly from October to March. The previous contract was part of a larger consolidated janitorial service contract (697DCK-19-C-00068) awarded to Fortis Industries, Inc. with a total value of $8,625,866.36.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21-697DCK-25-R-00405-0004.pdf | ||
| 21-697DCK-25-R-00405-0003.pdf | ||
| 697DCK-25-R-00405-0001.pdf | ||
| 16-697DCK-25-R-00405.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.
PAGE OF PAGES
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.
E. IMPORTANT: Contractor is not, is required to sign this document and return
ORDER NO. IN ITEM 10A.
1 23
0002 09/24/2025
FEDERAL AVIATION ADMINISTRATION
AAQ-500 - REGIONAL ACQUISITIONS
10101 HILLWOOD PARKWAY
FORT WORTH TX 76177-1524
AAQ520FTW-AFN
x
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x
697DCK-25-R-00405
1 copies to the issuing office.
09/24/2025
(x)
SEA ATCT, TRACON, ARTCC Grounds Maintenance
Amendment 0002 - The purpose of this amendment is to incorporate the updated Statement of
Work (SOW), the Site Visit Sign-In Sheet for the ARTCC, and the Questions and Answers document. The Sign-In Sheets were not received from the sites prior to the issuing of this amendment. There will be no changes to the terms and/or conditions on this solicitation as a result of this amendment.
Period of Performance: 01/01/2026 to 12/31/2030
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jennifer J. Davis
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
i
Table of Contents
1.0 PURPOSE
1.1 GENERAL REQUIREMENTS
1.2 HOLIDAYS
2.0 RESERVED
3.0 REQUIREMENTS
3.1 WORK OUTSIDE REGULAR HOURS
3.2 MANAGEMENT
3.2.1 Work Control
3.2.3 Herbicides and Pesticides
3.3 CONTINUITY OF SERVICES
3.4 MAINTENANCE LEVEL I (ADMINISTRATIVE AREAS)
3.4.1 Grass Cutting
3.4.2 Edging
3.4.3 Plant and Shrub Pruning
3.4.4 Cultivation and Mulching of Shrubs, Hedges, and Flower Beds
3.4.5 Fertilization
3.4.6 Trash and Litter Collection and Disposal
3.5 MAINTENANCE LEVEL II
3.5.1 Grass Cutting
3.5.2 Edging
3.5.3 Fertilization
3.5.4 Trash and Litter Collection and Disposal
3.6 MAINTENANCE LEVEL III
3.7 MAINTENANCE LEVEL IV (RAILROAD AND POWERLINE RIGHT-OF-WAYS)
3.8 INDEFINITE QUANTITY WORK ITEMS
3.8.1 Raking
3.8.2 Tree Removal
3.8.3 Stump and Above Ground Root Removal
3.8.4 Grassing
3.8.5 Erosion Control
3.8.6 Underbrushing
3.8.7 Tree Pruning
3.8.8 Irrigation
3.8.9 Ditch Cleaning
3.8.10 Tree and Shrub Establishment
4.0 GOVERNMENT FURNISHED PROPERTY AND SERVICE
4.1 GOVERNMENT FURNISHED FACILITIES
4.2 GOVERNMENT FURNISHED EQUIPMENT
4.3 GOVERNMENT FURNISHED MATERIAL
4.4 AVAILABILITY OF UTILITIES
4.5 CONTRACTOR FURNISHED ITEMS
5.0 DEFINITIONS
1.0 Purpose
The purpose of this Statement of Work (SOW) is to secure comprehensive grounds maintenance services for the following facilities, emphasizing environmental compliance, aesthetic standards, and safety.
Locations of Service:
Seattle ATCT – 2440 S 166th St., Seattle, WA 98159 Seattle TRACON – 825 South 160th St. Burien, WA 98148 Seattle ARTCC – 3101 Auburn Way S, Auburn, WA 98092
Services will include grass cutting, edging, fertilization, litter collection, vegetation removal, tree and shrub pruning, irrigation maintenance, and compliance with environmental regulations. The contract will operate on a firm fixed price and indefinite quantity basis, requiring requires services for every two (2) weeks from April to September for the ATCT and TRACON, followed by monthly maintenance from October to March. The ARTCC requires weekly service from April to September, followed by monthly maintenance from October to March. With mulch only needing to be applied twice (2) a year; early spring (March to April) and late fall (October to early November). The contractor will adhere to sustainable practices and report on waste diversion rates as part of the agreement.
Period of Performance: The Period of Performance shall be for one (1) Base Year & four 12-month Option Years.
The Government reserves the right to extend the term of this contract at the prices set forth in Section B of the Contract in accordance with the terms and conditions contained in clause 3.2.4-34 Option to Extend Services.
1.1 General Requirements
The Contractor must furnish all labor, supervision, equipment, and materials necessary to provide grounds maintenance services in accordance with the requirements specified herein. The operations to be performed must include cutting grass, edging, fertilization, collection and disposal of litter and trash, vegetation cutting and removal, underbrushing, grassing, sodding, sprigging, erosion control, tree and shrub pruning, tree and stump removal, irrigation, ditch cleaning, and other miscellaneous services as described herein. The ARTCC and ATCT facilities have an inner and outer fence and the area in between the fences must be maintained. In addition, there is a buffer zone around the outer fence that must be maintained for all three facilities.
All operations will be performed pursuant to Executive Orders 13423 and 13514, and the FAA Green Procurement Plan (GPP). As such, the Contractor must use environmentally preferable products and services. These program elements include but are not limited to: products and services that are energy-efficient, water-efficient, bio based, non-ozone depleting, contain recycled-content, and non- toxic or less-toxic alternatives; diversion of non-hazardous waste and construction and demolition debris from landfills, including composting; alternative fuels use and fuel efficient vehicles and equipment, reduced greenhouse gas emissions, and integrated pest management. These program elements are described on the Office of the Federal Environment Executive website (http://www.ofee.gov).
1.2 Holidays
Contractor services that fall on the following federal holidays will need to be scheduled on a different day or special arrangements need to be made with the Contracting Officer Representative (COR) to ensure the needed point of contact is available. A skeleton crew of on-site FAA personnel will consist of essential safety related positions only, on the holidays listed below:
New Year's Day (January 1)
Martin Luther King Jr. Day (Third Monday in January) Presidents' Day (Third Monday in February) Memorial Day (Last Monday in May) Juneteenth (June 19) Independence Day (July 4) Labor Day (First Monday in September) Indigenous Peoples' Day/Columbus Day (Second Monday in October) Veterans Day (November 11) Thanksgiving Day (Fourth Thursday in November) Christmas Day (December 25)
2.0 Reserved
2.1 Contingency for Additional Services
In the event that services outside the original scope of work are required, such as emergency tree removal, irrigation system repair, or additional seasonal landscaping tasks, the contractor may be directed to perform these services with prior written approval from the Contracting Officer Representative (COR) or authorized representative. T the contractor must provide a detailed cost estimate for any additional services before commencing the work. The government reserves the right to approve or decline these additional services based on necessity, budget constraints, and the terms outlined in this agreement.
2.2 Emergency Situations
If an emergency arises (e.g., storm damage, safety hazards caused by fallen trees, or other unforeseen environmental events), the contractor may be called upon to perform immediate corrective actions. The contractor is required to respond within 24 hours of notification. All emergency services must be reported and authorized by the Contracting Officer in writing.
2.3 Scope Adjustments
Minor adjustments to the scope of work may be necessary due to unforeseen site conditions, changes in government priorities, or other factors. The government reserves the right to modify the scope of work within reasonable limits to accommodate such changes. Any modifications in scope must be documented, and the contractor must be notified in writing by the Contracting Officer. Adjustments in pricing, if necessary, will be negotiated and must fall within the budgetary limits of the contract.
2.4 Priority of Work
The government reserves the right to reprioritize areas of the site for grounds maintenance as needed. The contractor must accommodate any priority changes within the agreed schedule, ensuring that high-priority areas are serviced promptly. Should the reprioritization require additional labor or resources beyond the standard agreement, the contractor must submit a proposal for approval, with the additional costs potentially covered by the reserve fund.
3.0 Requirements
3.1 Work Outside Regular Hours
Except as may otherwise be specified, all work must be performed during regular hours. If the Contractor desires to carry on work on Saturday, Sunday, holidays, or outside regular hours, he/she may submit application a request in advance to the COR for approval.
3.2 Management
The Contractor must manage the total work effort associated with the ground’s maintenance services required herein to assure fully adequate and timely completion of these services. Included in this function will be a full range of management duties including, but not limited to, planning, scheduling, report preparation, and quality control. The Contractor must provide an adequate staff of personnel with the necessary management expertise to assure the performance of the work in accordance with sound and efficient management practices.
3.2.1 Work Control
The Contractor must implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking of work in progress. The Contractor must plan and schedule work to assure labor, equipment, and material are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and status reports must be provided when requested by the Government Representative.
3.2.3 Herbicides and Pesticides
The Contractor must manage pests and invasive and noxious weeds via the least toxic means available.
Dirt, moisture, clutter, foodstuffs, and building penetration must be controlled and baits and traps must be used in lieu of pesticides. The Contractor must also use bio-based products (designated Bio Preferred by the U.S. Department of Agriculture). Herbicide and pesticide controls must be formulated to target specific pests and must be implemented only when pests have reached aesthetic or health thresholds verified by the COR. The Contractor must not perform regularly scheduled, periodic pesticide or herbicide applications except in situations where no other approach or technology is available to protect personnel or property of high value. If herbicides or pesticides are to be used, the application must occur during unoccupied off hours, scheduled and approved by the COR in advance. and t The Contractor must be licensed by the applicable State agency to provide pesticide application in the categories specified in this contract. All work must be under the superintendence of a certified, responsible individual, and in accordance with Federal, State, local laws and requirements. The Contractor must submit Material Safety Data Sheets meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313 for all hazardous chemicals to be used.
3.2.3.1 Control Methods
The Contractor must utilize only herbicides registered by the Environmental Protection Agency. Use must be in strict compliance with label directions for the control of the target weeds. Herbicides selected, application rates, and application techniques must have the prior approval of the COR. Additionally, the Contractor must control pests using integrated pest management principles (http://www.epa.gov/pesticides/factsheets/ipm.htm).
3.2.3.2 Trash, Litter, and Vegetative Debris Collection and Disposal The Contractor must collect trash, litter, and vegetative debris (e.g., natural vegetation, such as leaves, pine straw, limbs, and stumps) in all grassed areas, plant and shrub beds, wooded areas, sidewalks, streets, and curbs in all maintenance levels (further described below) at the frequency specified and dispose of it in the appropriate waste, recycling, or composting receptacles offsite. In accordance with EO 13514, FAA is required to divert from landfill or incineration facility disposal a minimum of 50% of the non-hazardous waste generated as a result of its operations. In support of meeting this requirement, the Contractor must divert from landfill or incineration facility disposal a minimum of 50% of the non-hazardous waste generated as a result of the Contractor’s work, to the maximum extent feasible. In doing so, the Contractor must appropriately utilize the facility’s existing waste, recycling and composting (either onsite or offsite composting) program. If no such program exists, the Contractor must develop and operate, at its own expense, a comprehensive waste, recycling, reuse and/or composting program for non-hazardous solid waste and vegetative debris resulting from its grounds maintenance operations. The Contractor must report non-hazardous waste diversion rates on a regular basis. The Whole Building Design Guide (http://www.wbdg.org) outlines recommended practices for waste and debris removal. All trash, liter, and vegetative debris must be removed off the activity the same day as collected.
3.2.3.3 Contractor's Supervisor
During the execution of all work involving the handling and/or use of herbicides, the Contractor must give the job his personal supervision or must have on the job a responsible and competent representative with the authority to speak and act for him. The whereabouts on the activity of the supervisor must be made always known to the Government Representative when work is performed.
3.2.3.4 Uncertified Personnel
Uncertified personnel who apply pesticides must have been employed in weed control for a minimum of 30 days and have received training in:
a. Selection, application, and evaluation of appropriate control procedures.
b. Safe and effective application techniques, and the calibration and use of all equipment required.
c. Handling, storage, and transfer of pesticide materials as required.
d. (d) Reading, interpreting, and following herbicide label instructions.
e. Use and maintenance of all required safety equipment.
f. The consequences of preparing a herbicide to be given or sold to an individual other than an authorized employee of the Contractor or regulatory official.
g. Procedure for handling herbicide spills, including reporting procedures.
h. The security of vehicles and equipment.
3.2.3.5 Pesticide Use Records
The Contractor must prepare, submit, and maintain daily records of herbicide usage. This record must be filled out daily as weed control operations are performed, and all entries must be completed within 24 hours of chemical usage. Completed records must be made available upon request for inspection and must be forwarded to the COR with the monthly invoice for each month following the month of operation. Records which are rejected by the COR due to improper preparation must be resubmitted by the Contractor at no additional cost to the Government.
3.3 Continuity of Services.
To ensure continuity of essential services, the successful bidder must be prepared to fully commence work on the start date of this contract and should not assume that Government or previous Contractor employees will be available to guide, direct, or specifically orientate each Contractor employee.
3.4 Maintenance Level I (Basic & Routine Maintenance)
The Contractor must provide grounds maintenance services in maintenance level I areas at the times and frequencies specified in Attachment #1 the Summary Table below. Attachment #2 provides information of the size, location, and layout of the land parcels which make up maintenance areas.
Examples: Regular mowing, weeding, light pruning, debris collection, and general tidying.
Personnel: Basic knowledge required; often handled by general landscape maintenance crews.
Frequency: Weekly or bi-weekly, as specified in Attachment #1 the Summary Table below.
Objective: To maintain an orderly appearance and prevent overgrowth or early signs of decline.
3.4.1 Grass Cutting
Grass areas located at the ARTCC within this maintenance level must be cut to a uniform height between 2 inches and 2.5 inches at the frequencies specified. Grass areas located at the TRACON along the fence boundary within this maintenance level must be cut to a uniform height between 2 inches and 2.5 inches at the frequencies specified, other grassed areas at the TRACON must be cut to between 3 and 4 inches.
All grassed areas located within this maintenance level must be cut to a uniform height between 2 inches and 2.5 inches at the frequencies specified. If any bare ground within the limits of an area becomes vegetated with grass, weeds, or other similar growths through natural spread, it must be maintained as part of the basic contract. Prior to cutting, any trash, paper, or other debris that would detract from the finished appearance or present a safety hazard must be disposed of in the appropriate waste, recycling, and/or composting receptacles. Such debris includes but is not limited to paper, cans, bottles, limbs, pinecones, rocks, and other such objects within the maintenance area, and must include trash, paper, dead leaves, and other debris lodged in shrubs, hedges, fences, and along foundations and other walls. Debris must be disposed of off the activity the same day as collected.
Grass cutting is to be accomplished free of scalping, rutting, bruising, and uneven and rough cutting.
Cutting equipment must have sharp cutting edges which produce a neat, clean, even cut. Use of cutting equipment which is out of adjustment, thereby causing streaks or irregularities, uneven cutting, plowing, or gouging of the soil must not be permitted. Ground speeds and mower speeds must be synchronized to assure effective cutting action. After cutting, grass must have a uniform height. Grass clippings must not be windrowed or allowed to be deposited in piles or clumps. Grass clippings must be uniformly distributed over the mowed area. Grass areas close or adjacent to buildings, hydrants, parking lots, manholes, fences, trees, hedges, and shrubs are included in mowing requirements, and may require hand mowing.
Trimming around trees, shrubs, flower/shrub beds, cultivated areas, poles, walls, valves, and other similar objects must be accomplished to match the height and appearance of the surrounding mowed grass.
Trimming may be accomplished by hand clipping, by use of "weed eater" type equipment, or by herbicide treatment. Trees and shrubs must not be damaged by trimming operations. Trimming with herbicide treatment must be confined to an area extending 12 inches from the object being trimmed. Grassed areas, trees, or shrubs which are killed or damaged as a result of the Contractor's work must be repaired or replaced by the Contractor at no cost to the Government. Trimming operations must be considered a part of grass cutting and must be accomplished concurrently (same day) with grass cutting operations. Grass cutting will not be considered complete until all trimming operations are accomplished. Grass clippings and trimmings must be removed from sidewalks and other paved areas the same day the grass is cut.
3.4.2 Edging
All sidewalks, driveways, street edges, curbs, other paved areas, and shrubbery areas located within this maintenance level must be edged in accordance with the frequencies specified. Edging must create a l/2 inch wide and l inch deep clear zone immediately adjacent to the paved surface. All edging must be by mechanical means. The edging operation must include removal of grass and other vegetation which has encroached onto street and other paved surfaces from adjoining grassed areas. Where driveway or street pavement edge is not discernable due to grass encroachment, a straight and even line approximating the edge of pavement must be established and maintained. The edging operation must produce neat, clean lines along the sides of sidewalks and other areas edged, and must be accomplished free of scalping, rutting, bruising, uneven and rough cutting. All vegetation growing in the following areas must be removed during the edging operation:
1. Sidewalk and driveway expansion joints and cracks.
2. Street/driveway curbing expansion joints.
3. Cracks between curbing and street/driveway pavement.
For continued maintenance of vegetation growing in cracks and expansion joints, herbicide treatment may be utilized to reduce the amount of mechanical work. The use of herbicides must not be allowed for the purpose of eliminating or reducing normal mechanical edging along straight paved edges (sidewalks, etc.). Debris generated by edging operations, which falls on or is thrown on sidewalks, on curbs, in gutters, streets, or is thrown on nearby sod, causing an unsightly appearance, must be removed from the site the day of the edging operation, and disposed of the activity.
3.4.3 Plant and Shrub Pruning
Shrubs, bushes, hedges, and cultivated plants must be pruned at the frequency specified. All clippings and debris must be removed from the site the same day and disposed of, recycled, or composted off the activity [see Section 3.2.3.2 for waste management requirements]. Prune in early spring unless the shrub flowers before the end of June. If the shrub flowers before June, prune immediately after it finishes flowering. If the shrub flowers in summer or autumn, prune in winter or spring before new growth begins.
Pruning must be accomplished so as to:
1. Remove no more than one-third of the new growth at a time.
2. Reduce the size and growth rate of each shrub by clipping approximately 20% to 30% of the total surface area approximately 3 to 6 inches inside the normal "pruned surface". This interior clipping (20% to 30%) must be uniformly distributed over the entire shrub. This procedure must be performed as a part of the normal pruning operation (when new growth is removed). Evenly form and balance the shrub, bush, or plant in order to shape it according to its natural growth habits. "Box" or "circular" shaping is not acceptable, except with hedges. Hedges must be sheared or pruned, as appropriate, to maintain their established shape and appearance.
3. Remove dead, damaged, or diseased wood. If the entire shrub should die, remove the entire shrub to 6 inches below ground level. The hole and any other surface damage caused by removal must be filled with topsoil, fertilized, raked, and seeded.
4. Remove vines, tree sprouts or any other extraneous vegetative growth from under or on the shrubbery.
5. Prune or remove growth in front of windows, over entrance ways or walks, or where vision is obstructed at street intersections.
3.4.4 Cultivation and Mulching of Shrubs, Hedges, and Flower Beds Shrubs, hedges, and flower beds must be cultivated and mulched early spring (March to April), after the soil has thawed and late fall (October to early November) before the first hard frost. Ensure the mulch is applied after the soil has thawed in spring or after the first frost in fall. Aim for a layer of 2 to 3 inches, being careful not to pile it against plant stems or trunks. Cultivation includes weeding of shrubs, hedges, and flower beds. Cultivation must be extended a sufficient distance from bases of shrubs to ensure their protection from damage by lawn mowers, and trimmer/edgers, and to provide proper care for the plants, but in no case less than 18 inches. Removal of grass, weeds, rocks, and debris encountered during cultivation must be considered part of cultivation. All edges must be worked to a neat and true line. All timber, brick, concrete, aluminum, or plastic bed edging must be realigned as needed. Mulch in bed areas such as wood bark chips, pine straw, etc., must be well groomed after removal of weeds, rocks, etc.
Additional mulch, of the same type as existing, must be provided and placed around all shrubs and flower beds as required to maintain a minimum depth of three inches. Shrubbery without existing mulch must be mulched to a minimum depth of three inches.
3.4.5 Fertilization
Fertilizers must be used only if determined necessary by the COR, in order to minimize environmental impact. Synthetic chemical fertilizers must not be used. When fertilization is necessary as determined by the COR, fertilizer must be comprised of either recovered organic material or bio-based material.
Fertilizer comprised of recovered organic material must conform to the EPA’s Comprehensive Procurement Guidelines (http://www.epa.gov/cpg). Bio-based product listings are obtainable from the U.S. Department of Agriculture (USDA) (http://www.usda.gov). Fertilizer must be applied only when grass blades are free of moisture. Ground cover plants and shrubbery beds must be fertilized concurrently with lawn application, at the same rates. The Contractor's monthly work schedule must reflect planned fertilization dates.
3.4.6 Trash and Litter Collection and Disposal.
The Contractor must collect trash and litter in all grassed areas, plant and shrub beds, wooded areas, sidewalks, streets, and curbs in maintenance level I at the frequency specified; dispose it in the appropriate waste, recycling, or composting receptacles offsite. [see Section 3.2.3.2 for waste management requirements]. Trash and litter do not include natural vegetation, such as leaves, pine straw, and limbs. All trash and litter must be removed off the activity the same day as collected.
3.4.7 Graveled Area Weed Control
The Contractor must weed all graveled areas, including gravel walking paths in Maintenance Level I at the frequency specified in the Summary Table below.
3.5 Maintenance Level II (Preventive Landscaping)
The Contractor must provide scheduled maintenance designed to prevent issues, enhance plant health, and support landscape aesthetics. The Contractor must provide grounds maintenance services in maintenance level II at the times and frequencies specified in Attachment #1 the Summary Table below. Attachment #2 provides information on the size, location, and layout of the land parcels which make up maintenance areas.
3.5.1 Grass Cutting
All grassed areas located within this maintenance level must be cut to a uniform height between [INSERT HIEGHT] and [INSERT HEIGHT] 2 to 2.5 inches at the frequencies specified in Attachment #1 the Summary Table below. All other requirements for grass cutting and trimming are the same as for Maintenance Level I, as specified in paragraph 3.4.1.
3.5.2 Edging
All sidewalks, driveways, street edges, curbs, and shrubbery areas located within this maintenance level must be edged in accordance with the frequencies specified in Attachment #1 the Summary Table below.
All other requirements for edging are the same as for Maintenance Level I, as specified in paragraph 3.4.2.
3.5.3 Fertilization
The Contractor must furnish and uniformly apply fertilizer to all parcels within this maintenance level when determined necessary by the COR. Fertilizer must be applied at the frequency and during the periods specified in Attachment #1 the Summary Table below. All other requirements for fertilization are the same as for Maintenance Level I, as specified in paragraph 3.4.5.
3.5.4 Trash and Litter Collection and Disposal
The Contractor must collect and dispose of trash and litter in all grassed areas, plant and shrub beds, wooded areas, sidewalks, streets, and curbs in Maintenance Level II at the frequency specified in Attachment #1 the Summary Table below. Trash and litter do not include natural vegetation, such as leaves, pine straw, and limbs. All trash and litter must be removed from the activity the same day as collected.
3.6 Maintenance Level III (Corrective Landscaping)
More intensive landscaping tasks needed to address specific issues or restore areas after significant wear, damage, or neglect. All other requirements for grass cutting and trimming are the same as for maintenance level I, as specified in paragraph 3.4.1.
Examples: Replacing damaged plants, addressing erosion, soil amendments, repairing hardscaping, and reseeding bare areas.
Personnel: Requires skilled landscapers or technicians with specialized knowledge of plant repair, soil management, and landscape restoration.
Frequency: As needed; typically, less frequent but may arise due to damage from weather, disease, or high use.
Objective: To repair and restore affected areas, bringing them back to a healthy and functional state.
3.6.1 Grass Cutting
All other requirements for grass cutting and trimming are the same as for Maintenance Level I, as specified in paragraph 3.4.1.
3.6.2 Edging
All sidewalks, driveways, street edges, curbs, and shrubbery areas must be edged in accordance with the frequencies specified in Attachment #1 the Summary Table below. All other requirements for edging are the same as for Maintenance Level I, as specified in paragraph 3.4.2.
3.6.3 Fertilization
Fertilization needs to be tailored to specific plant needs and soil conditions as determined by the COR, in accordance with the guidelines set in paragraph 3.4.5.
3.7 Maintenance Level IV (Overhaul & Refurbishment Landscaping) In-depth landscape renovation or major upgrades to completely refresh or transform an area. The Contractor must cut all brush, weeds, grasses, and small trees less than three inches in diameter at ground level. All such materials will be cut to within four inches of ground level.
Examples: Full landscape redesign, replacing large sections of turf, replanting trees, renovating irrigation systems, and major soil amendments.
Personnel: Requires experienced landscape architects, specialized contractors, or skilled technicians.
Frequency: Rare, occurring every few years or based on a significant need for updates.
Objective: To revitalize the landscape, improve long-term sustainability, and incorporate new design elements or technologies.
3.7.1 Grass Cutting
All requirements for grass cutting and trimming are the same as for Maintenance Level I, as specified in paragraph 3.4.1.
3.7.2 Edging
All sidewalks, driveways, street edges, curbs, and shrubbery areas must be edged in accordance with the frequencies specified in Attachment #1. All other requirements for edging are the same as for Maintenance Level I, as specified in paragraph 3.4.2.
The Summary Table was cropped to remove Level 4.
3.8 Indefinite Quantity Work Items
All indefinite quantity work items will be ordered using SF 1442, as specified in the "ORDERING OF WORK" clause, Section G. Details of the work required will accompany the SF 1442, giving exact location and type work to be accomplished. The Contractor must be required to complete the required services within the timeframes specified.
3.8.1 Raking
Includes the raking and removal of leaves, pine straw and pinecones, limbs, and other debris from the raked area. All debris must be disposed of the activity the day of collection.
3.8.2 Tree Removal
Trees, their stumps, and above ground roots must be removed to a depth of six inches below normal ground elevation. All debris must be disposed of the activity the day of removal [see Section 3.2.3.2 for waste management requirements]. The stump hole and any other surface damage caused by removal must be filled with topsoil, fertilized, raked, and seeded.
3.8.3 Stump and Above Ground Root Removal
Stumps and above grounds roots must be removed to a depth of six inches below normal ground elevation. Stump removal operations must avoid unnecessary soil excavation and ground disruption. All debris must be disposed off the activity the day of removal. The stump hole and any other surface damage caused by removal must be filled with topsoil, fertilized, raked, and seeded.
3.8.4 Grassing
Bare and slightly eroded areas (areas which vary in size from l0 to l000 square feet and can be repaired with the placement of four inches or less of topsoil) must be filled with topsoil, raked, fertilized, seeded, and watered to establish a healthy grassed covering. Establishment must include providing the necessary care to firmly establish new grass growth. The Contractor must water and otherwise care for new grassed areas sufficiently to ensure proper development. Grassed areas which die or fail to develop noticeable growth for a period of one year after seeding must be re-grassed by the Contractor at no additional cost to the Government.
3.8.5 Erosion Control
Soil erosion damage exceeding the scope outlined in paragraph 3.8.4 must be repaired as follows: fill washed-out or bare areas (requiring less than five cubic yards of fill) with clean, well-draining sandy loam soil to within four inches of normal ground elevation, compacted to 85-90% of maximum density. Add a layer of nutrient-rich topsoil to reach normal ground elevation, then rake, fertilize with a balanced starter fertilizer, and seed with a native or erosion-control grass mix. Cover with straw, biodegradable matting, or another suitable erosion-reducing material, and water to establish a healthy grass cover. Repaired areas must be maintained until grass is firmly established. Any areas where grass dies, fails to grow, or re-erodes within one year must be re-treated and re-grassed by the Contractor at no additional cost to the Government.
3.8.6 Underbrushing
All brush, weeds, and small trees (three inches and below in diameter at ground level) must be cut back to within one inch of ground level, removed from the site, and disposed off the activity. Any material to be saved will be marked by the COR prior to starting work. Any debris (i.e., limbs, dead trees, trash, etc.)
found in the underbrushing area must be removed from the site and disposed off the activity.
3.8.7 Tree Pruning
Trees must be pruned according to the following guidelines to selectively remove unwanted growth and encourage desired development. All tree pruning must be conducted under the supervision of a qualified individual provided by the Contractor, who is trained and experienced in proper tree pruning techniques.
Verification of this training and experience must be acceptable to the COR prior to the initiation of any pruning activities.
Before starting work, the Contractor must propose a pruning plan for each tree, which requires COR approval. Trees should be pruned in accordance with their natural growth habit to maintain a balanced form, promote health and growth, respond to damage from natural or human causes, and prevent interference with pedestrian and vehicular traffic. All clippings and debris must be removed and disposed of on the same working day as the pruning activity.
Clearance: Maintain a ten (10) foot clearance for all branches overhanging walkways and fence lines, and a fourteen (14) foot clearance for branches extending beyond the curb line into the paved section of roadways. Prune trees as necessary to ensure access, safe visibility for vehicles and pedestrians, and to prevent or eliminate hazardous situations.
Pruning must be accomplished in a manner to:
1. Remove dead, damaged, or diseased wood, or structurally weak limbs that may cause a safety hazard or unsightly appearance, including the removal of dead palm fronds.
2. Remove branches that extend over buildings and endanger roofs, eaves, and windows, or hang within eight feet vertically of sidewalks, parking lots, and driveways (10) ten-foot clearance vertically for sidewalks, (14) fourteen-foot clearance for parking lots and driveways.
3. Provide clearance for buses, moving vans, and similar vehicles along streets.
4. Cut back branches that overhang or grow into powerlines. Anticipate the effects of wind on branches which might fall on powerlines. Shape the entire tree rather than notch the top.
5. Remove growth of small trees in front of windows, over entrance ways or walks, and those which will obstruct vision at street intersections.
6. Remove sprouts which grow from the trunk. Remove sprouts to the height of the first major lateral limb.
7. Branch stubs must not be allowed. All branches must be pruned (removed) back to the next major limb or the tree trunk. Pruning cuts must be performed in a manner which leaves the branch collar exposed (with no stub beyond the branch collar).
3.8.8 Irrigation
Irrigation involves the artificial application of water to promote proper health, growth, color, and appearance of cultivated vegetation. Contractor must be WaterSense certified, and provide WaterSense certification to COR, prior to contract award. Grassed areas, shrubs, trees, and ground cover plants must be irrigated in accordance with the following directions. Only the ARTCC has an irrigation system. The ATCT and TRACON do not have irrigation systems.
1. Care must be exercised by regulating time and equipment to prevent wasting of water. Watering must be accomplished in a manner that avoids erosion, run-off, or ponding due to excessive quantities or rate of application. The minimum amount of water to be applied to all lawns, and planted areas must be one inch of water per application. Irrigation operations must be completed by 3:00 PM 6:00 AM daily.
2. The Contractor must be held responsible for any damage to plants, lawns, or buildings caused by careless handling of irrigation equipment. Sprinklers must not be set in such a position as to throw water into doorways, windows, porches, parked cars, parking areas, or to impede vehicular and/or pedestrian traffic.
3. Water will be furnished by the Government from the most convenient existing source of water. If a fire hydrant must be used for watering, clearance must be obtained from the COR before use.
All other required supplies must be furnished by the Contractor, except that Government owned and permanently installed sprinkler systems may be used where available. Where such installed sprinkler system equipment does not cover the area adequately, the Contractor must provide hoses and sprinklers to irrigate the entire area uniformly.
a. Sprinkler riser connections and sprinkler heads must be maintained, repaired, or replaced by the Contractor as necessary to eliminate obstructions, leaks, and other defects which would prevent proper operation, at no additional cost to the Government. Sprinkler heads must be maintained clear of dirt and other debris for approximately one inch around their outside circumference.
b. The Government will provide all other required maintenance to installed sprinkler systems due to normal wear and tear, to include time clocks, valve systems, and underground piping up to, but not including the sprinkler riser connection and sprinkler heads. Any damage to such systems caused by the Contractor must be repaired or replaced by the Contractor at no expense to the Government. The Contractor must promptly report damage to or malfunction of any sprinkler system to the COR.
4. Hoses, portable sprinklers, portable pipe, and similar irrigation equipment must be removed from lawn areas at the end of each workday or when not actually in use. All valves, covers, and valve box covers must be kept closed at all times except when in actual use.
5. The Contractor must abide by any local, state, or other water agency regulations or controls in force at the time of this contract.
6. For reimbursement purposes, irrigation must be ordered as follows:
a. Government System Application. When irrigation is ordered in an area covered by a government owned, permanently installed sprinkler system, the Contractor must be required to turn on or otherwise open and close valves as necessary to uniformly apply water to the area. One inch of water must be applied unless a specific application time is specified by the COR. As stated previously, in areas where the installed sprinkler system does not cover the area adequately, the Contractor must provide hoses and sprinklers to irrigate the entire area uniformly at no additional cost.
b. Contractor System Application. When irrigation is ordered in an area within 100 feet of a government-provided water source, the Contractor must provide hoses, sprinklers, and/or other necessary equipment to irrigate the entire area uniformly. One inch of water must be applied unless a specific application time is specified by the COR.
c. Site-Specific Application. When irrigation is ordered for a point of application (such as an individual tree or shrub) within 50 feet of a government-provided water source, the Contractor must provide hoses and/or other equipment as required to deliver 5-10 gallons per site, as specified by the COR.
d. Distant Site Application. When irrigation is ordered for a point of application (such as an individual tree or shrub) more than 100 feet from a government-provided water source, the Contractor must transport water and equipment to supply at least 20 gallons per specified site. The Government will furnish water from designated outlets, as specified by the COR.
7. Every year at the end of the normal growing season, the sprinkler system must be winterized. The system will be blown out with air by a qualified irrigation system technician. At the start of the growing season the sprinkler system must be pressurized with water and tested for leaks.
3.8.9 Ditch Cleaning
Vegetative growth in drainage ditches must be cut to a height of 6 to 12 inches on bottom and sides. All wood and brush cuttings, trash, and debris must be removed and disposed off the activity the same day of cleaning. Mouths of ditches, inlets, and outlets must be cleared of sediment, vegetation, and debris to allow unrestricted flow of water. Where ditch bottoms are paved, all mud and debris must be removed from the paved surface and disposed off the activity the same day of cleaning. Where ditch bottoms are not vegetated and have intermittent water flow, woody and aquatic vegetation must be removed or chemically treated. Approved herbicides for vegetation control will be permitted.
3.8.10 Tree and Shrub Establishment
Establishment must include providing necessary care to firmly establish the new plantings. All plants must be nursery grown and must bear certification indicating species, common name, and grade. Plants must be healthy, living specimens which are considered to be number one grade stock. Native plants and/or plants suited to the climate must be established, in order to minimize the need for irrigation and maintenance. Planting procedures must be in accordance with accepted nursery standards. The Contractor may invoice and payment will be made when initial planting is complete; however, the Contractor must water and otherwise care for new plants sufficiently to ensure proper development. All plants which die or fail to develop noticeable growth within one year of planting, must be replaced by plants of like size and type by the Contractor, at no additional cost to the Government.
3.8.11 Severe Shrub Pruning
Severe pruning of shrubs must consist of removal of all or a major portion of the total growth of the shrub. The extent of pruning will be indicated by the COR, but generally must consist of pruning large shrubbery to a level approximately one to three feet above ground level. Debris resulting from the pruning process must be disposed off the activity the same day of pruning.
3.8.12 Vegetation Removal
Vegetation removal must consist of the removal of grass, weeds, trees (less than three inches at ground level), and all other vegetative growth to ground or pavement level within 12 inches on both sides of fence lines. Mechanical methods of vegetation removal must be used. If mechanical methods are not feasible, chemical methods may be used with approval by the COR. If chemical methods are approved, the Contractor must submit Material Safety Data Sheets meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, as stated in paragraph 3.2.3., for any hazardous chemicals to be used.
Debris generated by vegetation removal operations must be removed and disposed of off the activity the same working day[see Section 3.2.3.2 for waste management requirements].
3.8.13 Sodding
Sod must be dense, uniform, weed free, be certified to be free of disease, insects, and nematodes, have minimum thatch, and good sod strength. Strength will be assessed by lifting a piece by one end with no tearing and little stretching. It must have been mowed to a height of one to two inches within 24 hours of lifting. It must have soil depth of 0.5 to l.25 inches. Sod must not be allowed to become dry and when stacked it must not be allowed to heat up above l00 degrees F. Soil must be moist just prior to laying sod on well graded surface free of vegetation and properly prepared for accepting the sod. Sod blocks must be placed in rows butting each piece firmly against the last. Joints in successive rows must be staggered.
Slopes must be sodded by beginning at the bottom and laying sod in rows across the slope. Sod on slopes steeper than 2:1 must be held in place with wooden pegs. Immediately following placing, the sod must be rolled to provide firm contact with soil. Cracks must be filled with topsoil. As soon as this process is complete, sodded area must be irrigated by uniform application of one-half inch of water. No more than 60 minutes should elapse from the time sod is placed until it has been irrigated. The Contractor must provide the necessary care to firmly establish new grass growth and must water and otherwise care for sodded areas sufficiently to ensure proper development. All grass which dies or fails to develop noticeable growth within one year of sodding must be replaced by the Contractor at no additional cost to the Government.
3.8.14 Sprigging
Sprigs must be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots of Bermuda grass or Zoysia grass. Sprigs must be obtained from approved sources where the sod is heavy and thickly matted, and free from ground pearl and fairy rings.
Sprigs must be free of nut grass (cyperus rotundus), Johnson grass (sorghum halepense), and other objectionable weeds, and must not contain material which might be detrimental to the development of the turf. Sprigs must be planted within 48 hours of harvesting. In addition, sprigs must not be left unprotected in the sun for longer than l5 minutes. Sprigs must be planted in l00 linear inches of sprigs per square yard on well graded surface free of vegetation and properly prepared for accepting the sprigs.
Distribution must be sufficiently uniform to ensure that the maximum spacing of sprigs must not exceed l2 inches. Immediately after opening furrows, sprigs must be placed and covered to a depth of approximately 2 1/2 inches after compaction, leaving a portion of each sprig protruding above the soil level. The furrows must be filled in such a manner that the surface is left even at the designated grade and compacted with a roller weighing 60 to 90 pounds per linear foot of roller. Sprigged area must then be watered not later than 30 minutes after sprigging has been completed. At least 1/2 inch of water must be applied over the area sprigged in a manner which will prevent erosion due to the application of excessive quantities in a concentrated area, and with watering equipment that will not damage the finished surface.
The Contractor must provide the necessary care to firmly establish new grass growth and must water and otherwise care for sprigged areas sufficiently to ensure proper development. All grass which dies or fails to develop noticeable growth within one year of sprigging must be replaced by the Contractor at no additional cost to the Government.
4.0 Government Furnished Property and Service
4.1 Government Furnished Facilities
(1) The Government will not provide office space operational facilities or lay down areas to the Contractor. The Contractor must secure and maintain the necessary office space, facilities, and equipment storage areas required for…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .