This document is a Request for Proposal (RFP) issued by the Federal Aviation Administration (FAA) for a Tile Abatement & Carpeting Project at the Elko (EKO) Remote Control Air/Control Communication Facility (RCAG) in Elko, Nevada. The FAA requires a contractor to provide all labor, tools, equipment, materials, transportation, cleanup, and supervision for this project. The period of performance is projected to begin within 5 days of the Notice to Proceed and be completed within 14 days. This requirement will be set aside and awarded to a small business within specific socioeconomic categories. A site visit is strongly encouraged on June 24, 2024, and proposals are due by July 8, 2024. The contract will be awarded as a firm-fixed price contract. Questions and answers will be published on the SAM.gov website.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
SHEET INDEX
G001 COVER SHEET AND SHEET INDEX
G002 GENERAL NOTES AND SITE PLAN
EKO RCAG
REPLACE ACM FLOORING TILES PROJECT
ELKO, NV
JCN: 806522
SITE DATA:
LATITUDE: 40°53'39.9" N (40.894417)
LONGITUDE: 115°37'48.8" W (115.630222)
ELEVATION: 2285 M
NOT TO SCALE
VICINITY MAP
IS
SU
ED
F
O R
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
03/12/2024
CALEB SMITH
OPERATIONS MANAGER, AJW-2W15D
XXX
ELKO
XEKO-RCAG-806522-G001HANSON NGUYEN
HANSON NGUYEN
EKO RCAG
REPLACE ACM FLOORING TILES PROJECT
COVER SHEET AND SHEET INDEX
fil e.
dw g
SN
AJW-2W15D
TECH. OPS.
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA DES MOINES, WA
0%
D
ES
IG
N
THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM
HANSON NGUYEN
PROJECT ENGINEER, AJW-2W15D
806522
NV
EKO RCAG
ELKO MOUNTAIN
HUMBO
LD
T
RIV
ER
RYNDON
OSINO
ELKO
ELKO REGIONAL AIRPORT
D001 DEMOLITION PLAN
C001 CONSTRUCTION PLAN
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
GENERAL NOTES:
1. THE EKO RCAG IS AN ACTIVE OPERATIONAL FACILITY WHICH RUNS 24 HOURS A DAY, 7 DAYS
A WEEK. ANY OUTAGES NEEDED TO PERFORM WORK SHALL BE SCHEDULED WITH THE FAA
AT LEAST 72 HOURS IN ADVANCE. ALL LONG-TERM SHUTDOWNS MUST BE COORDINATED A
MINIMUM OF 30 DAYS IN ADVANCE.
2. ALL ITEMS INCLUDED ON THESE DRAWINGS AND SPECIFICATIONS SHALL BE INCLUDED IN
THE CONTRACTOR'S BID. ANY ITEMS THAT ARE UNCLEAR OR FOUND TO BE INCORRECT BY
THE SUBCONTRACTOR SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO
THE BID DUE DATE. EXCLUSIONS OF WORK FROM THE BID ARE NOT ACCEPTABLE.
3. CONTRACTOR TO COORDINATE WITH RESIDENT ENGINEER FOR ACCESS ON-SITE
4. IF INFORMATION INCLUDED IN DRAWING PACKAGE DIFFERS FROM SITE CONDITIONS, VERIFY
IN THE FIELD AND COORDINATE WITH PROJECT ENGINEER PRIOR TO DEMOLITION.
5. DRAWING PACKAGE IS INFORMATIONAL ONLY. FIELD VERIFY ALL DIMENSIONS.
6. LEAD-BASED PAINT AND/OR ASBESTOS IS CONFIRMED AT THE FOLLOWING LOCATIONS
RELATED TO SCOPE OF WORK: FLOOR TILES. CONTRACTOR/SUBCONTRACTOR SHALL
REVIEW ASBESTOS SURVEY PRIOR TO CONSTRUCTION.
7. NOT ALL EQUIPMENT ARE SHOWN CLEARLY.
8. EQUIPEMENT BOLTED TO THE GROUND SHALL REMAIN UNDISTRUBED FROM DEMOLITION
AND CONSTRUCTION.
IS
SU
ED
F
O R
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
02/22/2024
CALEB SMITH
OPERATIONS MANAGER, AJW-2W15D
XXX
ELKO
XEKO-RCAG-806522-G002HANSON NGUYEN
HANSON NGUYEN
EKO RCAG
REPLACE ACM FLOORING TILES PROJECT
GENERAL NOTES AND SITE PLAN
fil e.
dw g
SN
AJW-2W15D
TECH. OPS.
ATO -TECHNICAL OPERATIONS WESTERN SERVICE AREA DES MOINES, WA
0%
D
ES
IG
N
THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM
HANSON NGUYEN
PROJECT ENGINEER, AJW-2W15D
806522
NV
NOT TO SCALE
SITE PLAN
EKO RCAG
FUEL TANK
NON-FAA PROPERTY
NON FAA OWNED PROPERTY
GRAVEL
EKO RCLR TOWER
NON-FAA OWNED PROPERTY
ACCESS ROAD
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
SHEET NOTES:
1. THE CONTRACTOR SHALL PROTECT THE PREMISES AND EQUIPMENTS.
2. THE CONTRACTOR SHALL NOTE ANY EXISTING DAMAGE NOT WITHIN THE PROJECT SCOPE
PRIOR TO THE START OF ANY WORK.
3. SEE FACILITY HAZARDOUS MATERIALS REPORTS. IF ANY HAZARDOUS MATERIAL SUCH AS
ASBESTOS OR LEAD IS SUSPECTED OR FOUND, THE CONTRACTOR SHALL IMMEDIATELY
NOTIFY THE COR FOR WRITTEN DIRECTION BEFORE PROCEEDING.
4. THE CONTRACTOR SHALL CLEAN UP ALL DEMOLITION MATERIALS WHICH ARE DISLODGED/
GENERATED THROUGHOUT THE PROJECT.
5. FACILITY CARPET TILES AND ASSOCIATED MASTIC SHALL BE DEMOLISHED UP TO STANDING
OPERATIONAL EQUIPMENT. ALL FURNITURE/STORAGE CABINETS SHALL BE TEMPORARILY
RELOCATED TO COR APPROVED LOCATIONS. FLOORING MATERIAL PRESENT UNDERNEATH
EQUIPMENT CABINETS SHALL BE CLEANED WITH PROVISIONS TO PROTECT EQUIPMENT
FROM STATIC DISCHARGE/PHYSICAL DAMAGE/CHEMICAL CORROSION.
6. THE CONTRACTOR SHALL DISPOSE OF ALL DEMOLISHED EQUIPMENT AND MATERIALS,
FOLLOWING LOCAL, STATE, FEDERAL, AND FAA REQUIREMENTS, EXCEPT WHERE NOTED
OTHERWISE.
7. THE EKO RCAG IS AN ACTIVE OPERATIONAL FACILITY WHICH RUNS 24 HOURS A DAY, 7 DAYS
A WEEK. ANY OUTAGES NEEDED TO PERFORM WORK SHALL BE SCHEDULED WITH THE FAA
AT LEAST 72 HOURS IN ADVANCE. ALL LONG-TERM SHUTDOWNS MUST BE COORDINATED A
MINIMUM OF 30 DAYS IN ADVANCE.
8. ASBESTOS IS CONFIRMED AT THE FOLLOWING LOCATIONS RELATED TO SCOPE OF WORK:
FLOOR TILES AND WALL BASE COVE. CONTRACTOR/SUBCONTRACTOR SHALL REVIEW
ASBESTOS SURVEY PRIOR TO CONSTRUCTION.
DEMOLITION KEY NOTES:
ABATE AND DISPOSE EXISTING FLOOR TILE IN ALL ROOMS.
ABATE AND DISPOSE EXISTING COVE WALL BASE IN ALL ROOMS.
AREAS WHERE EQUIPMENT IS BOLTED TO THE GROUND SHALL REMAIN UNDISTURBED
DURING DEMOLITION.
TOILET SHALL BE DETACHED FROM EXISTING PLUMBING PRIOR TO DEMOLITION.
REINSTALL AFTER DEMOLITION.
DEMOLISH EXISTING FLOOR TILE
LEGEND:
SCALE 1"= 3'-0"
DEMOLITION PLAN
IS
SU
ED
F
O R
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
03/12/2024
CALEB SMITH
OPERATIONS MANAGER, AJW-2W15D
XXX
ELKO
XEKO-RCAG-806522-D001HANSON NGUYEN
HANSON NGUYEN
EKO RCAG
REPLACE ACM FLOORING TILES PROJECT
DEMOLITION PLAN
fil e.
dw g
SN
AJW-2W15D
TECH. OPS.
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA DES MOINES, WA
0%
D
ES
IG
N
THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM
HANSON NGUYEN
PROJECT ENGINEER, AJW-2W15D
806522
NV
EQUIPMENT ROOM
EQUIPMENT
RACK
EQUIPMENT
RACK
ENGINE-GENERATOR ROOM
RESTROOM
EMERGENCY QUARTERS
STORM PORCH
EQUIPMENT
ENGINE-GENERATOR
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
SCALE: 1" = 3'-0"
CONSTRUCTION PLAN
STORM PORCH
EQUIPMENT ROOM
ENGINE-GENERATOR ROOM
RESTROOM
CONSTRUCTION KEY NOTES:
INSTALL NEW CARPET TILE IN EMERGENCY QUARTERS AND EQUIPMENT ROOM.
INSTALL NEW FLOOR BASE AROUND THE PERIMETER OF ALL ROOMS.
INSTALL EPOXY COATING ON INSIDE ENGINE GENERATOR ROOM, RESTROOM, ENTRANCE OF
THE EXIT DOOR INSIDE THE EMERGENCY QUARTERS, AND STORM PORCH.
12'-8 15/16"
IS
SU
ED
F
O R
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
02/22/2024
CALEB SMITH
OPERATIONS MANAGER, AJW-2W15D
XXX
ELKO
XEKO-RCAG-806522-C001HANSON NGUYEN
HANSON NGUYEN
EKO RCAG
REPLACE ACM FLOORING TILES PROJECT
CONSTRUCTION PLAN
fil e.
dw g
SN
AJW-2W15D
TECH. OPS.
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA DES MOINES, WA
0%
D
ES
IG
N
THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM
HANSON NGUYEN
PROJECT ENGINEER, AJW-2W15D
806522
NV
EQUIPMENT
RACK
EQUIPMENT
RACK
EMERGENCY QUARTERS
11'-4"
10'-0"
3 2
3 EQUIPMENT
FLOORING SCHEDULE
ROOM FLOORING MATERIAL Wall Base
STORM PORCH EPOXY COATING PAINT COVE
ENGINE-GENERATOR EPOXY COATING PAINT STRAIGHT
EQUIPMENT ROOM CARPET TILE STRAIGHT
EMERGENCY QUARTERS CARPET TILE STRAIGHT
EMERGENCY QUARTER EXIT
DOOR
EPOXY COATING PAINT COVE
RESTROOM EPOXY COATING PAINT COVE
4'-0"
3'-0"
28'-0"
5'-5"
" 2
5'-9 15/16"
File details come from the government source that posted it. Updated .