About this file

This document is a Request for Proposal (RFP) issued by the Federal Aviation Administration (FAA) for a Tile Abatement & Carpeting Project at the Elko (EKO) Remote Control Air/Control Communication Facility (RCAG) in Elko, Nevada. The FAA requires a contractor to provide all labor, tools, equipment, materials, transportation, cleanup, and supervision for this project. The period of performance is projected to begin within 5 days of the Notice to Proceed and be completed within 14 days. This requirement will be set aside and awarded to a small business within specific socioeconomic categories. A site visit is strongly encouraged on June 24, 2024, and proposals are due by July 8, 2024. The contract will be awarded as a firm-fixed price contract. Questions and answers will be published on the SAM.gov website.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV DESCRIPTION JCN REDLINE

DATE APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY

H

G

F

E

D

C

B

A

8 1234567

DATE

DRAWING NO

DESIGNED

REVIEWED BY

$D

AT

E$ $T

IM

E$

$N

AM

E$

APPROVED

DATE

$F

IL

ES

8 234567

H

G

F

E

D

C

A

B

SHEET INDEX

G001 COVER SHEET AND SHEET INDEX

G002 GENERAL NOTES AND SITE PLAN

EKO RCAG

REPLACE ACM FLOORING TILES PROJECT

ELKO, NV

JCN: 806522

SITE DATA:

LATITUDE: 40°53'39.9" N (40.894417)

LONGITUDE: 115°37'48.8" W (115.630222)

ELEVATION: 2285 M

NOT TO SCALE

VICINITY MAP

IS

SU

ED

F

O R

ED

M

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

03/12/2024

CALEB SMITH

OPERATIONS MANAGER, AJW-2W15D

XXX

ELKO

XEKO-RCAG-806522-G001HANSON NGUYEN

HANSON NGUYEN

EKO RCAG

REPLACE ACM FLOORING TILES PROJECT

COVER SHEET AND SHEET INDEX

fil e.

dw g

SN

AJW-2W15D

TECH. OPS.

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA DES MOINES, WA

0%

D

ES

IG

N

THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM

HANSON NGUYEN

PROJECT ENGINEER, AJW-2W15D

806522

NV

EKO RCAG

ELKO MOUNTAIN

HUMBO

LD

T

RIV

ER

RYNDON

OSINO

ELKO

ELKO REGIONAL AIRPORT

D001 DEMOLITION PLAN

C001 CONSTRUCTION PLAN

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV DESCRIPTION JCN REDLINE

DATE APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY

H

G

F

E

D

C

B

A

8 1234567

DATE

DRAWING NO

DESIGNED

REVIEWED BY

$D

AT

E$ $T

IM

E$

$N

AM

E$

APPROVED

DATE

$F

IL

ES

8 234567

H

G

F

E

D

C

A

B

GENERAL NOTES:

1. THE EKO RCAG IS AN ACTIVE OPERATIONAL FACILITY WHICH RUNS 24 HOURS A DAY, 7 DAYS

A WEEK. ANY OUTAGES NEEDED TO PERFORM WORK SHALL BE SCHEDULED WITH THE FAA

AT LEAST 72 HOURS IN ADVANCE. ALL LONG-TERM SHUTDOWNS MUST BE COORDINATED A

MINIMUM OF 30 DAYS IN ADVANCE.

2. ALL ITEMS INCLUDED ON THESE DRAWINGS AND SPECIFICATIONS SHALL BE INCLUDED IN

THE CONTRACTOR'S BID. ANY ITEMS THAT ARE UNCLEAR OR FOUND TO BE INCORRECT BY

THE SUBCONTRACTOR SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO

THE BID DUE DATE. EXCLUSIONS OF WORK FROM THE BID ARE NOT ACCEPTABLE.

3. CONTRACTOR TO COORDINATE WITH RESIDENT ENGINEER FOR ACCESS ON-SITE

4. IF INFORMATION INCLUDED IN DRAWING PACKAGE DIFFERS FROM SITE CONDITIONS, VERIFY

IN THE FIELD AND COORDINATE WITH PROJECT ENGINEER PRIOR TO DEMOLITION.

5. DRAWING PACKAGE IS INFORMATIONAL ONLY. FIELD VERIFY ALL DIMENSIONS.

6. LEAD-BASED PAINT AND/OR ASBESTOS IS CONFIRMED AT THE FOLLOWING LOCATIONS

RELATED TO SCOPE OF WORK: FLOOR TILES. CONTRACTOR/SUBCONTRACTOR SHALL

REVIEW ASBESTOS SURVEY PRIOR TO CONSTRUCTION.

7. NOT ALL EQUIPMENT ARE SHOWN CLEARLY.

8. EQUIPEMENT BOLTED TO THE GROUND SHALL REMAIN UNDISTRUBED FROM DEMOLITION

AND CONSTRUCTION.

IS

SU

ED

F

O R

ED

M

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

02/22/2024

CALEB SMITH

OPERATIONS MANAGER, AJW-2W15D

XXX

ELKO

XEKO-RCAG-806522-G002HANSON NGUYEN

HANSON NGUYEN

EKO RCAG

REPLACE ACM FLOORING TILES PROJECT

GENERAL NOTES AND SITE PLAN

fil e.

dw g

SN

AJW-2W15D

TECH. OPS.

ATO -TECHNICAL OPERATIONS WESTERN SERVICE AREA DES MOINES, WA

0%

D

ES

IG

N

THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM

HANSON NGUYEN

PROJECT ENGINEER, AJW-2W15D

806522

NV

NOT TO SCALE

SITE PLAN

EKO RCAG

FUEL TANK

NON-FAA PROPERTY

NON FAA OWNED PROPERTY

GRAVEL

EKO RCLR TOWER

NON-FAA OWNED PROPERTY

ACCESS ROAD

REV DESCRIPTION JCN REDLINE

DATE APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY

H

G

F

E

D

C

B

A

8 1234567

DATE

DRAWING NO

DESIGNED

REVIEWED BY

$D

AT

E$ $T

IM

E$

$N

AM

E$

APPROVED

DATE

$F

IL

ES

8 234567

H

G

F

E

D

C

A

B

SHEET NOTES:

1. THE CONTRACTOR SHALL PROTECT THE PREMISES AND EQUIPMENTS.

2. THE CONTRACTOR SHALL NOTE ANY EXISTING DAMAGE NOT WITHIN THE PROJECT SCOPE

PRIOR TO THE START OF ANY WORK.

3. SEE FACILITY HAZARDOUS MATERIALS REPORTS. IF ANY HAZARDOUS MATERIAL SUCH AS

ASBESTOS OR LEAD IS SUSPECTED OR FOUND, THE CONTRACTOR SHALL IMMEDIATELY

NOTIFY THE COR FOR WRITTEN DIRECTION BEFORE PROCEEDING.

4. THE CONTRACTOR SHALL CLEAN UP ALL DEMOLITION MATERIALS WHICH ARE DISLODGED/

GENERATED THROUGHOUT THE PROJECT.

5. FACILITY CARPET TILES AND ASSOCIATED MASTIC SHALL BE DEMOLISHED UP TO STANDING

OPERATIONAL EQUIPMENT. ALL FURNITURE/STORAGE CABINETS SHALL BE TEMPORARILY

RELOCATED TO COR APPROVED LOCATIONS. FLOORING MATERIAL PRESENT UNDERNEATH

EQUIPMENT CABINETS SHALL BE CLEANED WITH PROVISIONS TO PROTECT EQUIPMENT

FROM STATIC DISCHARGE/PHYSICAL DAMAGE/CHEMICAL CORROSION.

6. THE CONTRACTOR SHALL DISPOSE OF ALL DEMOLISHED EQUIPMENT AND MATERIALS,

FOLLOWING LOCAL, STATE, FEDERAL, AND FAA REQUIREMENTS, EXCEPT WHERE NOTED

OTHERWISE.

7. THE EKO RCAG IS AN ACTIVE OPERATIONAL FACILITY WHICH RUNS 24 HOURS A DAY, 7 DAYS

A WEEK. ANY OUTAGES NEEDED TO PERFORM WORK SHALL BE SCHEDULED WITH THE FAA

AT LEAST 72 HOURS IN ADVANCE. ALL LONG-TERM SHUTDOWNS MUST BE COORDINATED A

MINIMUM OF 30 DAYS IN ADVANCE.

8. ASBESTOS IS CONFIRMED AT THE FOLLOWING LOCATIONS RELATED TO SCOPE OF WORK:

FLOOR TILES AND WALL BASE COVE. CONTRACTOR/SUBCONTRACTOR SHALL REVIEW

ASBESTOS SURVEY PRIOR TO CONSTRUCTION.

DEMOLITION KEY NOTES:

ABATE AND DISPOSE EXISTING FLOOR TILE IN ALL ROOMS.

ABATE AND DISPOSE EXISTING COVE WALL BASE IN ALL ROOMS.

AREAS WHERE EQUIPMENT IS BOLTED TO THE GROUND SHALL REMAIN UNDISTURBED

DURING DEMOLITION.

TOILET SHALL BE DETACHED FROM EXISTING PLUMBING PRIOR TO DEMOLITION.

REINSTALL AFTER DEMOLITION.

DEMOLISH EXISTING FLOOR TILE

LEGEND:

SCALE 1"= 3'-0"

DEMOLITION PLAN

IS

SU

ED

F

O R

ED

M

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

03/12/2024

CALEB SMITH

OPERATIONS MANAGER, AJW-2W15D

XXX

ELKO

XEKO-RCAG-806522-D001HANSON NGUYEN

HANSON NGUYEN

EKO RCAG

REPLACE ACM FLOORING TILES PROJECT

DEMOLITION PLAN

fil e.

dw g

SN

AJW-2W15D

TECH. OPS.

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA DES MOINES, WA

0%

D

ES

IG

N

THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM

HANSON NGUYEN

PROJECT ENGINEER, AJW-2W15D

806522

NV

EQUIPMENT ROOM

EQUIPMENT

RACK

EQUIPMENT

RACK

ENGINE-GENERATOR ROOM

RESTROOM

EMERGENCY QUARTERS

STORM PORCH

EQUIPMENT

ENGINE-GENERATOR

REV DESCRIPTION JCN REDLINE

DATE APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY

H

G

F

E

D

C

B

A

8 1234567

DATE

DRAWING NO

DESIGNED

REVIEWED BY

$D

AT

E$ $T

IM

E$

$N

AM

E$

APPROVED

DATE

$F

IL

ES

8 234567

H

G

F

E

D

C

A

B

SCALE: 1" = 3'-0"

CONSTRUCTION PLAN

STORM PORCH

EQUIPMENT ROOM

ENGINE-GENERATOR ROOM

RESTROOM

CONSTRUCTION KEY NOTES:

INSTALL NEW CARPET TILE IN EMERGENCY QUARTERS AND EQUIPMENT ROOM.

INSTALL NEW FLOOR BASE AROUND THE PERIMETER OF ALL ROOMS.

INSTALL EPOXY COATING ON INSIDE ENGINE GENERATOR ROOM, RESTROOM, ENTRANCE OF

THE EXIT DOOR INSIDE THE EMERGENCY QUARTERS, AND STORM PORCH.

12'-8 15/16"

IS

SU

ED

F

O R

ED

M

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

02/22/2024

CALEB SMITH

OPERATIONS MANAGER, AJW-2W15D

XXX

ELKO

XEKO-RCAG-806522-C001HANSON NGUYEN

HANSON NGUYEN

EKO RCAG

REPLACE ACM FLOORING TILES PROJECT

CONSTRUCTION PLAN

fil e.

dw g

SN

AJW-2W15D

TECH. OPS.

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA DES MOINES, WA

0%

D

ES

IG

N

THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM

HANSON NGUYEN

PROJECT ENGINEER, AJW-2W15D

806522

NV

EQUIPMENT

RACK

EQUIPMENT

RACK

EMERGENCY QUARTERS

11'-4"

10'-0"

3 2

3 EQUIPMENT

FLOORING SCHEDULE

ROOM FLOORING MATERIAL Wall Base

STORM PORCH EPOXY COATING PAINT COVE

ENGINE-GENERATOR EPOXY COATING PAINT STRAIGHT

EQUIPMENT ROOM CARPET TILE STRAIGHT

EMERGENCY QUARTERS CARPET TILE STRAIGHT

EMERGENCY QUARTER EXIT

DOOR

EPOXY COATING PAINT COVE

RESTROOM EPOXY COATING PAINT COVE

4'-0"

3'-0"

28'-0"

5'-5"

" 2

5'-9 15/16"

File details come from the government source that posted it. Updated .