QGV RFI Attachment 1.docx
DOCX document 23 KB Posted
- Attached to
- QGV ARSR Access Road Paving Federal contract opportunity
- Solicitation number
- 697DCK-24-R-00272
About this file
This document is an Attachment to a Request for Information (RFI) related to Solicitation Number 697DCK-24-R-00272 for the QGV ARSR Access Road Paving project at Fort Fisher, North Carolina. The project requires the removal and replacement of approximately 2,000 linear feet of asphalt access road, with a minimum 4-inch compacted asphalt thickness. The contractor will also be responsible for filling and leveling low spots and excavated areas below the existing asphalt layer. The solicitation is set-aside for small business concerns under NAICS code 237310 - Highway, Street, and Bridge Construction, with an estimated cost magnitude between $250,000 and $500,000. Proposals are due by May 16, 2024, at 3:00 PM EDT, and there is an optional site visit scheduled for May 2, 2024, at 10:00 AM. The Period of Performance is approximately 120 calendar days, and the contracting agency is the Federal Aviation Administration (FAA) Southwestern Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_697DCK-24-R-00272_Amd_0001.pdf | ||
| Sol_697DCK-24-R-00272_Amd_0002.pdf | ||
| 697DCK-24-R-00272 QGV ARSR Access Road Paving.pdf | ||
| SOW QGV ARSR Radar Site Replace and Refurbish Asphalt Access Road Project.pdf | ||
| Wage Determination - NC20240090 1-5-24.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 697DCK-24-R-00272 - QGV Paving Ft Fisher RFI’s
Please confirm we need to include 3" of asphalt in our proposal?
(SOW says minimum of 4” with 2” base course and 2” surface course) 2-INCHES
There are 2 small speed bumps upon entry, please confirm we need to include a price to replace. (Can you verify they exist/need replaced) The two (2) small speed bumps upon entry should be replaced and painted yellow. Please include a price to replace and paint.
-Who is responsible for costs of bad spots under asphalt? As they are not visible until the old road is demolished.
(covered by SOW) The contractor shall mill or saw cut, remove and replace the existing asphalt access road (Davis Rd.) down to the base. It encompasses the area that includes the asphalt access drive from Davis Road to the facility’s entrance drive. It is an approximate 2,000-foot section of the Davis Road from the beginning of the secondary access road from the QGV ARSR radar site to the intersection of Marquesa Way (refer to Figures 1 to 5). For supplemental construction information or requirements refer to attached aerial photographs, and drawings, along with the associated construction details and notes related to the work to be performed. The new asphalt to be installed shall be a minimum 4” thick (compacted) contractor shall field verify conditions, dimension and quantities. The existing conditions or asphalt thickness may require the contractor to excavate some base material in order to ensure final elevation matches the existing ground surface and ensure minimum 2% slope.
Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?
No, can be the same person
Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?
Technically Yes. However, the Period of Performance will start when the contractor receives a Notice to Proceed not at contract award.
Are soil boring reports available? If not, it will be assumed that excavation will be clear of rocks and obstructions.
No soil boring available, assumed based on shallow depth, no big rocks or obstructions.