Attachment 04 - Standardized Proposal Breakdown.xls
XLS spreadsheet 45 KB Posted
- Attached to
- BIL-Funded Elevator Modernization and Preventive Service at the Camarillo Air Traffic Control Tower
- Solicitation number
- 697DCK-24-R-00086
About this file
This standardized proposal breakdown template is to be used for proposals submitted in response to the solicitation for the elevator modernization and preventive service contract at the Camarillo Air Traffic Control Tower. Vendors should enter component costs into the white cells to calculate total prices for the modernization requirements, construction and installation, after hours work, and annual maintenance fees. Modernization efforts will involve upgrades to electronics and controls, electrical systems, mechanical components, safety equipment, and the cab interior. Construction includes mobilization, removal and demolition, installation, and permit acquisition. Preventive maintenance services will be provided on a monthly basis with additional fees for non-routine maintenance monitoring. Proposals should include a technical description of the modernization effort along with a completed cost breakdown template.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modernization
| Standardized Proposal Breakdown | DATE PREPARED: MMM DD - YYYY | |||
| PROJECT: | ||||
| VENDOR: | ||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | |||
| ITEM | EQUIPMENT COSTS - $ | LABOR COSTS - $ | OTHER COSTS - $ | TOTAL ITEM COST - $ |
| TOTAL | TOTAL | TOTAL | ||
| Modernization Requirements: | ||||
| Electronics/Controls/Software | thiat | $ - 0 | $ - 0 | |
| Electrical | $ - 0 | $ - 0 | $ - 0 | |
| Mechanical/Drives/Sheaves/Traveling Cable | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Cab Interior/Finishes | $ - 0 | $ - 0 | $ - 0 | |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | |
| Construction/Install: | ||||
| Mobilization/Demobilization | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Removal/Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Installation | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Permits | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| After Hours Variance: | ||||
| Modernization/Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| MODERNIZATION TOTAL | $ - 0 | |||
| Performance Maintenance: | ||||
| Maintenance Fee (monthly) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Maintenance Monitoring (as required) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| MAINTENANCE TOTAL (Annual) Base Year | $ - 0 | |||
| Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown. |