SCOPE OF WORK.pdf

PDF 89 KB Posted

Attached to
Mineta San Jose International Airport (SJC) A&E Design - MARKET SURVEY
Solicitation number
697DCK-24-R-00024
Issued by

About this file

This scope of work document outlines requirements for architectural and engineering design services. The Federal Aviation Administration intends to replace the existing airport traffic control tower and base building facility at Mineta San Jose International Airport. The selected firm will be responsible for designing and preparing bid documents for new remote transmitter/receiver towers and the airport traffic control tower and base building. Work will include engineering studies, preliminary and final designs, bidding documents, structural analysis, site surveying, pavement designs, master planning, and construction support. The design must comply with high performance sustainable building requirements and involve land surveying, geotechnical investigation, soil analysis, security design, and wind tunnel testing. Additional services may include facility management, contract administration, project management support, cost estimating, specification writing, and interior design. Construction support such as shop drawing review and site inspection will be included as a contract line item for award with the start of construction.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.0 SCOPE OF WORK

The Federal Aviation Administration (FAA) intends to replace the existing Airport Traffic Control Tower (ATCT) and base building facility at the Mineta San Jose International Airport (SJC) in San Jose, California. As a result, the existing Remote Transmitter/Receiver towers (RTR) and corresponding facilities have to be relocated prior to the construction of the new ATCT and base building. ATCT facilities are considered essential facilities by the International Building Code (IBC) (Risk Category IV) and American Society of Civil Engineers (ASCE) (Operational 1-A).

The FAA intends to contract an Architectural/Engineering (A/E) firm to design and prepare bid documents for both the new RTR and the new ATCT and Base Building. Work type includes, but is not limited to, engineering studies and preliminary designs, final designs and bidding documents, structural analysis, site surveying, pavement designs, master planning, and construction support. The work requires the A/E to have specific areas of expertise. These areas include, but are not limited to, civil, architectural, structural, mechanical, plumbing, fire protection, electrical, and electronics engineering disciplines as well as geotechnical, blast resistance, progressive collapse, surveying, etc. This Scope of Work (SOW) requires High Performance Sustainable Building (HPSB) design compliance, land surveying, geotechnical subsurface investigation, soil analysis, security design, and wind tunnel testing. The work may also include facility management and contract administration support, including, but not limited to, project management support, critical path method (CPM) preparation and analysis, drafters, cost estimators, specification writers, interior designers, and administrative personnel.

Construction support is considered in the scope of this project but will not be awarded until the start of construction. The construction support includes, but is not limited to shop drawing review, site inspection, and construction management. Construction support will be listed as a contract line item number (CLIN) on the award document.

1.0 SCOPE OF WORK