This solicitation requests proposals for an HVAC replacement project at the Seattle Air Route Surveillance Radar facility. The Federal Aviation Administration seeks to award a firm fixed price contract to replace all HVAC equipment and associated ductwork. The project is set aside for small businesses with a NAICS code of 238220 and an estimated cost between $200,000 and $300,000. The period of performance is 120 calendar days. Questions are due by August 16 and proposals by August 23. A site visit is scheduled for August 12. The contractor must be registered in the System for Award Management. Accompanying documents include drawings of the electrical system and equipment schedules.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 21. SF 30 - Amendment of Solicitation - SEA HVAC replacement.pdf | ||
| 16. SIR - 697DCK-21-R-00294 & attch v2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB Control No. 2120-0595 (SF-30) FAA Template No. 11 (Reverse) (8/97)
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 6
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
A-0002 08/19/2021 WS-21-01371
6. ISSUED BY 7. ADMINISTRATED BY (If other than Item 6)
DOT/FEDERAL AVIATION ADMINISTRATION
SOUTHERN REGION, AAQ-570
1701 COLUMBIA AVENUE
COLLEGE PARK, GA 30337
DOT/FEDERAL AVIATION ADMINISTRATION
SOUTHERN REGION, AAQ-570
1701 COLUMBIA AVENUE
COLLEGE PARK, GA 30337
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
All Prospective Offerors.
9A. AMENDMENT OF SOLICITATION NO.
697DCK-21-R-00294
9B. DATED (SEE ITEM 11)
07/20/2021
10A. MODIFICATION OF CONTRACT/ORDER NO.
*TO BE COMPLETED BY VENDOR IF NOT COMPLETE 10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation on as amended, by one of the following methods:
(a) By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO.
AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Reference: 697DCK-21-R-00294 – Amendment –A – 0002 – HVAC Replacement, Seattle, WA.
This amendment is being issued to answer the RFIs related to this project. Also, the bid due date has been extended to Monday, August 23, 2021 @ 3:00pm Eastern Daylight Time (EDT).
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING SPECIALIST(Type or print)
James E. Love 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign)
BY
(Signature of Contracting Specialist) 8/19/2021
U.S. Department of Transportation Federal Aviation Administration
RFI’S: Solicitation 697DCK-21-R-00294 – SEA ARSR HVAC Replacement, Seattle, WA
1. Would it be possible to get a print of the building that actually provides building measurements? Such as length width, etc.
a. Please see attached drawing that is scaled.
2. With regards to the temporary a/c units: Are two 15 ton each temp units required?
a. Contractor shall provide temporary HVAC units to support the whole facility. All of the ductwork will be replaced during this project, so two 15 ton temporary units does not appear to be a feasible plan.
3. Is all of the ductwork, inside and outside, to be replaced? (At Clearfield not all of the ductwork was replaced, if I remember correctly.) This is why a drwg with building dimensions will be most helpful.
a. Yes, all ductwork shall be replaced during this project. Please see attached drawing.
4. Are all of the ceiling tiles, in the entire facility, to be replaced?
a. Yes, all of the ceiling tiles throughout the facility shall be replaced during this project.
Electrical -
1. Will there be a permitting/city inspection of the a is condition prior to upgrade.
Initial inspection appeared to have more breakers/amps in the box than it is labeled to support. This potentially will require more electrical work than outlined. Jsutin was attempting to find the AS IS of the electrical.
a. Permitting/city inspection is not required. FAA is the agency having jurisdiction for this site. Panel is sized correctly due to various pieces of equipment being redundant and will never operate at the same time. Also, some equipment currently being supplied with power from this panel will be eliminated during this project. Please see attached electrical drawings for the site.
2. There was a supporting electrical panel that we did not find that was part of the circuit and it may have been absorbing the difference. Was that box found and is there and AS IS for it.
a. The mentioned box was found and is located in the E/G room. Please see attached electrical drawings.
3. Lead times are being quoted 18-24 weeks and 30 weeks for the various system elements specified. The lead times are potentially longer than the project period. How will equipment lead times and delivery lead times be addressed when longer the period to execute the work?
a. The FAA understands issues with current lead times for material/equipment.
Request Contractor to provide anticipated lead times with their bid and the contract performance period can be adjusted to reflect current circumstances.
4. Where is Electrical Panel F fed from
A: Panel F is fed from the transfer switch through a fused disconnect. See attached electrical drawing.
5. Can you provide a drawing of the existing site and identify what items are being demolished and removed.
A: See attached mechanical drawing. All of the existing HVAC equipment and associated ductwork is to be removed by the Contractor.
400 AMP ATS/BIS
N
TVSS
F
PANEL
E/G
B
PANEL PANEL TVSS
EE/G
PANEL
C10 A10,B10, C40,N60 A40,B40, C50,N50 A50,B50, BP
BN
PANEL MDP-E
CD
PANEL
2A
TVSSPANEL
MLO
C
50A
PANEL
TVSS
TVSS
PANEL "MCP"
PANEL "MDP-C"
MLO
125A
ANCILLARY
PANEL
MLO
125A
ATCBI-6
PANEL
MLO
250A
CARSR
PANEL
AT 150 AMPS
200A - 3P FUSED
DISCONNECT SWITCH
PANEL F FUSED
DISCONNECT SWITCH
4-POLE, 3-POSITION
400 AMP HD NEMA 3R
3 POLE, FUSED AT 400A
SWITCH, 120/208V, 3 PHASE
400A MAIN SERVICE DISCONNECT
JUNCTION BOX
36"x36"x12" NEMA 3R
SEATTLE CITY LIGHT
NORMAL POWER FROM
120/208V, 3-PHASE, 60 HZ
100 KW E/G
COMBINATION STARTER
HEAT EXCHANGER
LOAD BANK
100 KW
208V,3PH,3W
100KVA,80KW,
UPS
PANEL
BYPASS
MAINTENANCE
UPS
400A 400A
100A 100A 100A 250A 250A 250A
400A
METER AND C.T.'s
400A
20A 20A 125A20A 30A 30A 150A 20A 100A 40A70A 100A 70A
30A
125A 125A 20A100A 40A 125A
400A
SW1
450A
350A
A
SW3
SW2
E D
M
I S
S U
E D
F O
R
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
WA
MEK
JBB
RCS 07/20/2018
A
JC07/20/2018A
3 PHASE, 4 WIRE; Z=1.9%
150 KVA, 26.4 KV-120/208V,
POLE MOUNTED XFMR
(1)-#1/0 GND
(4)-500 MCM
8" WIREWAY
PENETRATION
WALL
1/0 AWG
(1)-1/0
(1)-1/0 GND
(4)-500 MCM
3-1/2" CND
125A125A30A20A
RMC SPARE ERMS
S P
A R
E
S P
A R
E
S P
A R
E
S P
A R
E
S P
A R
E
SPARE SPARE SPARE SPARE SPARE
2B
PANEL
MLO
A N
T E
N N
A
P A
N E
L
ENGINEERING SERVICES
INFRASTRUCTURE
ARSR
ELECTRICAL ONE-LINE DIAGRAM
FACILITY DRAWINGS
FORT LAWTONSEATTLE
PROJECT ENGINEER
NDP
SEA-D-ARSR-E020
NDPAS-BUILT FOR FACILITY DRAWINGS
s e a d a r s r e .d g n
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
A S
-B U
IL
T
S
M
ARGORP ESNEF
E
D
M E
T S
Y
S
ECAPSRIA LA
N
OI
T
A N
SPARE
NDP RESOURCES MANAGER
07/30/2019
F
IL
E
S
D
A T
E
T
IM
E
N
A M
E
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
PANELBOARD:
CKT ACCESSORIES CKTACCESSORIES
25 26
27 28
29 30
AMP/PH AMP/PH
SOURCE:
20A
20A
20A
20A
20A
20A
20A
20A
20A
20A
20A
B 120/208 VOLT 3 PHASE
20A
20A
20A
20A
20A
60A
E/G RM LIGHTS & OUTLETS
20A
20A
20A
20A
20A
20A
20A
SPARE
20A SPARE
CKT
CKT ACCESSORIES
ACCESSORIESAMP AMP
BLANK
31 32
33 34
35 36
37 38
39 40
41 42
SPARE
SPARE
BLANK
SPARE
SPARE
TVSS
SPARE
BLANK
BLANK
SPARE
BLANK
BLANK
UPS RECTIFIER
UPS STATIC BYPASS
PANEL E/G
PANEL B
SPARE
125A
125A
400A
400A MAINTENANCE BYPASS SWITCH
PANEL E
SPARE
BLANK
400A
125A
MDP-EDATE: 11/14/2013
20A
20A
20A
20A
20A
40A
20A
30A
20A
S. WALL LIGHTS
CTR LIGHTS
N. CTR LIGHTS
SPARE
2#EMG FAN
S. WALL OUTLETS & F/A
SHOP OUTLETS
1#N. EGM RM FAN
2#EMG FAN
3#EMG FAN
20A
20A
20A
20A
20A
20A
20A
SPARE
TOWER STAIR & E/G RM LIGHTS
ANTENNA PANEL
ACE ESSENTIAL
SPARE
SPARE
APU ESSENTIAL
SPARE
SPARE
20A
20A
WATER HEATER20A
20A
20A
PORCH LIGHT20A
20A
E. RM LIGHTS
RESTROOM LIGHTS & OUTLETS
1#EMG FAN
W. EMG LIGHTS & OUTLETS
TOWER STAIRS LIGHTS & SINK OUTLETS
SPARE
E/G RM OUTLETS
E/G RM & STORAGE SHED OUTLETS
BACK TOWER LIGHTS
S. FLOOD LIGHTS
NW OUTLETS 208V
S. E/G RM FAN
E/G RM FAN
SPARE
CCTV SECURITY
PANELBOARD:
CKT ACCESSORIES CKTACCESSORIES
25 26
27 28
29 30
AMP/PH AMP/PH
SOURCE:
120/240 VOLT 3 PHASE
30A 20A
20A
20A
20A
20A
20A
20A
BLANK
E/G
MDPDATE:
20A
BLANK
SPARE
BLOCK HEATER
BATTERY CHARGER
CEILING HEATER
LOAD BANK CNTL
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
SPARE
20A
OUTLET
SPARE
DAY TANK CONTROL
E/G FAN EAST WALL
PANELBOARD:
CKT ACCESSORIES CKTACCESSORIES
AMP/PH AMP/PH
SOURCE:
120/240 VOLT 3 PHASE
60A
40A
SPACE
ANTENNA
MAIN
20A
20A SPACE
DATE: PANEL B
SPARE 20A
120V CONV. OUTLET
ROTORY JOINT HEATER
CNTL BOX LIGHT & RECEPT.
30A
SPACE
SPACE
SPACE
RECEPTACLE
HOIST
3P 208V
SPACE
PANELBOARD:
CKT ACCESSORIES CKTACCESSORIES
25 26
27 28
29 30
AMP/PH AMP/PH
SOURCE:
120/240 VOLT 3 PHASE
20A
20A
20A
30A
20A
20A
20A
20A
20A
20A
20A
E
DATE: 01/11/1996
WK RM OUTLETS
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
MDP-E
20A
20A
20A
20A
20A
20A
20A
20A
220V OUTLET BRK RM
220V OUTLET WK SHOP
FENCE ALARM/BRK RM LIGHTS
N. RCAG TOWER LIGHTS
WK RM OUTLETS
S. RCAG TOWER LIGHTS
CD ROOM OUTLETS
DOORBELL
20A
20A
20A
20A
SPARE
CD RM LIGHTS WEST ROW
CD RM NE LIGHTS
CE RM NW LIGHTS
WORKSHOP RM LIGHTS
WORKSHOP PORCH LIGHT
CONV. OUTLET HF 360 RADIO
4X STUB-IN BOX
MAIN
20A
100A
PANELBOARD:
CKT ACCESSORIES CKTACCESSORIES
25 26
27 28
29 30
AMP/PH AMP/PH
SOURCE:
120/240 VOLT 3 PHASE
20A
20A
20A
20A
20A
20A
20A
20A
2B
DATE: 10/06/1991
BLANK
SPARE
SPARE
SPARE
20A
20A
20A
20A
20A
20A
20A
20A
100A
TELCO ONLY SW WALL O/L
20A
PANELBOARD:
CKT ACCESSORIES CKTACCESSORIES
25 26
27 28
29 30
AMP/PH AMP/PH
SOURCE:
120/240 VOLT 3 PHASE
20A
20A
100A
60A
20A
50A
20A
F
DATE: 08/22/2001
20A
50A
100A
50A
E
20A
OUTLETS NE & NW
OUTLETS NE ATSS OFFICE
HEATER OUTLET NE
ATSS OFFICE SOUTH
SPARE
SPARE
SPARE
SPARE
BLANK
BLANK
MAIN
20A
TELCO ONLY RCAG SW WALL
TEST CART (MOBILE)
OFFICE BASEBOARD HEATER
SPARE
SPARE
SPARE
SPARE
BLANK
BLANK
BLANK
DISCONNECT SW
2#CONDENSING UNIT
1#CONDENSING UNIT
SPARE
FIRE DAMPERS
3#AIR CONDITIONER
TOWER CRANE OUTLET GFI
AH-1
SPARE 2 POLE
RMMS CONTROL BOX/ACWL
AH-2
CONTROL PANEL HVAC
E D
M
I S
S U
E D
F O
R
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
$W
ATERMARK$
WA
MEK
JBB
RCS 07/20/2018
JC07/20/2018A
ENGINEERING SERVICES
INFRASTRUCTURE
ARSR
ESSENTIAL PANEL SCHEDULES
FACILITY DRAWINGS
FORT LAWTONSEATTLE
PROJECT ENGINEER
NDP
SEA-D-ARSR-E021
NDPAS-BUILT FOR FACILITY DRAWINGS
s e a d a r s r e
.d g n
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
A S
-B U
IL
T
S
M
ARGORP ESNEF
E
D
M E
T S
Y
S
ECAPSRIA LA
N
OI
T
A N
PANELBOARD:
SOURCE: ATSDATE: 07/16/2008
MDP-E
NDP RESOURCES MANAGER
07/30/2019
F
IL
E
S
D
A T
E
T
IM
E
N
A M
E
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
| 21. SF 30 - A-0002 - SEA HVAC replacement |
| RFI's - 697DCK-21-R-00294 |
| sea-d-arsr-e020 |
| sea-d-arsr-e021 |
| sea-d-arsr-m001 |
File details come from the government source that posted it. Updated .