Attachment 1-Statement of Work for LFT Tower lowering Project (pdf)

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK:

1. THE CONTRACTOR SHALL PERFORM ALL WORK AND SUPPLY ALL MATERIALS EXCLUDING

GFM ASSOCIATED WITH LOWERING RTR TOWERS LOCATED AT LAFAYETTE REGIONAL AIRPORT.

2. CAREFULLY REMOVE ANY GROUNDING AND MATERIALS CONNECTED TO THE TOP 20’ SECTIONS OF THE

THREE DESIGNATED TOWERS.

3. MATERIALS ARE TO BE REINSTALLED ONCE NEW 10’ SECTIONS ARE INSTALLED.

4. (ANY EXISTING TOWER MATERIALS DAMAGED DURING REMOVAL MUST BE REPLACED WITH SAME OR

FAA APPROVED SIMILAR PRODUCT AND REINSTALLED.)

5. CAREFULLY REMOVE POWER CONDUITS AND OB LIGHT. SAVE ALL PARTS FOR REINSTALLATION. ONCE

NEW 10’ TOWER SECTION IS INSTALLED, REINSTALL POWER CONDUIT AND OB LIGHT.

6. CAREFULLY REMOVE THE LADDER AND SAFETY RAIL SYSTEM CONNECTED TO THE TOP 20FT SECTION OF

THE TOWER. SAVE ALL PARTS FOR REINSTALLATION.

7. CAREFULLY REMOVE TOP 20’ SECTION OF THE THREE DESIGNATED TOWERS ONLY. DETACH EACH TOWER’S CROWS NEST FROM EACH TOWERS’ TOP SECTION. SAVE ALL PARTS FOR REINSTALLATION.

8. CARFULLY REMOVE LDF4-50a CABLES SECURE CABLES SO THEY ARE NOT DAMAGED. SAVE CLICKS AND ALL

PARTS TO BE REINSTALLED LATTER.

9. ONCE ALL MATERIALS ARE REMOVED FROM TOP 20’ SECTION OF ALL THREE TOWERS.

10. CARFULLY REMOVE EACH CROWS NEST AND THEN REMOVE THE 20’ SECTION OF THE THREE TOWERS.

11. SUPPLY AND INSTALL NEW 10’ SECTION OF TOWER WITH CROWS NEST. ONCE 10’ SECTION IS INSTALLED

ON TOWER REINSTALL TOWER LADDER AND SAFTEY RAIL SYSTEM.

12. INSTALL GROUNDING FOR RTR TOWER, AS PER FAA-19E STD. ONLY TO THE NEWLY INSTALLED SECTION

OF TOWER.

13. INSTALL NEW OB LIGHT SHEILD.FIELD FABRICATED SHEILD BY CUTTING 4’’ PVC CONDUIT IN HALF OR JUST WIDE ENOUGH TO FIT AROUND OB LIGHT AND SHEILD BACK HALF OF OB LIGHT ON ALL 4 TOWERS.

PERMANETLY SECURE PVC CONDUIT HALF TO OB LIGHT.

14. REINSTALL ALL LDF4-50A CABLES.

15. REINSTALL ANY REMAINING TOWER MATERIALS THAT WAS PREVIOUSLY REMOVED.