CONSOLIDATED STATEMENT OF WORK FOR

Services at Multiple Honolulu District Facilities

1. SCOPE: This document outlines the requirements for Vegetation Control services, at the Federal

Aviation Administration (FAA) buildings and offices located below. Some locations may also include Landscape Services. The requirements for landscaping will be listed in each individual site specific Scope of Works:

A. Hilo Tower (42 Pages) B. Maui ATCT (12 Pages) C. HCF (6 Pages) D. KAUAI SSC (SOK VORTAC, LIH ASR, SOK NXRAD) (23 Pages)

**Facilities may be added or removed upon mutual agreement of the Government and Contractor.

2. GENERAL INFORMATION

Period of Performance: The period of performance shall be for one (1) Base Year and four 12-month option years. The Period of Performance reads as follows:

Base Year: 04/01/2019 to 03/31/2020 Option Year 1: 04/01/2020 to 03/31/2021 Option Year 2: 04/01/2021 to 03/31/2022 Option Year 3: 04/01/2022 to 03/31/2023 Option Year 4: 04/01/2023 to 03/31/2024

The Government reserves the right to extend the term of this contract at the prices set forth in Section B of the Contract in accordance with the terms and conditions contained in clause 3.2.4-34 Option to Extend Services.

Type of Contract: The Government will award a single firm fixed price contract

Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. A draft Quality Control Plan will be provided with the offer and once selected for award, the contractor will provide the final plan within 30 days after award. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.

Interference with Government Business: The Contractor shall schedule and arrange work so as to cause the least interference with the normal occurrence of Government business and mission. In those cases where some interference may be essentially unavoidable, the Contractor shall be responsible to make every effort to minimize the impact of the interference, inconvenience, customer discomfort, etc.

Page: i

Protection of Government Property: During execution of the work, the Contractor shall take special care to protect Government property including furniture, walls, baseboards, and other surfaces from materials not intended. Accidental splashes shall be removed immediately. The Contractor shall return areas damaged as a result of work under this contract to their original condition, to include painting, refinishing, or replacement, if necessary.

Safety and Fire Prevention: The Contractor shall be responsible for instructing their employees in appropriate safety measures. Housekeeping employees must not place mops, brooms, machines and other equipment in traffic lanes or other locations in such a manner as to create safety hazards.

Appropriate, neat appearing, well-kept signs shall be provided by the Contractor to indicate, “Danger Hazardous Floors, Walk Left or Walk Right”, as applicable, and approved by the COR prior to use. Such signs shall be displayed at all times in all areas where cleaning operations are in progress that necessitate use of any equipment or supplies such as buckets, wires, ladders, water, wax, etc., which may impose a traffic obstruction or personnel hazard. Contractor's employees will be required to interrupt their work to allow passage of personnel, equipment, or carts. When cleaning of a public traffic area (i.e., lobbies or corridors) results in a temporary hazard of wet/slippery floors, housekeeping personnel will use parallel wet mopping or cleaning procedures.

Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

Recognized Holidays: The contractor will not be required to perform services on these Holidays unless specified:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

3. GOVERNMENT FURNISHED ITEMS AND SERVICES

Facilities: The Government will furnish or make available to the Contractor the facilities described in herein. The Contractor will be responsible and accountable for such facilities accepted for use and shall take adequate precautions to prevent fire hazards, odors, and vermin.

Vegetation Control services for Government furnished facilities will be provided by the Contractor. The Contractor will obtain written approval from the Contracting Officer prior to making any modifications or alterations to the facilities. Any such modifications or alterations approved by the Government will be made at the expense of the Contractor. At the completion of the contract, all facilities will be returned to the Government in the same condition as received, except for reasonable wear and tear. The Contractor will be held responsible for the cost of any repairs caused by negligence or abuse on his/her part, or on the part of his/her employees.

Page: ii

Utilities: See individual Scopes of Work for site specific details.

The Government will furnish utility services at existing outlets, for use in those facilities provided by the Government and as may be required for the work to be performed under the contract: electricity, steam, natural gas, fresh water, sewage service, and refuse collection (from existing collection points). Information concerning the location of existing outlets may be obtained from the On-Site Contracting Officer Representative. The Contractor will provide and maintain, at his/her expense, the necessary service lines from existing Government outlets to the site of work.

The Contractor will be responsible for instructing employees in utilities conservation practices.

The Contractor will be responsible for conserving utilities, which shall include, but not necessarily be limited to:

Water faucets or valves will be turned off after the required usage has been accomplished. To conserve water, only the minimum quantity of water needed for the required usage will be expended.

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBLITIES

The Contractor will furnish all materials, equipment, facilities and services required to perform work under this contract that are listed in each SSC’s Scope of Work/Specifications.

a. All power equipment and attachments, including power cable and extension cords, must be free from any defects. The Contractor must use only the FAA furnished power outlets designated by the COR or CO.

b. No contractor furnished or owned commodity must be kept on FAA owned or leased space or property without approval in writing by the COR or CO. The Contractor must keep pilferable items under lock and key at all times and must provide the COR with a key in the event of an emergency.

c. The Contractor will provide the COR and Facility a binder with the complete list of Material Safety Data Sheets (MSDS) for ALL CHEMICALS being utilized to sanitize and clean the facility. The Contractor will also ensure that this list is updated whenever there are Chemical / Product changes.

5. SECURITY BADGING:

• Security badging time frame of new employees will take 4-6 weeks to process but can take longer depending on the situation.

• If a person has a felony, they will not be permitted to have a badge.

• Incumbent contractor employees will be required to rebadge if they move over to a new contractor. Badges will NOT be transferred from one contractor to another.

6. VEGETATION CONTROL SERVICES: Site specific performance requirements for each facility is stated below:

Page: iii

VEGETATION CONTROL FOR

HILO TOWB FACILITIES

SCOPE OF WORK

1. General This section specifies the work required to provide vegetation control maintenance of the Federal Aviation Administration (FAA) Hilo System Support Center property, located at P.O. Box 4909, Hilo Hawaii 96720.

2. Scope of Work The contractor shall furnish all supervision, labor, equipment, materials, supplies and tools required to maintain landscaping by pruning shrubs, plants and trees, mowing lawns, fertilizing, and weed control by other methods specified in these specifications.

Contractor shall also provide transportation to and from work site for contractor personnel, equipment, materials, supplies and tools required.

AOA Area: The Contractor is required to obtain from the Hilo Airport Operations:

AOA (Airport Operations Area) Contractor Badges. There is a processing fee of $10.00 per badge. Replacement badges will cost $50.00 each.

The contractor must obtain a Vehicle Permit to operate any vehicle inside State Airport boundaries. The permit requires that the Contractor take and pass a written test with a score of 80% or higher.

The contractor is required to obtain liability insurance in the amount of $1,000,000 and insurance for unaccompanied passengers as well as vehicle operators in accordance with State Airport Regulations.

The contractor is required to have VHF radios, rotating beacon light(s) and contractor company logo must appear on vehicle doors and any other equipment as required by Hawaii State Airports.

All vehicles, mowing and spray equipment or other machines that are equipped with spark p1ugs shall be provided with appropriate radio frequency (RF) suppression devices.

Weed control shall be controlled by herbicide. Dead weeds shall be removed and properly disposed

of. The herbicide to be used will be "Rodeo" or approved equal, and shall be applied only during calm weather conditions and with the nozzle of any spray equipment used, adjusted or modified to prevent over-spray. Herbicides shall be applied by trained personnel who are thoroughly familiar with this type of work. Any required pre-treatment shall be performed in accordance with the manufacturer's recommendations.

All refuse and rubbish, such as fallen trees, pruned tree limbs, shrubbery, cuttings and leaves resulting from the contractor's work shall be removed from the FAA area surrounding the Hilo International Airport and hauled away to a proper landfill.

A. Hilo Tower

The Scope of Work includes, but is not limited to, maintaining landscape in accordance with the attached sketches and accepted practices of the trade.

3. Work Required The work shall be accomplished in accordance with each site’s specific instructions and sketches.

These sites are located on and off the AOA area, and within the Airport area.

A. HWC NXRAD Sketch 1 465-SK-A-29

1) The contractor shall furnish all supervision, labor, transportation, equipment, tools, materials and supplies, including herbicide required for vegetation control.

2) All work must be accomplished on a monthly basis by the end of the last day of each month. Not to exceed 30 days.

3) Vegetation control shall be accomplished by the application of herbicide unless otherwise specified herein. Application of herbicide may be preceded by week whacking and/or manual pulling at the contractor’s discretion.

4) The area inside the security fence shall be maintained monthly.

5) Fire Break: This area between security fence and the cattle fence shall be kept vegetation free. The area between fences averages 15 feet. Herbicide shall be applied monthly.

6) Entry at the front of the facility facing the roadway: Keep general entrance area (35 feet) by entry gates vegetation free. The area to both ends along the roadway shall be kept vegetation free.

7) All debris, if any, resulting from contractor’s work, shall be removed from the facility by the contractor at the end of the work day.

B. ITO ATCT (Hilo Air Traffic Control Tower) See attached Drawing #1

1) The lawn within the fenced area shall be mowed twice a month at an interval not to exceed 15 calendar days and to and height not to exceed 2 inches. Work to include trimming of the lawn edges along the paved areas. Space distance between the lawn and paved area should not exceed 1-inch. All vegetation under towers will be eliminated and removed. Work shall include trimming of the lawn edges along the paved areas.

The space distance between the lawn and paved areas should exceed 1-inch.All vegetation under the towers will be eliminated and removed. A 6-inch barrier between the paved areas and building shall be vegetation free. Areas around the diesel fuel tank and under building air conditioners will also be vegetation free.

2) Weeds and plants growing next to building structures will be removed monthly.

3) Herbicide shall be applied monthly along fence line. A control area 12-inches inside and outside of fence will be followed. This area will be vegetation free.

4) Landscaped areas shall be kept free of weeds and neatly trimmed.

5) All weeds, grass, rubbish (trees/brush) and debris accumulated during the performance of services specified herein shall be removed from the RTR facility and disposed of IAW local requirements and at the end of each visit.

Estimated Lawn Area: 75,000 square feet Estimated Fence Perimeter: 1180 feet Estimated Edging Area: 1500 feet

C. ITO PAPI (Hilo Precision Approach Path Indicator), Runway 26 See Drawing #2

1) Clear vegetation on asphalt area.

2) Clear vegetation 1-foot around the edges of the asphalt.

D. ITO A PAPI (Hilo Precision Approach Path Indicator), Runway 8 No Picture or Drawing

1) Clear vegetation 15-feet in front of LHA, and 5-feet to the rear and side of LHA.

2) Clear vegetation 2-feet around the edges of the hand holds and cable route markers to ensure visibility.

E. ITO B VASI (Hilo B Visual Approach Slope Indicator), Runway 3 Picture #3

1) Clear vegetation on asphalt area.

2) Clear vegetation 1-foot around the edges of the asphalt.

3) Clear vegetation 2-feet around the edges of the cable route markers to ensure visibility.

F. ITO ODALS (Hilo Off Airways Weather Station) See Picture & Drawing #4

Clear vegetation within a 5-foot radius around the optical heads and power supply.

G. ITO GS & LOC (Hilo Glideslope & Localizer) See Drawing & Picture #5

1) Clear vegetation 5-feet around building and transformer enclosure.

2) Clear vegetation 1-foot from edge of paved areas.

3) Clear vegetation within a 3-foot radius from center of ILS warning signs.

H. ITO ASR-8 (Hilo Airport Surveillance Radar) Drawing & Picture #6

1) The gravel covered area within the fence line shown in the facility sketch shall be kept free of all dead and growing vegetation. All dead vegetation shall be removed mechanically or by any other means deemed appropriate by the contractor and approved by the COR (Contracting Officer’s Representative) at a minimum of once a month.

2) Vegetation in all other areas indicated on the facility sketch shall be trimmed at a maximum of six inches. These areas include: a firebreak area extending 50-feet beyond and parallel with the existing fence line; an area 15-feet beyond the north side of the gravel road, and a 35-foot area beyond the gravel road on the side where the direct burial radar cables are located.

3) All specific services shall be performed at a minimum of once a month at an interval not to exceed 30 days.

4) All weeds, rubbish and debris accumulated during the performance shall be removed from the FAA facility at the contractor’s expense at the end of each work day.

5) Access Road – Trim back tree limbs twice a year, leaving a clearance of 20-feet from the centerline of the road on the south side, and 15-feet on the north side.

I. ITO REIL (Runway End Identification Lights), Runway 3 (Inside AOA Area) Picture #7

1) The gravel covered area within the fenced area of the MM (middle marker) shall be kept free of all dead and growing vegetation. All dead vegetation shall be removed from the graveled area mechanically or by any other means deemed appropriate by the contractor as approved by the COR at a minimum of once a month.

2) The vegetation in all other areas indicated on the facility sketch which includes a 15-foot area on either side of the MM gravel road, a 75-foot area parallel to the north side of the MALSR/REIL gravel road, and a 100-foot area on the south side of the MALS/REIL gravel road shall be kept trimmed at a maximum of six inches with the following exception:

A 5-foot parallel clearance to all sides of the base of the sequenced flashers and the steady burning lights shall be kept vegetation free. All dead and growing vegetation shall be removed.

3) Clear vegetation within a 10-foot radius around the PCA and flasher cabinets.

4) The service specified in the above paragraph shall be performed at a minimum of once a month at an interval not to exceed 30-days.

5) All weeds, rubbish and debris accumulated during the service shall be removed from the FAA facility at the contractor’s expense at the end of each work day.

J. ITO F420 & SAWS (Hilo F420 & (Stand Alone Weather System) Drawing #8

1) The area outlined within the 30-45-foot “vegetation control plots” shall be kept free of all weed and growing vegetation. The weeds and vegetation shall be mowed/sprayed at least twice a month at an interval not to exceed 15 calendar days. The resulting vegetation should not exceed two inches.

2) All weeds, rubbish and debris accumulated during the performance of the service shall be removed at the end of each work day from the plots by means deemed appropriate by the contractor and approved by the COR.

K. ITO RTR (Hilo Remote Transmitter/Receiver) Drawing & Picture #9

1) The lawn within the fenced area shall be mowed twice a month at an interval not to exceed 15 calendar days and to and height not to exceed 2 inches. Work to include trimming of the lawn edges along the paved areas. Space distance between the lawn and paved area should not exceed 1-inch. All vegetation under towers will be eliminated and removed. Work shall include trimming of the lawn edges along the paved areas.

The space distance between the lawn and paved areas should exceed 1-inch.All vegetation under the towers will be eliminated and removed. A 6-inch barrier between the paved areas and building shall be vegetation free. Areas around the diesel fuel tank and under building air conditioners will also be vegetation free.

B. Weeds and plants growing next to building structures will be removed monthly. Sleeping grass shall be dug out and removed prior to any mowing activity. Herbicide shall not be used to control sleeping grass

C. Herbicide shall be applied monthly along fence line. A control area 12-inches inside and outside of fence will be followed. This area will be vegetation free.

D. Landscaped areas shall be kept free of weeds and neatly trimmed.

E. All weeds, grass, rubbish (trees/brush) and debris accumulated during the performance of services specified herein shall be removed from the RTR facility and disposed of IAW local requirements and at the end of each visit.

Estimated Lawn Area: 13,630 square feet Estimated Fence Perimeter: 685 feet

Estimated Edging Area: 550 feet

L. PAHOA H/HH (NDB) Sketch 465-SK-A-23

1) The area shown within the boundaries of the sketch shall be kept free of growing vegetation with the exception of planted fruit trees and flower beds. The land within this area is basically volcanic lava without lawn but encompasses approximately 8.2 acres of gravel.

2) Dead vegetation resulting from applying herbicide shall be trimmed to maximum height of 6 inches at least once a month.

3) Vegetation shall be kept free 12 inches inside and outside of the fence line. Herbicide shall be applied monthly unto the boundaries to control encroachment onto the property.

4) Dead palm fronds from the palm trees shall be removed once a month from the premise.

5) All weeds, rubbish, and debris accumulated during the performance of the service shall be removed at the end of each work day from the FAA facility.

ESTIMATED AREA: 8.2 Acres

ESTIMATED FENCE AREA: 85 Feet ESTIMATED PERIMETER: 250 Feet

M. PAHOA ATCBI Sketch 465-SK-A-24

1) The gravel covered areas within the fenced area shown in the facility sketch shall be kept free of all dead and growing vegetation. It shall be removed mechanically or by any other means deemed appropriate by the contractor from all gravel areas at a minimum of once a month. The COR will be available if there are any questions.

2) Vegetation in all other areas indicated on the sketch shall be trimmed to a maximum of

6 inches, with the exception of the fence perimeter which shall be vegetation free 12 inches inside and 12 inches outside to prevent encroachment of vines and other flora into the fenced area.

3) The area described in paragraph 2 shall include a 50 foot fire break area paralleling the existing fence line and an area covering 6 feet on each side of the paved road. All work specified shall be accomplished at least once a month and not to exceed an interval of 30 days.

4) All weeds, rubbish and debris accumulated during the performance of the service shall be removed from the FAA facility at the contractor’s expense at the end of each work day.

ESTIMATED FENCE PERIMETER: 800 Feet ESTIMATED FIRE BREAK AREA: 50,000 Square Feet

ESTIMATED LENGTH OF ROAD: 1,070 Feet ESTIMATED AREA ON BOTH SIDES OF ROAD: 12,840 Square Feet

MALS (Medium-Intensity Approach Lighting System) Sketch 465-SK-A-25

1) The gravel covered areas within the fenced area of the middle marker shall be kept free of all dread and growing vegetation. All dead vegetation shall be removed mechanically or by any other means deemed appropriate by the contractor as approved by the COR from all graveled areas at a minimum of once each month.

2) The vegetation in all other areas indicated on the facility sketch which includes a

15-foot area on either side of the MM gravel road, and a 75 foot area parallel to the north side of the MALSR/REIL gravel road and a 100 foot area on the south side of the MALS/REIL/gravel road shall be kept trimmed to a maximum of 6 inches with the following exception.s:

Al A five-foot parallel to all side of the base of the sequenced flashers and the steady burning lights shall be kept vegetation free. All dead and growing vegetation shall be removed.

3) The services specified in the paragraph shall be performed at a minimum of once each month at an interval not to exceed 30-days.

4) All weeds, rubbish and debris accumulated during the performance of the specified services shall be removed from the FAA facility at the contractor's expense at the end of each work day.

HAMAKUA (QHC) RCAG Sketch 465-SK-A-22

1) The lawn within the fenced area shall be mowed to a height not to exceed 2 inches twice a month at an interval not to exceed 15 calendar days. Work includes trimming of the lawn edges along the paved areas. The space distance between the lawn and the paved area should be kept above 1 inch. All vegetation under the towers shall be eliminated and removed. The paved areas as well as the area around the building shall be kept vegetation free outside of 6 inches surrounding the building. The area around the fuel tank access/filler and the area around the air conditioners under the shed shall remain vegetation free.

2) Weeds around the plants near the building structures shall be removed once a month.

SLEEPING GRASS SHALL BE DUG OUT AND REMOVED PRIOR TO MOWING.

HERBICIDE SHALL NOT BE USED TO ELIMINATE SLEEPING GRASS.

3) Herbicide shall be applied monthly 12 inches inside and 12 inches outside along the fence line and shall be kept vegetation free.

4) The landscaped areas shall be kept free of weeds and neatly trimmed.

5) All weeds, rubbish and debris accumulated during the performance of the service specified herein shall be removed from the RCAG premises and hauled away at the end of each work day.

ESTIMATED LAWN AREA: 12,300 Square Feet ESTIMATED FENCE PERIMETER: 450 Feet ESTIMATED EDGING AREA: 80 Feet Around Paved Perimeter

N. Vortac (VOR Collocated with TACAN) Sketch 465-SK-A

l) The grounds within the fenced area of the facility shall be kept free of all weed and growing vegetation. All dead vegetation shall be removed mechanically or by any other means deemed appropriate by the contractor and approved by the COR. The outside 12-inches of the perimeter of the fence shall be vegetation free. This is to prevent the encroachment of vines and other flora in to the fenced in areas.

2) Vegetation in all other areas indicated on the facility sketch shall be kept trimmed to a maximum of 6-inches. These areas include: a facility firebreak area extending 50-ft beyond the paralleling the facility fence line and an area extending 8-ft on each side of the paved road where there are no existing utility poles, and an area 20-ft on each side of the paved road where there are existing utility poles. Trim all tree branches within this area.

3) All specified services shall be performed at minimum of at least once a month at intervals not to exceed 30-days as indicated by the maintenance schedule submitted by the contractor. Trimming tree branches are to be done twice a year.

4) All weeds, rubbish, and debris accumulated during each performance of service shall be removed from the FAA facility at the contractor’s expense at the end of each work day.

E. Hilo Tower

4. Utilities The Government will make available to the contractor from existing outlets all reasonably required amounts of power and water without charge. Utilities furnished the contractor without charge shall be carefully conserved.

5. Work Schedule All work shall be scheduled and performed during working hours (7:00am - 4:00pm) except when prior approval has been obtained by an FAA COR (Contracting Officer's Representative). Work must be performed weekly between Mondays through Fridays. If work needs to be perfomed after hours or on the weekends, prior coordination with the COR is required.

6. The COR The COR shall meet with the Contractor to finalize and define the contract specifications.

The COR must be informed when the services start and when completed in writing. All weeding will be on a written statement. This may be accomplished by having the contractor initialing a work performance invoice and submit this to the FAA representative. The FAA representative will validate the completion of work.

Section I - Maintenance Service

1. General: The intent of these specifications is that the Contractor provides care for and maintains a well-kept and cared-for appearance at all times. Overall results will be a major consideration in the acceptability of contractor performance.

2. Mowing: Mowing of lawn areas shall be done week1y to maintain grass at a minimum height.

Partial or patch mowing is not acceptable unless inclement weather prevents finishing work after it has been started. Work shall be accomplished in a timely manner, consistent with the regular maintenance intervals (within the week). Care shall be taken to avoid damaging plants, lawns, and sprinkler systems. Any damaged sprinklers or irrigation lines will be repaired by the contractor at their expense.

3. Clippings: Clippings are to be picked up in the mowing operation or swept clean after mowing and are to be removed from the premises by the contractor. They are not to be left overnight nor swept back into the lawn.

4. Edging: Trimming of edges shall be done at each mowing to maintain a neat and uniform line separating the lawn from header boards, sidewalks, building, fences, and/or other obstacles. All edging ·will be done to retain the original size and shape of planter areas.

5. Pruning: Small trees and all shrubs are to be pruned each month to maintain existing shape and size and to remove all dead and/or diseased sections. All cuttings be removed from the premises by the contractor.

Section II - Fertilizing:

At least four (4) times a year, a weed-free fertilizer and/or other soil abatement will be applied tolawn areas (including ground cover areas, flowers, shrubs and small trees and plants) at the ATCT and the RTR site only, in accordance with the manufacturer's directions and recommendations. The fertilizing agent and the application schedule will be approved by and coordinated with the COR.

Section III - Grounds C1eanup Weekly

1. Sidewalks and driveways shall be swept clean.

2. Dead animals (rodents, toads, etc.) will be picked up and disposed of by the Contractor.

3. All debris and litter (including wastepaper, plant and tree leaves, nuts, seeds, etc.) shall be removed from the parking area, driveways, around front of the facility and grounds inside the perimeter fence, and hauled to an approved dumpsite.

Note: In no case shall contractor place trash, grass clippings, shrubs or any other material from any other job location other than HNL HCF, in the facility dumpsters.

Section IV - Weed Abatement and Control

All hazardous chemicals used on the job site will be submitted to the COR for approval prior to doing work.

Work under this section requires that all unwanted plant growth be controlled by approved chemical treatment methods and all remaining debris be removed from the facility premises at least twice a month:

1. Contractor will provide a complete list of Manufacturer's Material Safety Data Sheets (MSDS), as appropriate.

2. All lawns, planting beds, and non-planted areas shall be cultivated, weeded, and/or treated as frequently as necessary to control weeds by preventing their growth and spread. Only recognized commercial herbicide products manufactured for this purpose and approved for use in the State of Hawaii shall be used. Application shall be done by the manufacturer’s recommendations with licensed and/or trained personnel doing the work.

3. In the 36" wide area adjacent and including the perimeter fence line, all weeds and other vegetation will be eliminated either by hand weeding or spraying. At no time will plants in this area be permitted to interfere with the security of the facility by restricting visibility beyond the fence, or by providing over-the-fence access to the premises.

4. At least twice each month, all unsightly vegetation (weeds, grass, etc.) shall be removed from parking islands, curbs, fence lines, between cracks in concrete and asphalt, etc.

5. All landscaped plants shall be examined for pests and diseases on a monthly basis. If any pests or diseases are found, an appropriate insecticide or remedy shall be taken. If the diseased plant must be removed, inform the COR. All debris will be removed from the FAA grounds and hauled away to the proper landfill.

Payment: Payment for work outlines in the specifications for this contract will be made in arrears for work performed and certified by the Contracting Officer's Representative (COR).

1. Submittals: Within ten (10) days after contract award, the Contractor shall furnish the following for approval, to the COR:

A. A listing of all materials, equipment and supplies the Contractor proposes to use on the various job site.

B. A complete set of Manufacturer's Material Safety Data Sheets (MSDS) as appropriate.

C. A list of equipment the Contractor proposes to use for approval prior to start of work whether owned or rented.

D. A complete schedule of intended work and proposed time of year specialty work will be accomplished.

2. Responsibilities of the Contractor:

A. Furnish all supervision, equipment, labor, mate1ials, and transportation required to maintain the facility grounds in a healthy and attractive condition.

B. Ensure that work is accomplished as to guarantee no interruption of or interference with the proper execution of Government business.

C. Comply with all local laws, ordinances, and Federal regulations; and obtains and pays for any or all necessary permits and licenses.

3. Rights and Authority of the Government: The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with all other Contractors and the Government. The Contractor shall schedule work to accommodate such additional work as directed by the Contracting Officer. The Contractor shall not interfere with the performance of work by any other Contractor or by the Government.

4. Supplies and Equipment:

A. The Government will furnish at the Government's expense the following:

1) Electrical power at existing power outlets

2) Water for grounds maintenance

3) Facility trash dumpster

4) Key cards from guards on as needed basis.

B. The Contractor shall provide all supplies and equipment required for the performance of this contract. The supplies and equipment required, but not limited to, are as follows:

1) Fertilizer, sprays, soil conditions, and all other commercial products required.

2) Any and all equipment required to accomplish the work described in the contract specifications.

5. Failure to Perform: If the Contractor fails to accomplish the work described in the contract specifications, the Government may elect to have that work done by other contractors. In that event, Paragraph 5 above will apply, and costs incurred will be deducted from the contract price.

6. Security Access to Hilo’s Sites: Contractor shall provide in writing for approval to the COR, the following:

A. Name, Hawaii Driver's License (HDL) number or State of Hawaii identification card or other

Government issued identification, living address and phone numbers of all supervisors and employees who may need access to the HCF site.

B. If substitutes for employees or new employees are required, forward a revised list of all employees with names, HDL numbers (or other Government issued identification) or Hawaii ID numbers, addresses and phone numbers to the COR, at least two working days in advance of site visit to perform work.

7. Distances of Sites from Hilo: (See attached Diagram on Page 42 of 42)

A. QHC RCAG - 20 miles B. POA NDB & ATCBI - 18 miles C. HWC NXRAD - 66 miles

STATEMENT OF WORK

Vegetation Maintenance at Kahului Air Traffic Control Tower

SCOPE:

The contractor shall furnish all supervision, labor, equipment, materials, supplies, and tools required to control vegetation by pruning shrubs, watering, fertilizing, mowing, or by herbiciding at the Kahului ATCT Facility and by other methods specified in these specifications. Contractor shall also furnish all transportation to and from the work site for contractor personnel, equipment, materials, supplies and tools required.

All vehicles, mowing and spray equipment or other machines that equipped with spark plugs shall have appropriate radio frequency (RF) suppression devices.

The herbicides used for vegetation control and prevention shall be of industrial grade quality as generally used per the landscaping trade. Herbicides shall be applied by qualified and trained personnel who are thoroughly familiar with this type of work. Any required pre-treatment shall be performed in accordance with the manufacturer’s recommendations. Application of herbicide by the contractor shall be performed under calm weather conditions and with the nozzle or any spray equipment used, adjusted or modified to prevent over-spray.

All refuse, such as fallen trees, pruned tree limbs, shrubbery cuttings, leaves, weeds, as well as grass cuttings, shall be removed by the contractor at the end of each workday.

The contractor shall also maintain no grass at the following nearby graveled facilities:

OGG RTR, OGG ASR, OGG VOR, and VYI NDB. Herbicides shall be used to prevent growth of all vegetation and control weeds.

B. Maui ATCT

Table of Contents

1.0 PURPOSE

1.1 GENERAL REQUIREMENTS

2.0 RESERVED

3.0 REQUIREMENTS

3.1 WORK OUTSIDE REGULAR HOURS

3.2 MANAGEMENT

3.2.1 Work Control

3.2.2 Herbicides

3.2.2.1 Control Methods

3.2.2.2 Herbicide use records

3.2.3 Trash, Litter, and Vegatative Debris Collection and Disposal

3.2.4 Contractor’s Superintendent

3.2.5 Uncertified Personnel

3.3 CONTINUITY OF SERVICES

3.4 MAINTENANCE OF KAHULUI AIR TRAFFIC CONTROL TOWER

3.4.1 Grass Cutting

3.4.2 Edging

3.4.3 Plant and Shrub Pruning

3.4.4 Tree Pruning

3.4.5 Herbicides

3.4.6 Trash and Litter Collection and Disposal

3.5 MAINTENCE OF OGG RTR, OGG ASR, OGG VOR, AND VYI NDB

3.5.1 Grass cutting and Edging

3.5.2 Access roads

3.5.3 Herbicides

3.8 INDEFINITE QUANTITY WORK ITEMS

3.8.1 Raking

3.8.2 Grassing

3.8.3 Underbrushing

3.8.4 Irrigation

3.8.5 Ditch Cleaning

4.0 GOVERNMENT FURNISHED PROPERTY AND SERVICE

4.1 GOVERNMENT FURNISHED FACILITIES

4.2 GOVERNMENT FURNISHED EQUIPMENT

4.3 GOVERNMENT FURNISHED MATERIAL

4.4 AVAILABILITY OF UTILITIES

4.5 CONTRACTOR FURNISHED ITEMS

5.0 DEFINITIONS

6.0 ATTACHMENTS

1.0 Purpose

The purpose of this SOW is to obtain grounds maintenance services at Kahului Air Traffic Control Tower by means of a combination firm fixed-price and indefinite quantity contract.

1.1 General Requirements

The Contractor must furnish all labor, supervision, equipment, and materials necessary to provide grounds maintenance services in accordance with the requirements specified herein. The operations to be performed must include cutting grass, edging, fertilization, collection and disposal of litter and trash, vegetation cutting and removal, under brushing, grassing, sodding, sprigging, erosion control, tree and shrub pruning, tree and stump removal, irrigation, ditch cleaning, and other miscellaneous services as described herein. All operations will be performed pursuant to Executive Orders 13423 and 13514, and the FAA Green Procurement Plan (GPP). As such, the Contractor must use environmentally preferable products and services. These program elements include, but are not limited to: products and services that are energy-efficient, water-efficient, bio based, non-ozone depleting, contain recycled-content, and non-toxic or less-toxic alternatives; diversion of non-hazardous waste and construction and demolition debris from landfills, including composting; alternative fuels use and fuel efficient vehicles and equipment, and reduced greenhouse gas emissions. These program elements are described on the Office of the Federal Environment Executive website (http://www.ofee.gov).

2.0 Reserved

3.0 Requirements

3.1 Work Outside Regular Hours

Except as may otherwise be specified, all work must be performed during regular hours. If the Contractor desires to carry on work on Saturday, Sunday, holidays, or outside regular hours, he/she may submit application to the ACO for approval.

3.2 Management

The Contractor must manage the total work effort associated with the grounds maintenance services required herein to assure fully adequate and timely completion of these services. Included in this function will be a full range of management duties including, but not limited to, planning, scheduling, report preparation, and quality control. The Contractor must provide an adequate staff of personnel with the necessary management expertise to assure the performance of the work in accordance with sound and efficient management practices.

3.2.1 Work Control

The Contractor must implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking of work in progress. The Contractor must plan and schedule work to assure labor, equipment, and material are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and status reports must be provided when requested by the Government Representative.

3.2.2 Herbicides

The Contractor must manage invasive and noxious weeds via the least toxic means available. The Contractor must also use bio-based products (designated Bio-Preferred by the U.S. Department of Agriculture). The Contractor must not perform regularly scheduled, periodic herbicide applications except in situations where no other approach or technology is available to protect personnel or property of high value.

If herbicides are to be applied, the application must occur during unoccupied hours and the Contractor must be licensed by the applicable State agency to provide pesticide application in the categories specified in this contract. All work must be under the superintendence of a certified, responsible individual, and in accordance with Federal, State, local laws and requirements. The Contractor must submit Material Safety Data Sheets meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313 for all hazardous chemicals to be used.

3.2.2.1 Control Methods

The Contractor must utilize only herbicides registered by the Environmental Protection Agency. Use must be in strict compliance with label directions for the control of the target weeds. Herbicides selected, application rates, and application techniques must have the prior approval of the ACO. Additionally, the Contractor must control pests using integrated pest management principles (http://www.epa.gov/pesticides/factsheets/ipm.htm).

3.2.2.2 Herbicide Use Records

The Contractor must prepare, submit, and maintain daily records of herbicide usage. This record must be filled out daily as weed control operations are performed, and all entries must be completed within 24 hours of chemical usage. Completed records must be made available upon request for inspection, and must be forwarded to the ACO with the monthly invoice for each month following the month of operation. Records which are rejected by the ACO due to improper preparation must be resubmitted by the Contractor at no additional cost to the Government.

3.2.3 Trash, Litter, and Vegetative Debris Collection and Disposal The Contractor must collect trash, litter, and vegetative debris (e.g., natural vegetation, such as leaves, pine straw, limbs, and stumps) in all grassed areas, plant and shrub beds, wooded areas, sidewalks, streets, and curbs during maintenance activities and dispose of it in the appropriate waste, recycling, or composting receptacles. All trash, liter, and vegetative debris must be removed off the activity the same day as collected.

3.2.4 Contractor's Superintendent

During the execution of all work involving the handling and/or use of herbicides, the Contractor must give the job his personal supervision or must have on the job a responsible and competent representative with the authority to speak and act for him. The whereabouts on the activity of the supervisor must be made known to the Government Representative at all times when work is performed.

3.2.5 Uncertified Personnel

Uncertified personnel who apply herbicides must have been employed in weed control for a minimum of 30 days and have received training in:

a. Selection, application, and evaluation of appropriate control procedures.

b. Safe and effective application techniques, and the calibration and use of all equipment required.

c. Handling, storage, and transfer of pesticide materials as required.

d. Reading, interpreting, and following herbicide label instructions.

e. Use and maintenance of all required safety equipment.

http://www.epa.gov/pesticides/factsheets/ipm.htm

f. The consequences of preparing a herbicide to be given or sold to an individual other than an authorized employee of the Contractor or regulatory official.

g. Procedure for handling herbicide spills, including reporting procedures.

h. The security of vehicles and equipment.

3.3 Continuity of Services.

To ensure continuity of essential services, the successful bidder must be prepared to fully commence work on the start date of this contract, and should not assume that Government or previous Contractor employees will be available to guide, direct, or specifically orientate each Contractor employee.

3.4 Maintenance of Kahului Air Traffic Control Tower

The Contractor must provide maintenance services at intervals not to exceed 15 calendar days.

3.4.1 Grass Cutting

All grassed areas must be cut to a uniform height not to exceed 2 inches. The grassed areas outside the fenced perimeter, that are accessible, will be cut to clear a six (6) foot section beginning at the fence line.

The grass will be cut from the front fence line to the access road. If any bare ground within the limits of an area becomes vegetated with grass, weeds, or other similar growths through natural spread, i.e., not artificially planted, it must be maintained as part of the basic contract. Prior to cutting, any trash, paper, or other debris that would detract from the finished appearance of the cut or present a safety hazard must be disposed of in the appropriate waste, recycling, and/or composting receptacles. Such debris includes but is not limited to paper, cans, bottles, limbs, pine cones, rocks, and other such objects within the maintenance area, and must include trash, paper, dead leaves, and other debris lodged in shrubs, hedges, fences, and along foundation and other walls. Debris must be disposed of the same day as collected. Grass cutting is to be accomplished free of scalping, rutting, bruising, and uneven and rough cutting. Cutting equipment must have sharp cutting edges which produce a neat, clean, even cut. Use of cutting equipment which is out of adjustment, thereby causing streaks or irregularities, uneven cutting, plowing, or gouging of the soil must not be permitted. Ground speeds and mower speeds must be synchronized to assure effective cutting action.

After cutting, grass must have a uniform height. Grass clippings must not be windrowed or allowed to be deposited in piles or clumps. Grass clippings must be uniformly distributed over the mowed area. Grass areas close or adjacent to buildings, hydrants, parking lots, manholes, fences, trees, hedges, and shrubs are included in mowing requirements, and may require hand mowing. Trimming around trees, shrubs, flower/shrub beds, cultivated areas, poles, walls, valves, and other similar objects must be accomplished to match the height and appearance of the surrounding mowed grass. Trimming may be accomplished by hand clipping, or by use of "weed eater" type equipment. Trees and shrubs must not be damaged by trimming operations. Grassed areas, trees, or shrubs which are killed or damaged as a result of Contractor's work must be repaired or replaced by the Contractor at no cost to the Government. Trimming operations must be considered a part of grass cutting and must be accomplished concurrently (same day) with grass cutting operations. Grass cutting will not be considered complete until all trimming operations are accomplished.

Grass clippings and trimmings must be removed from sidewalks and other paved areas the same day the grass is cut.

3.4.2 Edging

All sidewalks, driveways, street edges, curbs, other paved areas, and shrubbery areas must be edged. All edging must be by mechanical means. The edging operation must include removal of grass and other vegetation which has encroached onto street and other paved surfaces from adjoining grassed areas. Where driveway or street pavement edge is not discernable due to grass encroachment, a straight and even line approximating the edge of pavement must be established and maintained. The edging operation must produce neat, clean lines along the sides of sidewalks and other areas edged, and must be accomplished free of scalping, rutting, bruising, uneven and rough cutting. All vegetation growing in the following areas must be removed during the edging operation:

1. Sidewalk and driveway expansion joints and cracks.

2. Street/driveway curbing expansion joints.

3. Cracks between curbing and street/driveway pavement.

For continued maintenance of vegetation growing in cracks and expansion joints, herbicide treatment may be utilized to reduce the amount of mechanical work. The use of herbicides must not be allowed for the purpose of eliminating or reducing normal mechanical edging along straight paved edges (sidewalks, etc.).

Debris generated by edging operations, which falls on or is thrown on sidewalks, on curbs, in gutters, streets, or is thrown on nearby sod, causing an unsightly appearance, must be removed from the site the day of the edging operation and disposed of.

3.4.3 Plant and Shrub Pruning

Shrubs, bushes, hedges and cultivated plants must be kept pruned. All clippings and debris must be removed from the site the same day and disposed of [see Section 3.2.3 for waste management requirements]. Pruning must be accomplished so as to:

1. Remove new growth attaining a manicured presentation per the industry trade.

2. Evenly form and balance the shrub, bush, or plant in order to shape it according to its natural growth habits. "Box" or "circular" shaping is not acceptable, except with hedges. Hedges must be sheared or pruned, as appropriate, to maintain their established shape and appearance.

3. Remove dead, damaged or diseased wood. If the entire shrub should die, remove the entire shrub to 6 inches below ground level. The hole and any other surface damage caused by removal must be filled with topsoil, fertilized, raked and seeded.

4. Remove vines, tree sprouts or any other extraneous vegetative growth from under or on the shrubbery.

5. Prune or remove growth in front of windows, over entrance ways or walks, or where vision is obstructed at street intersections.

3.4.4 Tree Pruning

Trees must be pruned in accordance with the following guidelines to selectively remove unwanted growth and encourage trees to grow or respond in a desired manner. All tree pruning must be accomplished under the supervision of an individual furnished by the Contractor, who is trained, experienced, and otherwise qualified in proper tree pruning techniques.

Verification of such training, experience, and qualifications must be acceptable to the ACO prior to initiation of any tree pruning. Prior to starting work the Contractor must propose a pruning plan for each tree for the approval of the ACO.

This is the start of the file's text. The full file is on GovTribe.

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it.