Amendment 1.pdf
PDF 5 MB Posted
- Attached to
- Angel Peak ARSR HVAC Replacement. Las Vegas, NV
- Solicitation number
- 697DCK-19-R-00073
About this file
Amendment 1 (pdf)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 004.pdf | ||
| Past Performance.pdf | ||
| Amendment 001.pdf | ||
| Amendment 002.pdf | ||
| Davis Bacon.pdf | ||
| Drawings.pdf | ||
| Revised RFO.pdf | ||
| Amendment 003.pdf | ||
| Specs.pdf | ||
| Davis Bacon.pdf | ||
| Revised RFO.pdf | ||
| Drawings.pdf | ||
| Davis Bacon.pdf | ||
| Amendment 001.pdf | ||
| Amendment 003.pdf | ||
| Specs.pdf | ||
| Davis Bacon.pdf | ||
| Amendment 002.pdf | ||
| Past Performance.pdf | ||
| Amendment 1.pdf | ||
| Specs.pdf | ||
| RFO.pdf | ||
| Past Performance.pdf | ||
| Davis Bacon.pdf | ||
| Davis Bacon.pdf | ||
| Amendment 002.pdf | ||
| Drawings.pdf | ||
| Davis Bacon.pdf | ||
| Past Performance.pdf | ||
| Drawings.pdf | ||
| Davis Bacon.pdf | ||
| Specs.pdf | ||
| RFO.pdf | ||
| Specs.pdf | ||
| Davis Bacon.pdf | ||
| RFO.pdf | ||
| Drawings.pdf | ||
| Davis Bacon.pdf | ||
| Past Performance.pdf | ||
| Past Performance.pdf | ||
| Davis Bacon.pdf | ||
| Davis Bacon.pdf | ||
| RFO.pdf | ||
| Specs.pdf | ||
| Davis Bacon.pdf | ||
| Specs.pdf | ||
| RFO.pdf | ||
| Drawings.pdf | ||
| Past Performance Survey.pdf |
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.
PAGE OF PAGES
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.
E. IMPORTANT: Contractor is not, is required to sign this document and return
ORDER NO. IN ITEM 10A.
1 2
0001 12/01/2018
FEDERAL AVIATION ADMINISTRATION
AAQ-500 - REGIONAL ACQUISITIONS
2200 S. 216TH STREET
DES MOINES WA 98198-6547
AAQ530ANM-AFN
x
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ x x
697DCK-19-R-00142
copies to the issuing office.
12/01/2018
(x)
The following is hereby added to this RFO:
Due date is extended to January 17, at 2PM Seattle time.
Answers to received questions.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Due Date: Proposal due date is extended to 2PM local Seattle time on Thursday January 17, 2019
Q/A
Q. Is the second to the last sheet called out on the cover sheet supposed to be M224? The reason I am asking is because when I printed out the set there is a M224 and no M249.
A. Typo. The cover sheet should be -M224, not -M249.
1. Is there a site plan showing road access and possible locations for the crane? With the snow this is hard to nail down.
A. No. I would suggest looking at a Google Earth satellite image.
2. Please provide site photos with no snow.
A. See the attached photos (IMG_6267.JPG and IMG_6268.JPG).
3. Is there any abatement required?
A. No
4. Is there a soils report for the area we are digging to show if we will encounter rock?
5. Down spouts to be replaced, will they need to be bonded?
A. We are not replacing any down spouts under this project.
6. Condensate drains required to be bonded?
7. Heat strips Spec and control requirement?
A. There are no heat strips. The heating section is propane gas fired. Refer to –M102. Controls are clearly shown on drawings –M150 through –M162, and –M220 through –M225
8. What is the Ladder and refrigeration bonding requirement.
A. Not applicable. Drawing –M125 shows all of the grounding and bonding requirements
9. Added bollards to be bonded A. No.
10 We will Assume HVAC equipment is provided with factory disconnects, was this the design intent?
A. Bad assumption. Refer to drawing –M140 and specification section 1.1.2.
11 Has the budget been increased from the previously solicitation or is the actual available funding within the $250-500k project magnitude? We understand that this was previously bid and the bids exceeded that amount but nothing has been changed.
A. Magnitude is correct.
| 697DCK-19-R-00142 |
| Q |
| Pic 1 |
| Pic 2 |
File details come from the government source that posted it.