About this file

SPECIFICATIONS - SITE SPECIFIC (pdf)

View the file

Other files

File Type Posted
SF-1413.pdf PDF
SPECIFICATIONS - BASE.pdf PDF
AMENDMENT 1.pdf PDF
AMENDMENT 2.pdf PDF
SITE PHOTOS.pdf PDF
SOLICITATION.pdf PDF
DRAWINGS.pdf PDF
DAVIS BACON WAGE DETERMINATION.pdf PDF
SF-1413.pdf PDF
SITE PHOTOS.pdf PDF
SPECIFICATIONS - SITE SPECIFIC.pdf PDF
SPECIFICATIONS - BASE.pdf PDF
DRAWINGS.pdf PDF
AMENDMENT 1.pdf PDF
DAVIS BACON WAGE DETERMINATION.pdf PDF
SOLICITATION.pdf PDF
SPECIFICATIONS - SITE SPECIFIC.pdf PDF
SOLICITATION.pdf PDF
DAVIS BACON WAGE DETERMINATION.pdf PDF
SITE PHOTOS.pdf PDF
SF-1413.pdf PDF
SPECIFICATIONS - BASE.pdf PDF
DRAWINGS.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Special Provisions 1 JCN# 1101571

Special Provisions for

Removal of existing VASI and Installation of a LED PAPI Facility for Runway 12 at Appleton International Airport, Appleton, WI.

The following Special Provisions shall modify, supersede, or supplement the FAA-GL-918D - Specification for Construction of Terminal Navigational Aid Facilities.

SP-1: Scope of Work

The Contractor shall furnish all plant, labor, materials (except Government-furnished property, see SP-4), equipment, energy, transportation, and other services necessary to construct all elements of the systems required in the contract specifications and drawings. Construction shall include all miscellaneous and incidental work necessary for a complete and operational system. The FAA will provide a Contracting Officers Representative (COR) for construction oversight of this project.

The contractor must coordinate the exact sequence of work with the airport authority and the local FAA System Support Center (SSC) through the COR prior to construction and must provide updated construction schedules at the preconstruction conference and upon request. The

Contractor must hold a tailgate safety meeting prior to commencement of work each day, in the presence of the COR, to discuss possible safety hazards and mitigation.

This scope of work provides instructions for the removal of the existing VASI and the installation of the Runway 12 LED PAPI (AQZA) at the Appleton International Airport, Appleton, WI. (ATW).

The work includes but is not limited to:

1. Coordinate with airport operations, local FAA SSC representatives, and local utility companies to locate existing buried utilities and cabling near the construction area.

2. Coordinate with the airport and the SSC, through the COR, all required runway closures required for this work.

3. Contract a registered land surveyor (RLS) to layout and stake all components to be installed. Install orange snow fence to delineate RSA limits.

4. Remove existing Visual Approach Slope Indicator (VASI) Lamp Housing Assemblies and supports at both RWY 12 locations and at the VASI Rack. Turn VASI Rack equipment over to SSC for excessing. Recycle VASI light house units. Completely remove existing concrete foundations. The existing VASI is a Hughey and Phillips model, which has no asbestos issues as per Jenny Ross.

Removal of VASI’s and foundations to occur during the runway shutdown. Dispose of concrete off airport property.

5. Remove existing power and control cables to 2 feet below existing grade as required, at VASI light units and at the VASI Rack.

Special Provisions 2 JCN# 1101571

6. FAA SSC to remove disconnect switch at utility power enclosure. We Energies Power Company to disconnect and remove existing meter base. Contractor to demolish and recycle metal enclosure.

See photos for enclosure size.

7. Construct new reinforced concrete foundations for PAPI Lamp Housing Assemblies (LHA) and the

PAPI Power /Control Rack.

8. Construct perimeter grounding loop around PAPI LHA’S and the PAPI Rack foundation. Test all grounding per specs. and in the presence of the COR and SSC tech. Deliver a written record of the test results to the COR.

9. Install PAPI LHA’s and EMT supports on new concrete foundations.

10. Mount new FA-30200 PAPI Power /Control Panel, safety switch, surge protector, Ground-to

Ground, Air to Ground control receiver and the power meter on the new PAPI Power and Control

Rack. Meter install to be coordinated with the power company.

11. Install wiring for PAPI Rack equipment and wire to the PAPI control cabinet.

12. Install 2 non-aircraft rated handholes as per plans. One handhold for power cables and one for control cables. Handholes will be outside the RSA and the TSA.

13. Install paved access roads and drainage culvert under access road leading to the LHA’s..

14. Construct trenches with power and control cables in separate PVC Sch. 80 conduits, connecting the

PAPI LHA’s and the PAPI Power and Control Rack to the handholds.

15. Install all cables as per wiring diagram.

16. Coordinate meter installation and power connection with the power company. The transformer will be located next to PAPI rack and installed by Wisconsin Public Service. The concrete pad for the transformer by contractor. Power company will trench in power cables from the existing LOC shelter to their transformer. Power company is responsible for restoring trenched areas back to its original condition.

17. All power shall be tested for continuity and insulation integrity per specifications after installation in the presence of the COR and SSC technician. A written record of the test results shall be delivered to the COR.

18. Construct crushed rock plots around PAPI (LHA’s) and at PAPI Power and Control Rack.

19. Aim PAPI LHA’s, as per Technical Instructions (TI) book.

20. Restore disturbed areas to match the surrounding terrain.

21. FAA to Flight Check new PAPI installation.

22. Participate in Contractor’s Acceptance Inspection (CAI) with the COR and quickly address any punch list items. CAI may be conducted in conjunction with the Joint Acceptance Inspection (JAI) with the SSC office.

Special Provisions 3 JCN# 1101571

SP-2: Schedule Requirements

Contract Performance Time: 23 Calendar Days

Proposed Construction Notice-to-Proceed (NTP): September 1, 2018

After the award of the contract and prior to starting work, the contractor must submit to the

Contracting Officers Representative (COR) a satisfactory progress schedule which must show the proposed sequence of work, and how the contractor proposes to complete the various items of work within the number of working days set up in the contract or on or before the completion date specified in the contract. The contractor must confer with the COR at regular intervals in regards to the performance of the work according to the progress schedule.

Prep work such as surveying, stake-out, badging, etc. may be conducted before the NTP with the permission of the Airport authority, air traffic authority, and SSC through the COR.

Contractor shall work any calendar day except Saturdays, Sundays, or federal holidays. The length of a working day will be determined by the COR from the number of working hours established by actual job practice by the Contractor, except not less than eight hours will be considered in the determination. Work cannot exceed 40 hours per week without permission of the COR. Work on Saturdays, Sundays, or federal holidays will only be allowed with the permission of the COR or as required by the contract documents.

Schedule Constraints and Deadlines:

The following information is included for accurate contractor bidding purposes:

The Oshkosh Airshow occurs from July 23rd to July 29th. No work in this contract will be allowed for two weeks before or one week after these dates. No exceptions will be considered.

Special Provisions 4 JCN# 1101571

An extended runway closure will occur for this project, to complete work inside the RSA. The runway will be closed for six (6) continuous days. Coordinate this closure with the COR, the SSC and airport operations. Work inside the RSA is only allowed during this scheduled runway closure period.

Precast foundations are required for the PAPI LHA’s to expedite work in the RSA.

All work outside the RSA can be completed with runway 12/30 in full operation.

Night work will not be required.

Contact WE Energies Company a week before a power connection is required from their transformer. WE Energy contact person is Vicki Andrews, (920) 380-3561. Contractor is responsible for coordinating with the power company.

The airport is planning multiple maintenance projects during the runway closure, that is scheduled for this contract. Contractor is responsible for coordinating their construction activates with the airports operations manager, Scott Volberding, through the COR.

The contractor will be able to remove the existing VASI during the runway closure period. The airport is aware and agrees that the airport will be without the use of this visual aid, until the new PAPI passes flight check. Therefore no additional remobilization is required by the contractor.

Construction Schedule Phasing:

No phasing required for this project.

SP-3: Additional Information

1. Utility Agreement: WE Energies Service will bring power to a new transformer, which they will provide and install, adjacent to the new PAPI Power and Control Rack.

Coordinate sequencing and connection to new transformer with the power company.

Tito Stokes is the FAA utility representative. Upon completion of the JAI, the COR shall email the project engineer the meter number(s) and facility ID(s) so the project engineer can notify Real Estate and process the PR for monthly recurring service charges.

Special Provisions 5 JCN# 1101571

2. Utility coordination and contact information: WE Energies Service (800) 662-4797.

Coordinate with airport operations, FAA SSC representatives, and local utility companies to locate existing underground utilities and cabling and for meter work.

3. Runway Safety Area (RSA) Clearance Requirement: N/A.

4. Runway Safety Area: All work inside the RSA will require runway closures. The RSA must meet Part 139 requirements prior to the runway being re-opened. Those requirements include but are not limited to all excavations being backfilled to within 3 inches of surrounding grade and at a maximum 5% slope along with stock piles being removed.

The airport authority will inspect all RSA’s prior to re-opening the runway and the contractor is responsible for ensuring their work areas meet all requirements prior to re-opening.

5. Construction Preparation Contact: Contact the Airport Authority for badging, bonding, and insurance requirements at:

(920) 832-5176

Note: Airport badging procedures may take up to 1-2 days to complete. Begin badging procedures as soon as contract is awarded. The contractor will be allowed to mail or email their ID info to the airport, prior to construction start, to expedite the approval process.

6. Long lead items: The contractor shall be aware that some materials that require submittals are "long lead items!" These submittals must be submitted (any time after award) for approval as soon as possible.

7. Runway Closure: Runway closure shall be coordinated with the Airport Manager and

FAA SSC Manager via the COR. Notice shall be given to the COR no less than 30 days prior to closure.

8. Equipment Outages: The following list of equipment must have a coordinated outage:

Glide Slope (GS), LOC, MALSR and VASI.

Equipment outages shall be coordinated with the Airport Manager and local FAA SSC

Manager via the COR. Notice shall be given to the COR no less than 30 days prior to outage.

9. INSULATED POWER CABLES, 600 V: The following specifications in bold italics replace Specification FAA GL- 918D.

Special Provisions 6 JCN# 1101571

16G.3 INSULATED POWER CABLES, 600 V. Insulation–resistance measurements must be made with both ends of the insulated conductors disconnected from source and load terminals, arresters, and large surge protectors. Apply a 500-volt dc voltage to the conductors being tested with an insulation-resistance test instrument and read the insulation directly on the instrument meter scale. Apply the test voltage for at least

1 minute after the meter reading has stabilized, to allow even distribution of the test voltage throughout the insulation.

Apply the test voltage between each insulated conductor and all other conductors, and between each insulated conductor and ground. Record the measured resistance. It shall be a minimum of 50 megaohms.

10. CONTROL CABLE TESTING: The following specifications in bold italics replace

Specification FAA GL- 918D.

16G.6 CONTROL CABLE TESTING. For continuity, shorts, crosses, and grounds testing, make these tests with both ends of each conductor disconnected from terminal strip jumper wires, surge protectors, and equipment. The tests should be as follows:

a. Continuity Tests. Make continuity tests with an ohmmeter at the near end of the cable. Temporarily short each conductor to its paired conductor, common connector, or to a shield or armor, at the far end of the cable. Record the meter readings. Remove the temporary short at the far end of the cable after each conductor or conductor pair is tested for continuity.

b. Shorts, Crosses, and Grounds Tests. Make the tests with an ohmmeter connected at either end of a cable. Test between all paired or unpaired conductors within a shielded or unshielded conductor group. Test between each conductor and its nearer designated grounding conductor, pair shield, group shield, cable shield, or armor.

For insulation–resistance measurements, apply cable rated dc test voltage to the conductors being tested with an insulation-resistance test instrument, and read the insulation resistance directly on the instrument meter scale. Apply the test voltage for at least 1 minute after the meter has stabilized. Apply the test voltage between paired conductors, between conductors of a conductor group, and between conductors of an ungrouped cable.

Apply the test voltage between each conductor and its designated common grounded conductor, pair-shield, group shield, and overall cable shield or armor. The resistance shall be a minimum of 50 megaohms.

Special Provisions 7 JCN# 1101571

11. Joint Acceptance Inspection: The COR coordinates and schedules the Joint Acceptance

Inspection (JAI) with Patrick Monaghan at (847) 291-8246 in accordance with Order

6010.7B

12. Safety, Health and Hazmat special coordination documents:

The existing VASI in this project is a Hughey and Phillips 2-box VASI. There is no asbestos containing wire insulation on this type of VASI.

13. WORKPLACE SAFETY REQUIREMENTS AND ENVIRONMENTAL CONTROL:

a. In addition to the detailed requirements included in other provisions of this contract, the

Contractor shall comply with all federal, state, and local laws, ordinances, criteria, rules and regulations regarding safety in the work area, human health and environmental protection.

The Contractor is responsible for obtaining all permits, filing any required notifications, and ensuring that employees are properly trained and certified to perform work required under this contract. The Contractor is responsible for compliance with applicable storm water pollution prevention requirements.

b. The FAA considers the Prime Contractor responsible for overall worksite safety and environmental compliance. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent hazardous working conditions from occurring and inspecting operations to ensure that workplace safety and accident prevention requirements are followed.

c. In the event of an accident or incident, the Contractor shall immediately notify the Contracting

Officer and Contracting Officer’s Representative. The Contractor shall complete and submit a written Accident report. In the event of a spill or discharge, the Contractor shall take immediate action to control or contain the release.

d. Throughout this project, the Contractor will ensure that work environments are properly maintained through good housekeeping practices. The Contractor will keep walking areas free of electrical cords and wires and ensure that form and scrap lumber with protruding nails, and all other debris is cleared from work areas and is not stored in an around buildings or other structures. Walkways shall be kept clear of obstructions. Containers equipped with covers shall be provided for the collection and separation of waste, trash, oily and used rags and other refuse. Combustible scrap and debris, garbage and other waste shall be removed and disposed of at frequent and regular intervals. Sufficient lighting will be provided.

e. This project includes the demolition of the AQZA VASI. This VASI was not manufactured with asbestos containing insulation in the wiring harness. No special measures are required for its removal and demolition.

Special Provisions 8 JCN# 1101571

f. When employees are working at heights, working with electrical systems over 50v, are at risk of electrocution or where medical emergency response is not readily available, a two person rule will be implemented and employees must be trained in first aid and CPR. The second person must also be trained in first aid and CPR.

g. Compressed gases may be utilized during welding. The Contractor shall ensure that any workmen in charge of oxygen or fuel-gas supply equipment, including generators and oxygen or fuel-gas distributions, are instructed and judged as being competent for this work. Rules and regulations covering the operation and maintenance of oxygen or fuel-gas supply equipment shall be readily available.

h. All electrical work will be conducted in accordance with current Occupational Safety and Health

Administration (OSHA) standards and NFPA 70E: Standard for Electrical Safety in the Workplace.

Where possible, equipment will be de-energized and site specific lockout/tagout procedures followed before work is conducted. Connections to operational FAA equipment or to power sources that support operational FAA equipment must be made by qualified FAA Technicians. A site specific lockout/tagout plan will be required for the new PAPI. This plan can be based on the existing VASI LOTO procedures if the PAPI is powered in the same way as the VASI. The plan will follow the standard FAA lockout/tagout format, sample templates are available at loto.faa.gov.

i. Handholes and manholes will be constructed as part of this project that could be considered permit required confined spaces since they are large enough to be entered. The Contractor will follow proper confined space entry procedures during construction and when working in these spaces. New permit required confined spaces constructed during this project will be labeled in a manner that is consistent with other similar FAA spaces.

13. Special Notes:

Note to Engineer: Ground resistance testing. Ground shall not exceed 10 Ohm. Test ground with ground resistance meter.

Note to COR: Obtain contractor’s survey data and deliver to project engineer to verify.

Special Provisions 9 JCN# 1101571

SP-4: Government Furnished Material List

Government-Furnished Equipment: All government-furnished property will be made available to the contractor at the preconstruction conference. The contractor shall make arrangements to pick-up all of the items from the airport location, where they are stored and deliver them to the job site or the "on airport" staging area at his expense.

Item NSN Description Qty Unit Installed By

1 8200-00-003-1402-1 DME LED PAPI 1 each Contractor

2 8200-00-055-5659-1 EMT 2” Couplings 32 each Contractor

3 5865-01-295-8895-1 DECODER 1 each Contractor

4 8200-00-001-5276-1 INTERFACE UNIT 1 each Contractor

5 5820-01-295-8893-1 SWITCH ASSEMBLY PANEL 1 each FAA (In tower)

6 5340-01-294-2385-1 SPE MTG. HARDWARE 1 each Contractor

7 5811-01-295-8899-1 RECEIVER 1 each Contractor

8 5985-01-297-4109-1 RECEIVER ANTENNA 1 each Contractor